CIGRE SC C2
Power System Operation and Control
24 Novembre 2010, Latina
CIGRE SC C2 Power System Operation and Control
Nuovi regular members:
Nuovi membri osservatori:
 Flavio Allella, Italy

Roberto Barba, Ecuador
 Siem Bruijns, Netherlands

Jasenko Dobranic, Bosnia Herzegovina
 Yves Harmand, France

David Haim, Israel
 Eung-Soo Jung, Korea

Anna Jäderström, Sweden
 Alan Mac Naughton, Canada

Dimitros Michos, Greece
 Mark Miller, Australia
 Lajos Oroszki, Hungary
 Udo Spanel, Germany
2
Latina, 24 novembre 2010
CIGRE SC C2 Power System Operation and Control
STRUTTURA ORGANIZZATIVA prima della Sessione 2010 di Parigi
JWG C2/C5
O. Gjerde, Norway
JWG C1/C2/C6
H Jones,Ireland
AG.1
Nisheeth Singh, Switzerland
Real time System
Operation and Control
WG
1 Active Working Group
C2.13 - Voltage and Var support in
System Operation
SC C2 Chairman (J. Vanzetta, DE)
Secretary (C. Schneiders, DE)
AG.2
Teresa Carolin, S. Africa
System Operational
Planning and
Performance Analysis
WG
WG
2 Active Working Groups
C2.21 - Lessons learnt from recent Emergencies and
Blackout Incidents
C2.22 - Application of resilience engineering to safety
3
management principles in Control Centers,
ensuring and
enhancing power system reliability
AG.3
Hugh Jones,Ireland
Control Centre Infrastructure and
Human Resources for
System Operation
WG
WG
2 Active Working Groups
C2.33 - Control centre operator
Requirements, Selection, Training
C2.34 - Capabilities and requirements of a
control centre in the 21st century
CIGRE SC C2 Power System Operation and Control
FOCUS su gruppi nuovi avviati con la Sessione di Parigi 2010
AG.1
Nisheeth Singh, Switzerland
WG WG WG
WG
1 Active WG+ 3 New WGs
C2.13 - Voltage and Var support in
System Operation
C2.12 - Applications of
Synchronised phasor
Measurements in Power
System Operation
C2.15 - Common information
model and its prospective use in
power system operation
C2.16 - Challenges in Control
Centre posed by Distributed
generation and Renewables
AG.2
Teresa Carolin, S. Africa
WG
WG
AG.3
Hugh Jones,Ireland
WG
2 Active WGs
C2.21 - Lessons learnt from recent Emergencies and
Blackout Incidents
C2.22 - Application of resilience engineering to safety
4 Centers, ensuring and
management principles in Control
enhancing power system reliability
4
WG
2 Active WGs
C2.33 - Control centre operator
Requirements, Selection, Training
C2.34 - Capabilities and requirements of a
control centre in the 21st century
Latina, 24 novembre 2010
CIGRE SC C2 Power System Operation and Control
Temi principali per la Sessione 2012
1.
2.
Challenges in operation caused by the combination of intermittent generation (Wind,
PV, etc.) and changes in electrical loads behaviour :

Power balancing

Congestion management

Frequency and voltage control
Evolution of power system control at Continental, Country, Regional and local levels:

Improve the awareness of the overall system status in interconnected system
with several control areas

Display of interconnected areas and trigger signals to operators. Visualization
techniques

