G.Martellotti CSN1 – 3 Febbraio 2004 LHCb # nuova Cost-Funding Matrix Aggiornamento su - stato generale del funding / firme del MoU - ultime stime dei costi di LHCb dopo la riottimizzazione dell’apparato e la scelta dei fotorivelatori del RICH richiesti spostamenti di fondi - dettagli dello stato del funding dei Mu # Approvazione Progetti INTAS (Camere Mu e Aerogel) richiesta sblocco Sub Judice # Fattura M&O-A 2004 richiesta sblocco Sub Judice # Stato del RICH - partenza gara HPD (Clara) Funding situation (MCHF) Funding country Brazil China FR(IN2P3) DE(BMBF) (MPG) IT NL Poland Romania Russia Spain Switzerland UK Ukraine CERN Total T.N. – RRB 22-10-03 MoU Now Comments 1.7 0 MoU not signed 0.25 0.1 New : possible increase of 0.450 7.5 7.5 extra engineering effort by Annecy 4.8 3.76 MoU to be signed. New MPI request not approved 2.2 2.2 (some uncertainty) 10 10.6 extra contribution to Muon 6.3 6.3 0.5 0.5 MoU to be signed 0.3 0.3 3 2.5 shifted to machine, CERN partially compensates 2 2 7.9 7.9 10.3 10.3 0.2 0.2 16.35 16.7 inclu. muon Fe and Russian compensation 73.3 70.86 The LHCb detector Reduced number of layers for M1 (4 2) Reduced number of tracking stations behind the magnet (4 3) No tracking chambers in the magnet No B field shielding plate Changes were made for Full Si station material reduction and Reoptimized RICH-1 design L1 trigger improvement Reduced number of VELO stations (25 21) Updated cost of the experiment (MCHF) Cost D from MoU Comment 4.82 -0.28 MoU included Pile-Up trigger 2.47 Now all Si TT +0.72 3.40 6.23 -3.86 10 3 stations 9.57 +1.87 New RICH1 +0.79 8.49 MaPMT analog HPD * -0.30 Calo 15.06 -0.52 Muon detect. 6.93 Muon Fe 4.00 0 L0 Trig 2.26 Pile-Up trigger added DAQ&CPU(L1/HTL) 5.71 +0.06 ECS&TFC + C.Infra. 2.29 Experiment infra. 4.00 0 Magnet 6.00 0 * La scelta definitiva dei foto rivelatori e` posteriore al RRB di Ottobre. Il costo finale del RICH tiene anche conto di un probabile aumento di ~300 kCHF Subsystem VELO IT TT OT RICH Total 71.66 (-3.39 rispetto ai costi (non ai fondi) previsti nel MoU) Bilancio : senza eventuale aumento Cina Current funding Current detector cost Balance 70.86 MCHF 71.66 - 0.8 La situazione e` buona ma la “cost-funding matrix” deve essere ritoccata per tener conto dei cambiamenti dovuti alla riottimizzazione di LHCb e dei fondi attualmente disponibili. T.Nakada – RRB 22-10-03 : The LHCb collaboration ask the RRB to support the principle of shifting the funding allocations among different subsystems in agreement with the parties concerned. Two guidelines for the revision: 1) Move first CERN and Common Funds to balance 2) Move national funding among the already committed subsystems Il RRB ha accettato il principio di ridistribuzione (e non ha ritenuto necessario un addendum al MoU) Cost-Funding Matrix presentata al RRB di Ottobre (come base di discussione in LHCb) Total CF Project VELO fundingfundingfunding Funding Agency Brasil China 100 28 72 France IN2P3 7 500 2 100 5 400 Germany BMBF 3 757 864 2 893 Germany MPG 2 200 834 1 366 Italy INFN 10 000 2 850 7 150 Italy INFN spec. contr 600 600 Netherlands 6 300 1 800 4 500 Poland 500 140 360 Romania 300 90 210 Russia 2 500 700 1 800 Spain 2 000 570 1 430 Switzerland 7 900 2 250 5 650 UK 10 300 2 940 7 360 Ukraine 200 60 140 CERN 12 350 3 520 8 830 CERN spec. in kind contr4 000 4 000 CERN spec. Russian comp.350 350 From CF Total project 52 111 Total CF 18 746 Total funding 70 857 18 746 52 111 Updated Cost (Sep 03) 72 734 Funding balance RRB Oct. 2003 -1 877 ST OT RICH PS/SPD ECAL HCAL MUON L0 Trig DAQ+ ECS,TFC Infra Magnet farm Comp. inf. 72 1 220 370 356 1 366 2 000 600 1 000 1 250 2 142 1 060 1 580 2 167 4 850 600 3 000 360 430 870 250 215 430 800 2 508 582 210 573 430 500 200 500 900 1 585 6 300 70 559 4 822 5 659 4 822 5 659 631 5 599 631 6 230 4 822 5 870 6 230 - 211 2 020 70 1 480 9 066 40 760 1 905 760 2 665 100 3 210 4 702 3 210 7 912 