G. Martellotti CSN1 11 - 10 - 2004 LHCB RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A # gestione overcosti RICH e MU (T. Nakada) RICH cost sharing proposto ad Assisi Total MoU cost (Nov.2000) : 7.7 MCHF Cern 1.0 MCHF (13%) Italy 1.0 (13%) U.K. 5.7 (74%) Total NEW cost : New proposal Cern Italy U.K. 9.85 MCHF 1.56 1.265 7.02 (16%) (13%) (71%) U.K. request to PPARC , Italy request INFN, CERN OK RICH Dopo la CSN1 di Assisi e la successiva LHCb week - Leggera revisione costi (risparmio housing HPD / Genova) chiarimento sui fondi RICH Cern Italy U.K. Total MoU RRB-April 1000 (13%) 1186 1000 (13%) 1000 5700 (74%) 6300 7700 8486 reshuffling New money Cern Italy U.K. Total Now 1559 (16%) 1230 (12.5%) 7018 (71.5%) 9807 new money + 373 (28%) OK + 230 (17%) (richieste) + 718 (54%) (richieste) + 1321 MU Situazione presentata ad Assisi (non cambiata) MUON FUNDING (kCHF) Necessita` per arrivare in porto (*) J u n e 2003 MoU Extra 2003 Cern/Rus Total Common Fund CERN INFN PNPI Brasil 400 340 600 -130 -1220 200 4850 560 1220 CERN-Iron 4000 4000 TOTAL FUND 10830 TOTAL COST 11450 110 400 540 5450 540 El-Spare CORE 130 360 600 10930 130 960 10930 11060 11890 Spares "INST" e-mp 220 90 230 40 75 20 220 320 135 12560 (*) CORE = Overcost Spares = further Electronics spares needed for long term operations "INST" = pre-installation tests at Cern and Installation + man power for increased production at CERN e-mp = man power contributed by muon group collaborators (INFN - trasferte) Il Cern e` disposto a mettere 450 kCHF di soldi nuovi ? T.Nakada RRB RICH situation affected by two problems 1) Re-optimization RICH-1 mechanics and increased HPD coverage 2) Cost increase in the service system and some mechanics MoU 7700 kCHF Now 9807 kCHF (HPD cost increase was compensated by saving in electronics) Funding MoU CERN 1000k CHF GB 5700k CHF IT 1000k CHF +600k in DH for RICH needs Reshuffling +186k saving from re-optimization Additional new cash needed now for RICH CERN 373 kCHF Requests GB 718 kCHF IT 230 kCHF 1.321 kCHF ? T.Nakada RRB Muon situation affected by two problems 1) Brazil defaulting -1220 kCHF for the muon system (-480 kCHF for the common fund) 2) Cost increase MoU 11450 kCHF Now 12560 kCHF Funding MoU Brazil CERN CF 1220 200 0 IT 4850 +4000 (Fe) Reshuffling -1220 +450 +400 Russia 560 -130 saving from re-optimization and exchange of CERN-Russian funding Italy already brought in 730 kCHF new cash Additional new cash needed now for Muon 1500 kCHF 450 kCHF Requests CERN Italy 1050 kCHF # U.K. RICH non avra` una risposta dal PPARC per il RRB # Domani incontro INFN-CSN1, Spokesman LHCb. Non si chiede una decisione prima del RRB. T.Nakada non presentera` una nuova money matrix MU Common Fund CERN ( 3%) INFN ( 71%) PNPI ( 8%) Brasil (18%) TOTAL FUND Underfund CERN-Iron TOTAL COST MoU 200 4850 560 1220 RRB April 400 650 5450 430 0 6830 620 4000 11450 6930 0 4000 10930 Spares CORE ovc Spares "INST" (6%) (5%) (9%) (79%) 130 + + 360 600 220 90 (13%) 230 (77%) (6%) (5%) 130 11060 + 960 11890 220 320 12560 - Cosa si vuole dichiarare come overcosto CORE ? - I fondi extra sarebbero contributi speciali senza variazione dei CF # - profili dispesa CORE e CF - M&O A (A. Smith) COMMON FUND Expected Spending (kCH) 2004 2005 CALO DAH MAGNET OTR INFRASTRUCTURE MUON 1,318 696 600 800 100 785 920 456 1,500 100 TOTAL 3,514 3,761 DETECTOR Totale CF ricevuti 13227 / 18746 ( Italia 1171 / 2850) Al 31 Agosto 2004 : Funds available 5477 Outstanding committements 979 Expected CORE Spending (A. Smith) 2004 CHINA FRANCE GERMANY BMBF GERMANY MPG ITALY NEDERLANDS POLAND ROMANIA RUSSIA SPAIN SWITZERLAND UK UKRAINE CERN CERN iron + Russia