Primo (e ultimo ?) giorno di fascio a LHC Nuovo Logo di CMS valido almeno fino alla prossima primavera: Beam Splash: ~2.109 protons on collimator ~150 m upstream of CMS ECAL- pink; HB,HE - light blue; HO,HF - dark blue; Muon DT - green; Tracker Off Other Distributions: Beam Dumped in Coll. Energy in ECAL (EE-, EB, EE+) CMS Week Sep08 4 First Events: Beam going through CMS Halo Muons in CSCs and HB Beam Pickup (ch1) CMS Beam Condition Monitors (ch 3, 4) CMS Centre Meyrin Point 5 Control Room CMS Week Sep08 5 First LHC Beam in DT System DT and first beams: beam splash 17 events induced by beam 1 dump on the collimators observed in run 61642 DT are far from being the best tool to detect first beams events. Max number of hits/TDC = 16 in the DAQ. For splash events all TDC are fired -> >300 hits in inner stations. No segment reconstruction if > 50 hits -> no segments reconstructed in inner stations. 100% of the MB1 chambers illuminated in all 17 events 18/12/2015 7 MB2 Occupancy MB3 Occupancy MB4 Occupancy Phi asymmetry Correlation DT – EB energy Beam halo in DT DT and first beams:beam halo --- All SLs --- r-ϕ SLs --- r-z SLs beam halo muons cross few cells of r-ϕ SLs but many cells in r-z MB1 occupancy: # digis/SL 18/12/2015 15