100 1 320 3 033 1 320 4 353 520 4 000 110 400 10 510 400 10 910 9 566 2 700 7 960 4 400 10 930 - 500 - 35 - 48 - 47 - 20 1 766 9 066 2 260 2 425 2 270 2 425 4 695 2 260 5 711 2 260 4 000 6 000 4 000 2 285 4 000 6 000 6 000 2 285 4 000 6 000 2 285 -1 016 Updated RICH Cost : 8486 underfunding ridotto va ridistribuito Country (subsystem) CERN (ST) CERN (OT) CERN (RICH) CERN (Muon) CERN (Online) IT (Muon) IT (Trigger) IT (Online) UK (RICH) UK (Online) DE(ST) DE(OT) DE(Online) DE(CF) CF (Muon) CF (OT) CF (Online) CF(Calo) CF(reduction) MoU New 0.00 0.77 3.40 0.00 1.00 1.19 0.20 0.54 0.73 2.83 4.85 5.45 0.80 0.43 0.50 0.87 5.70 6.30 0.60 0.00 1.69 1.72 1.92 2.17 1.02 0.00 2.00 1.70 0.00 0.40 0.90 0.63 3.50 2.43 5.31 5.29 0.00 0.96 New model for redistribution (MCHF) adjusting for the overall situation 0.6 extra contribution due to cost reduction increased responsibility adjusting for the RICH cost increase adjusting for the BMBF rejection for the MPI funding request adjusting for no Brazilian funding due to reduced funding Nuova proposta di Cost-Funding Matrix che sara` portata in discussione al prossimo CB di LHCb Total CF Project VELO fundingfundingfunding Funding Agency Brasil China 100 28 72 France IN2P3 7 500 2 100 5 400 Germany BMBF 3 757 864 2 893 Germany MPG 2 200 834 1 366 Italy INFN 10 000 2 850 7 150 Italy INFN spec. contr 600 600 Netherlands 6 300 1 800 4 500 Poland 500 140 360 Romania 300 90 210 Russia 2 500 700 1 800 Spain 2 000 570 1 430 Switzerland 7 900 2 250 5 650 UK 10 300 2 940 7 360 Ukraine 200 60 140 CERN 12 350 3 520 8 830 CERN spec. in kind contr4 000 4 000 CERN spec. Russian comp.350 350 From CF Total project 52 111 Total CF 18 746 Total funding 70 857 18 746 52 111 Updated Cost (Sep 03) 71 654 Funding balance RRB Oct. 2003 - 797 ST OT RICH PS/SPD ECAL HCAL MUON L0 Trig DAQ+ ECS,TFC Infra Magnet farm Comp. inf. 72 1 220 370 356 1 366 2 000 600 1 000 1 250 2 142 1 060 1 580 2 167 4 850 600 3 000 360 430 870 250 215 430 800 2 508 582 210 573 430 500 200 500 1 249 1 585 6 300 70 770 2 020 70 1 480 8 486 40 760 1 905 760 2 665 100 3 210 4 702 3 210 7 912 100 1 320 3 033 1 320 4 353 540 4 000 110 400 10 530 400 10 930 8 486 2 700 7 960 4 400 10 930 - 35 - 48 - 47 1 186 4 822 5 870 4 822 5 870 631 5 599 631 6 230 4 822 5 870 6 230 8 486 2 260 2 425 2 619 2 425 5 044 2 260 5 711 2 260 4 000 6 000 4 000 2 285 4 000 6 000 6 000 2 285 4 000 6 000 2 285 - 667 - Azzerato l’underfunding di ST, RICH, MU - Diminuito l’uderfunding del DAQ (underfunding = ~20% delle CPU) Le CPU saranno comprate piu` tardi possibile (>2005) Sommario finanziamenti INFN : (non ci sono novita` rispetto a Settembre) Common funds RICH MoU 2850 1000 Muon detector Trigger Calo DAH/L1&HLT 4850 800 500 Adesso 2850 1000 + 600 - 370 + 370 5450 * 430 870 * + 130 for electronics spares ( M&O-B) Funding del rivelatore MU MoU Common Fund CERN INFN PNPI +spec Russia CERN Total Detector COST 200 4850 560 5610 6930 Giugno ‘03 200 200 600 + 130 MOF Adesso + 200 + 140 - 130 + 110 + 320 1000 400 540 5450 540 6930 + 130 MOF Underfunding 320 kCHF Staging parte di M4 Non piu` Underfunding No Staging I due progetti INTAS sono stati approvati - MU Coordinatore: P.L. Campana Proposal 5571: Development of muon chambers for LHCb CERN, INFN (LNF, Fi, RM2), MARSIGLIA, PNPI + ITEP (Russia) si guadagna denaro CORE per ~ 60 kCHF per la costruzione di camere al PNPI (il contributo INFN stimato e` di 230 kCHF) assegn. 2004 : 30 kE (consumo LNF) S.J. alla approvazione - Aerogel Coordinatore: C. Matteuzzi Proposal 5579: Applications of Aerogel in particle physics INFN (Mi), CNRS/IN2P3, BINP + BIC (Russia) si studiera` la possibilita` di avere i 5 cm di spessore dell’ Aerogel in un solo strato. assegn. 2004 : 20 kE (consumo Mi) S.J. alla approvazione Chiediamo lo sblocco dei S.J. # e` arrivata la fattura CERN dei M&O-A 2004 (93.490 CHF) - finanziati 40 kE + 25 kE s.j. richiesto sblocco del S.J.