G.Martellotti CSN1 – 3 Febbraio 2004
LHCb
# nuova Cost-Funding Matrix
Aggiornamento su
- stato generale del funding / firme del MoU
- ultime stime dei costi di LHCb dopo la riottimizzazione
dell’apparato e la scelta dei fotorivelatori del RICH
 richiesti spostamenti di fondi
- dettagli dello stato del funding dei Mu
# Approvazione Progetti INTAS (Camere Mu e Aerogel)
 richiesta sblocco Sub Judice
# Fattura M&O-A 2004  richiesta sblocco Sub Judice
# Stato del RICH - partenza gara HPD
 (Clara)
Funding situation (MCHF)
Funding country
Brazil
China
FR(IN2P3)
DE(BMBF)
(MPG)
IT
NL
Poland
Romania
Russia
Spain
Switzerland
UK
Ukraine
CERN
Total
T.N. – RRB 22-10-03
MoU Now
Comments
1.7
0
MoU not signed
0.25 0.1
New : possible increase of 0.450
7.5 7.5
extra engineering effort by Annecy
4.8 3.76 MoU to be signed. New MPI request not approved
2.2 2.2
(some uncertainty)
10 10.6
extra contribution to Muon
6.3 6.3
0.5 0.5
MoU to be signed
0.3 0.3
3
2.5 shifted to machine, CERN partially compensates
2
2
7.9 7.9
10.3 10.3
0.2 0.2
16.35 16.7
inclu. muon Fe and Russian compensation
73.3 70.86
The LHCb detector
Reduced number of layers for M1 (4  2)
Reduced number of tracking stations behind the magnet (4  3)
No tracking chambers in the magnet
No B field shielding plate
Changes were made for
Full Si station
material reduction and
Reoptimized RICH-1 design
L1 trigger improvement
Reduced number of VELO stations (25  21)
Updated cost of the experiment (MCHF)
Cost D from MoU Comment
4.82
-0.28 MoU included Pile-Up trigger
2.47
Now all Si TT
+0.72
3.40
6.23
-3.86 10  3 stations
9.57
+1.87 New RICH1
+0.79
8.49
MaPMT analog  HPD *
-0.30
Calo
15.06
-0.52
Muon detect.
6.93
Muon Fe
4.00
0
L0 Trig
2.26
Pile-Up trigger added
DAQ&CPU(L1/HTL)
5.71
+0.06
ECS&TFC + C.Infra.
2.29
Experiment infra.
4.00
0
Magnet
6.00
0
* La scelta definitiva dei foto rivelatori e` posteriore al RRB di Ottobre. Il costo
finale del RICH tiene anche conto di un probabile aumento di ~300 kCHF
Subsystem
VELO
IT
TT
OT
RICH
Total 71.66 (-3.39 rispetto ai costi (non ai fondi) previsti nel MoU)
Bilancio :
senza eventuale
aumento Cina
Current funding
Current detector cost
Balance
70.86 MCHF
71.66
- 0.8
La situazione e` buona ma la “cost-funding matrix” deve
essere ritoccata per tener conto dei cambiamenti dovuti alla
riottimizzazione di LHCb e dei fondi attualmente disponibili.
T.Nakada – RRB 22-10-03 :
The LHCb collaboration ask the RRB to support the principle of
shifting the funding allocations among different subsystems in
agreement with the parties concerned.
Two guidelines for the revision:
1) Move first CERN and Common Funds to balance
2) Move national funding among the already committed subsystems
Il RRB ha accettato il principio di ridistribuzione
(e non ha ritenuto necessario un addendum al MoU)
Cost-Funding Matrix presentata al RRB di Ottobre
(come base di discussione in LHCb)
Total CF
Project VELO
fundingfundingfunding
Funding Agency
Brasil
China
100
28
72
France IN2P3
7 500 2 100 5 400
Germany BMBF
3 757
864 2 893
Germany MPG
2 200
834 1 366
Italy INFN
10 000 2 850 7 150
Italy INFN spec. contr
600
600
Netherlands
6 300 1 800 4 500
Poland
500
140
360
Romania
300
90
210
Russia
2 500
700 1 800
Spain
2 000
570 1 430
Switzerland
7 900 2 250 5 650
UK
10 300 2 940 7 360
Ukraine
200
60
140
CERN
12 350 3 520 8 830
CERN spec. in kind contr4 000
4 000
CERN spec. Russian comp.350
350
From CF
Total project
52 111
Total CF
18 746
Total funding
70 857 18 746 52 111
Updated Cost (Sep 03) 72 734
Funding balance
RRB Oct. 2003
-1 877
ST
OT
RICH
PS/SPD
ECAL
HCAL
MUON L0 Trig
DAQ+ ECS,TFC Infra Magnet
farm Comp. inf.
