CIGRE SC C2 Power System Operation and Control 24 Novembre 2010, Latina CIGRE SC C2 Power System Operation and Control Nuovi regular members: Nuovi membri osservatori: Flavio Allella, Italy Roberto Barba, Ecuador Siem Bruijns, Netherlands Jasenko Dobranic, Bosnia Herzegovina Yves Harmand, France David Haim, Israel Eung-Soo Jung, Korea Anna Jäderström, Sweden Alan Mac Naughton, Canada Dimitros Michos, Greece Mark Miller, Australia Lajos Oroszki, Hungary Udo Spanel, Germany 2 Latina, 24 novembre 2010 CIGRE SC C2 Power System Operation and Control STRUTTURA ORGANIZZATIVA prima della Sessione 2010 di Parigi JWG C2/C5 O. Gjerde, Norway JWG C1/C2/C6 H Jones,Ireland AG.1 Nisheeth Singh, Switzerland Real time System Operation and Control WG 1 Active Working Group C2.13 - Voltage and Var support in System Operation SC C2 Chairman (J. Vanzetta, DE) Secretary (C. Schneiders, DE) AG.2 Teresa Carolin, S. Africa System Operational Planning and Performance Analysis WG WG 2 Active Working Groups C2.21 - Lessons learnt from recent Emergencies and Blackout Incidents C2.22 - Application of resilience engineering to safety 3 management principles in Control Centers, ensuring and enhancing power system reliability AG.3 Hugh Jones,Ireland Control Centre Infrastructure and Human Resources for System Operation WG WG 2 Active Working Groups C2.33 - Control centre operator Requirements, Selection, Training C2.34 - Capabilities and requirements of a control centre in the 21st century CIGRE SC C2 Power System Operation and Control FOCUS su gruppi nuovi avviati con la Sessione di Parigi 2010 AG.1 Nisheeth Singh, Switzerland WG WG WG WG 1 Active WG+ 3 New WGs C2.13 - Voltage and Var support in System Operation C2.12 - Applications of Synchronised phasor Measurements in Power System Operation C2.15 - Common information model and its prospective use in power system operation C2.16 - Challenges in Control Centre posed by Distributed generation and Renewables AG.2 Teresa Carolin, S. Africa WG WG AG.3 Hugh Jones,Ireland WG 2 Active WGs C2.21 - Lessons learnt from recent Emergencies and Blackout Incidents C2.22 - Application of resilience engineering to safety 4 Centers, ensuring and management principles in Control enhancing power system reliability 4 WG 2 Active WGs C2.33 - Control centre operator Requirements, Selection, Training C2.34 - Capabilities and requirements of a control centre in the 21st century Latina, 24 novembre 2010 CIGRE SC C2 Power System Operation and Control Temi principali per la Sessione 2012 1. 2. Challenges in operation caused by the combination of intermittent generation (Wind, PV, etc.) and changes in electrical loads behaviour : Power balancing Congestion management Frequency and voltage control Evolution of power system control at Continental, Country, Regional and local levels: Improve the awareness of the overall system status in interconnected system with several control areas Display of interconnected areas and trigger signals to operators. Visualization techniques Information exchange and operational interfaces between TSO and other actors: production and load centres 5 Latina, 24 novembre 2010 CIGRE SC C2 Power System Operation and Control Contributo del C2 al TC project “The Network of the Future” Ruolo attivo sul tema tecnico TI5: New concepts for system operation, control Key challenges 1. Challenges in operation caused by the combination of stochastic generation (wind,solar,tidal etc...) and changes in electrical loads behaviour due to demand side management heavily influenced by pricing mechanism and efficient management of energy storage for the short and long term. • Power balancing • Congestion management • Active and reactive reserve • Implement Risk management techniques and introduction of probabilistic approaches 2. Evolution of power system control at Continental, Country, Regional and local levels • Improve the awareness of the overall system status in interconnected system with several control areas, • Define the boundaries between TSO and DSO systems in terms of Operational Control • Display of interconnected areas and trigger signals to operators with visualisation techniques • Information exchange and operational interfaces between TSO and other actors: production and load centres 3. Significant Increased level of automation in the control rooms • New software tools to quickly determine the status of the system over wide area and to alarm system operators • Automated adjustment of the configuration and electrical parameters of the system • Automated service restoration and adapted disaster recovery scenarios 4. Assure the competencies and adapt the training of System 6 operators CIGRE SC C2 Power System Operation and Control Contributo del C2 al TC project “Energy Efficiency” Ruolo attivo del WG C2.13 WG che contribuisce al TC Aree di attenzione per il C2 Obiettivi 1. Sviluppo di tools e sistemi di supporto alle decisioni degli operatori per minimizzare le perdite di sistema. 1. Penetrazione delle fonti rinnovabili. WG C2.13 Voltage and VAR support in system operation 2. Congestioni risultanti dalla massiva penetrazione delle rinnovabili. 2. Criteri di gestione della domanda attiva per spianare la curva di carico. 7 Possibili sviluppi futuri 1. Definizione degli assetti di rete che minimizzano le perdite. 2. Efficienza del bilanciamento in presenza di significativa generazione rinnovabile. 3. Tecnologie HVDC and Facts per la gestione della trasmissione su lunghe distanze per minimizzare le perdite. Latina, 24 novembre 2010 CIGRE SC C2 Power System Operation and Control Sintesi della riunione del 25 agosto 2010 a Parigi. La Sessione Tecnica, presieduta dal presidente uscente M. Armstrong (Canada) con l’assistenza degli special reporters A. Bose e J. P. Desbrosses, ha focalizzato l’attenzione sui seguenti due temi di grande attualità per i sistemi elettrici di potenza: il miglioramento dell’affidabilità di esercizio e il coordinamento del controllo operativo. Nell’ambito del primo tema, sono stati analizzati gli impatti delle valutazioni della sicurezza dinamica e della determinazione dinamica delle portate degli elementi di rete sul controllo in tempo reale. Con particolare riferimento a quest’ultimo aspetto, sono state presentate sperimentazioni interessanti che confermano l’elevata dipendenza delle portate dalle condizioni ambientali esterne. Sistemi di determinazione dinamica delle stesse, basati sulla misurazione dei parametri esterni effettivi, potrebbero consentire agli operatori di rete di superare i metodi di valutazione convenzionali e, generalmente, conservativi ad oggi in gran parte adottati. Sono state inoltre approfondite proposte innovative relative allo sviluppo di metodologie e strumenti a supporto delle decisioni nelle sale operative, nonché le tematiche dell’utilizzo ottimale delle reti a fronte della crescente penetrazione della generazione intermittente, in particolare di quella da fonte eolica. Con riferimento al secondo tema, sono stati presentati i primi ritorni di esperienza dai progetti in corso, in gran parte europei, in tema di coordinamento operativo tra gestori di rete. Il coordinamento riguarda soprattutto la fase di preparazione all’esercizio delle reti. Particolare attenzione è stata altresì dedicata agli aspetti di armonizzazione delle regole operative e dei quadri regolatori. La riunione annuale del Comitato ha visto il passaggio di consegne al nuovo presidente J. Vanzetta (Germania). Relativamente alle attività in corso nel Comitato, sono stati presentati i progressi sui temi della regolazione secondaria di tensione, sulle misure di prevenzione del collasso di tensione e sui requisiti dinamici per gli aerogeneratori. Inoltre, si sono trattati gli aspetti della resilienza dei centri di controllo e delle nuove esigenze in materia di addestramento degli operatori, con particolare attenzione agli aspetti di certificazione. 8 Latina, 24 novembre 2010