Information exchange and operational interfaces between

TSO and other actors: production and load centres
5
Latina, 24 novembre 2010
CIGRE SC C2 Power System Operation and Control
Contributo del C2 al TC project
“The Network of the Future”
Ruolo attivo sul tema tecnico
TI5: New concepts for system
operation, control
Key challenges
1. Challenges in operation caused by the combination of stochastic
generation (wind,solar,tidal etc...) and changes in electrical loads
behaviour due to demand side management heavily influenced by
pricing mechanism and efficient management of energy storage for
the short and long term.
• Power balancing
• Congestion management
• Active and reactive reserve
• Implement Risk management techniques and introduction of
probabilistic approaches
2. Evolution of power system control at Continental, Country,
Regional and local levels
• Improve the awareness of the overall system status in
interconnected system with several control areas,
• Define the boundaries between TSO and DSO systems in
terms of Operational Control
• Display of interconnected areas and trigger signals to operators
with visualisation techniques
• Information exchange and operational interfaces between TSO
and other actors: production and load centres
3. Significant Increased level of automation in the control
rooms
• New software tools to quickly determine the status of the
system over wide area and to alarm system operators
• Automated adjustment of the configuration and electrical
parameters of the system
• Automated service restoration and adapted disaster recovery
scenarios
4. Assure the competencies and adapt the training of System
6
operators
CIGRE SC C2 Power System Operation and Control
Contributo del C2 al TC project “Energy Efficiency”
Ruolo attivo del WG C2.13
WG che contribuisce al TC
Aree di attenzione per il C2
Obiettivi
1. Sviluppo di tools e sistemi di
supporto alle decisioni degli
operatori per minimizzare le
perdite di sistema.
1. Penetrazione delle fonti
rinnovabili.
WG C2.13 Voltage and VAR support
in system operation
2. Congestioni risultanti dalla
massiva penetrazione delle
rinnovabili.
2. Criteri di gestione della
domanda attiva per spianare la
curva di carico.
7
Possibili sviluppi futuri
1. Definizione degli assetti di rete
che minimizzano le perdite.
2. Efficienza del bilanciamento in
presenza di significativa
generazione rinnovabile.
3. Tecnologie HVDC and Facts
per la gestione della trasmissione
su lunghe distanze per
minimizzare le perdite.
Latina, 24 novembre 2010
CIGRE SC C2 Power System Operation and Control
Sintesi della riunione del 25 agosto 2010 a Parigi.
La Sessione Tecnica, presieduta dal presidente uscente M. Armstrong (Canada) con l’assistenza degli special reporters A.
Bose e J. P. Desbrosses, ha focalizzato l’attenzione sui seguenti due temi di grande attualità per i sistemi elettrici di potenza:
il miglioramento dell’affidabilità di esercizio e il coordinamento del controllo operativo.
Nell’ambito del primo tema, sono stati analizzati gli impatti delle valutazioni della sicurezza dinamica e della determinazione
dinamica delle portate degli elementi di rete sul controllo in tempo reale. Con particolare riferimento a quest’ultimo aspetto,
sono state presentate sperimentazioni interessanti che confermano l’elevata dipendenza delle portate dalle condizioni
ambientali esterne. Sistemi di determinazione dinamica delle stesse, basati sulla misurazione dei parametri esterni effettivi,
potrebbero consentire agli operatori di rete di superare i metodi di valutazione convenzionali e, generalmente, conservativi
ad oggi in gran parte adottati. Sono state inoltre approfondite proposte innovative relative allo sviluppo di metodologie e
strumenti a supporto delle decisioni nelle sale operative, nonché le tematiche dell’utilizzo ottimale delle reti a fronte della
crescente penetrazione della generazione intermittente, in particolare di quella da fonte eolica.
Con riferimento al secondo tema, sono stati presentati i primi ritorni di esperienza dai progetti in corso, in gran parte europei,
in tema di coordinamento operativo tra gestori di rete. Il coordinamento riguarda soprattutto la fase di preparazione
all’esercizio delle reti. Particolare attenzione è stata altresì dedicata agli aspetti di armonizzazione delle regole operative e
dei quadri regolatori.
La riunione annuale del Comitato ha visto il passaggio di consegne al nuovo presidente J. Vanzetta (Germania).
Relativamente alle attività in corso nel Comitato, sono stati presentati i progressi sui temi della regolazione secondaria di
tensione, sulle misure di prevenzione del collasso di tensione e sui requisiti dinamici per gli aerogeneratori. Inoltre, si sono
trattati gli aspetti della resilienza dei centri di controllo e delle nuove esigenze in materia di addestramento degli operatori,
con particolare attenzione agli aspetti di certificazione.
8
Latina, 24 novembre 2010
Scarica

Presentazione 2010