TOTALS 2005 1,829 1,029 485 1,525 1,725 1,798 803 274 2,900 1,284 100 316 492 1,066 1,727 15 2,357 110 638 3,382 3,380 12,566 19,687 5,019 TOTAL (RRB-April) 0,072 5,400 2,893 1,366 7,750 4,500 0,360 0,210 1,800 1.430 5,650 7,360 0,140 8,830 4,350 52,111 M&O-A Current Spending for 2004 Item list Present status 2004 Spending Budget kCHF Detector related costs Secretariat Communications On-line computing Test beams, calibration facilities Laboratory operations General services Total 182 20.1 0 61 56 24 114 457.1 0 95 9 90 40 45 230 509 Power 0 120 90% of the expected contributions 2004 received by beginning September. Total spending for the year will amount to about 650 kCHF using the 2003 carry-over (it was agreed in April that we could cover the cost of the gas for RICH1 funded in advance from the CERN group operating budget). Reduced the forecast gas costs projections for later years accordingly. Estimated M&O-A Costs for 2005 Items kCHF Detector related costs Secretariat On-Call communications On-line Computing Test Beams Laboratory Operations General Services Total 120 180 5 180 20 45 320 870 Power 60 Sharing of the Proposed M&O 2005 Budget FUNDING AGENCY BRAZIL CERN CHINA FRANCE IN2P3 GERMANY BMBF GERMANY MPG ITALY INFN NETHERLANDS POLAND ROMANIA RUSSIA SPAIN SWITZERLAND UK UKRAINE TOTAL 339 PhD Equivs 14 52 3 47 10 7 55 17 13 4 32 15 16 50 4 % PhD Equivs. 4.13% 15.34% 0.88% 13.86% 2.95% 2.06% 16.22% 5.01% 3.83% 1.18% 9.44% 4.42% 4.72% 14.75% 1.18% 1 2005 Share 35,929 133,451 7,699 120,619 25,664 17,965 141,150 43,628 33,363 10,265 82,124 38,496 41,062 128,319 10,265 870,000 Power Share 2,478 Total Cat A plus Power 38,407 531 8,230 708 4,723 10,973 86,847 708 9,148 10,973 Sommario M&O-A M&O-A 2003 totale fatture emesse per 464 kCHF Chiusura con un carry-over (2002+2003) = 370.7 kCHF + 86.4 INFN - 31.8 from Brazil, China, Poland, Romania, Ukraine Autorizzazione dallo SG a pagare coi fondi residui il Gas per il riempimento del RICH ~ 150 kCHF M&O-A 2004 totale fatture emesse per 509 kCHF INFN = 93 kCHF - pagata E` prevista una chiusura con spesa di ~ 650 kCHF con uso di parte del carry-over 2003 M&O-A 2005 previsione di spesa 870 kCHF La parte INFN e` diminuita con la revisione dello sharing successiva al RRB di Aprile INFN = 141 kCHF SPARE TRANSPARENCIES Dettaglio dei costi / overcosti e proposta di sharing delle spese ITEM MWPC material Mechanics/Integration Gas system MWPC Gas system GEM GEM HV system Tooling & assembl PNPI-1 Tooling & assembl PNPI-2 (60 for PNPI-2 from INTAS) Chamber System Contingen MWPC / cabling Electronics Electronics spares Total Total INFN Overcost 2200 500 1820 350 280 310 40 60 410 530 230 330 180 60 40 200 100 60 60 40 -60 170 -60 4060 1050 150 2700 550 50 2870 130 M.P. CERN 1my@40ksf/y M.P. PNPI (at CERN) 1my Iron in kind Overcost + Spares + INST 220 40 60 410 2750 130 Spares INST Cern+CF Overcost 40 90 380 150 80 310 190 20 PNPI 10 530 10 50 130 100 820 360 10 540 120 220 40 40 40 40 4000 11060 INST 4000 1500 5580 600 220 230 4940 360 90 540 RRB Aprile 2004 CORE Spesi 2003 6157 COMMON FUNDS 2841 Italy=1500 Planned 2004 11452 Planned 2005 17111 3514 Italy=1200 Italy=4100 3761 All numbers in kCHF RRB Aprile 2004 M&O categ. A (in kCHF) power Planned Profile 2005 870 (60) 2006 1976 (728) 2007 2447 (903) 2008 2427 (903) INFN CORE spending profile (kCHF – already spent or approved) Anni Common Fund <2002 2003 670 Detector Mu 2004 2005 500 1416 2006 2007 Total 2850 670 460 3530 ? Electronics Mu 475 1800 3100 ? RICH 330 430 1230 ? Trigger Calo 50 200 430 10 870 DAH TOTAL 670 1916 1525 2900 3530 contains also the cost of installation 3100 contains also the cost of spares