72
1 220
370
356
1 366
2 000
600
1 000
1 250
2 142
1 060
1 580
2 167
4 850
600
3 000
360
430
870
250
215
430
800
2 508
582
210
573
430
500
200
500
900
1 585
6 300
70
559
4 822
5 659
4 822
5 659
631
5 599
631
6 230
4 822
5 870
6 230
- 211
2 020
70
1 480
9 066
40
760
1 905
760
2 665
100
3 210
4 702
3 210
7 912
100
1 320
3 033
1 320
4 353
520
4 000
110
400
10 510
400
10 910
9 566
2 700
7 960
4 400
10 930
- 500
- 35
- 48
- 47
- 20
1 766
9 066
2 260
2 425
2 270
2 425
4 695
2 260
5 711
2 260
4 000
6 000
4 000
2 285 4 000
6 000
6 000
2 285 4 000
6 000
2 285
-1 016
Updated RICH Cost : 8486  underfunding ridotto va ridistribuito
Country (subsystem)
CERN (ST)
CERN (OT)
CERN (RICH)
CERN (Muon)
CERN (Online)
IT (Muon)
IT (Trigger)
IT (Online)
UK (RICH)
UK (Online)
DE(ST)
DE(OT)
DE(Online)
DE(CF)
CF (Muon)
CF (OT)
CF (Online)
CF(Calo)
CF(reduction)
MoU New
0.00  0.77
3.40  0.00
1.00  1.19
0.20  0.54
0.73  2.83
4.85  5.45
0.80  0.43
0.50  0.87
5.70  6.30
0.60 0.00
1.69  1.72
1.92  2.17
1.02  0.00
2.00  1.70
0.00  0.40
0.90  0.63
3.50  2.43
5.31  5.29
0.00  0.96
New model for redistribution (MCHF)
adjusting for the overall situation
0.6 extra contribution
due to cost reduction
increased responsibility
adjusting for the RICH cost
increase
adjusting for the BMBF rejection
for the MPI funding request
adjusting for no Brazilian funding
due to reduced funding
Nuova proposta di Cost-Funding Matrix
che sara` portata in discussione al prossimo CB di LHCb
Total CF
Project VELO
fundingfundingfunding
Funding Agency
Brasil
China
100
28
72
France IN2P3
7 500 2 100 5 400
Germany BMBF
3 757
864 2 893
Germany MPG
2 200
834 1 366
Italy INFN
10 000 2 850 7 150
Italy INFN spec. contr
600
600
Netherlands
6 300 1 800 4 500
Poland
500
140
360
Romania
300
90
210
Russia
2 500
700 1 800
Spain
2 000
570 1 430
Switzerland
7 900 2 250 5 650
UK
10 300 2 940 7 360
Ukraine
200
60
140
CERN
12 350 3 520 8 830
CERN spec. in kind contr4 000
4 000
CERN spec. Russian comp.350
350
From CF
Total project
52 111
Total CF
18 746
Total funding
70 857 18 746 52 111
Updated Cost (Sep 03) 71 654
Funding balance
RRB Oct. 2003
- 797
ST
OT
RICH
PS/SPD
ECAL
HCAL
MUON L0 Trig
DAQ+ ECS,TFC Infra Magnet
farm Comp. inf.
72
1 220
370
356
1 366
2 000
600
1 000
1 250
2 142
1 060
1 580
2 167
4 850
600
3 000
360
430
870
250
215
430
800
2 508
582
210
573
430
500
200
500
1 249
1 585
6 300
70
770
2 020
70
1 480
8 486
40
760
1 905
760
2 665
100
3 210
4 702
3 210
7 912
100
1 320
3 033
1 320
4 353
540
4 000
110
400
10 530
400
10 930
8 486
2 700
7 960
4 400
10 930
- 35
- 48
- 47
1 186
4 822
5 870
4 822
5 870
631
5 599
631
6 230
4 822
5 870
6 230
8 486
2 260
2 425
2 619
2 425
5 044
2 260
5 711
2 260
4 000
6 000
4 000
2 285 4 000
6 000
6 000
2 285 4 000
6 000
2 285
- 667
- Azzerato l’underfunding di ST, RICH, MU - Diminuito
l’uderfunding del DAQ (underfunding = ~20% delle CPU)
Le CPU saranno comprate piu` tardi possibile (>2005)
Sommario finanziamenti
INFN :
(non ci sono novita` rispetto a Settembre)
Common funds
RICH
MoU
2850
1000
Muon detector
Trigger Calo
DAH/L1&HLT
4850
800
500
Adesso
2850
1000
+ 600
- 370
+ 370
5450 *
430
870
* + 130 for electronics spares ( M&O-B)
Funding del rivelatore MU
MoU
Common Fund
CERN
INFN
PNPI +spec Russia CERN
Total
Detector COST
200
4850
560
5610
6930
Giugno ‘03
200
200
600 + 130 MOF
Adesso
+ 200
+ 140
- 130 + 110
+ 320
1000
400
540
5450
540
6930
+ 130 MOF
Underfunding
320 kCHF
Staging
parte di M4
Non piu`
Underfunding
No Staging
I due progetti INTAS sono stati approvati
- MU Coordinatore: P.L. Campana
Proposal 5571: Development of muon chambers for LHCb
CERN, INFN (LNF, Fi, RM2), MARSIGLIA, PNPI + ITEP (Russia)
si guadagna denaro CORE per ~ 60 kCHF per la costruzione di
camere al PNPI (il contributo INFN stimato e` di 230 kCHF)
 assegn. 2004 : 30 kE (consumo LNF) S.J. alla approvazione
- Aerogel
Coordinatore: C. Matteuzzi
Proposal 5579: Applications of Aerogel in particle physics
INFN (Mi), CNRS/IN2P3, BINP + BIC (Russia)
si studiera` la possibilita` di avere i 5 cm di spessore dell’ Aerogel
in un solo strato.
 assegn. 2004 : 20 kE (consumo Mi) S.J. alla approvazione
Chiediamo lo sblocco dei S.J.
# e` arrivata la fattura CERN dei M&O-A 2004 (93.490 CHF)
- finanziati 40 kE + 25 kE s.j. richiesto sblocco del S.J.