RRB - Ottobre 2006 •Aggiornamento tempistica (dall’ Atlas week) •Situazione finanziaria complessiva di Atlas •Bilancio 2007 •CtC •M&O-A •M&O-B 9/10/2004 L. Mandelli Installation schedule version 8.1 (draft) Sep '06 Oct '06 Nov '06 Dec '06 Jan '07 Feb '07 Mar '07 Apr '07 May '07 Jun '07 Jul '07 Aug '07 Sep '07 Oct '07 Nov '07 Dec '07 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 Full Magnet test BT test Endcap Toroid A VA JF BW-A (TGC3) Small Wheel A VT LAr A cool down Cold tests Global Commissioning ID barrel connection and testing IDA connection and testing Pixel connection and testing IDC connection and testing Access from sector 13 Big Wheel (TGC3) Pixel JT VA Muon Endcap Toroid Barrel C C VT Small Wheel C Global Commissioning Beam tuning @ 450 GeV + collisions Barrel VJ JF Truck opening Big Wheel BIG WHEEL Big Wheel (MDT) (TGC1) (TGC2) Cold tests opening LAr C cool down ID C ID C services installation Limited access JF Barrel UX15 & LHC closing ECT on half truck JT Access restrictions once toroid in place Side C Side A EO, side A VJ global tests, pump down & bake out services J N opening Barrel Muon A ID A Side A BW-A (TGC2) JF BW-A (MDT) BW-A (tooling +TGC1) Side C EO, side C ECT- C cooldown & test Big Wheels in park position 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 Sep '06 Oct '06 9/10/2004 Nov '06 Dec '06 Jan '07 Feb '07 Mar '07 Apr '07 May '07 Jun '07 L.Mandelli -CSN1 Jul '07 Aug '07 Sep '07 Oct '07 Nov '07 Dec '07 2 Overall financial situation Baseline 468 MCHF Cost-to-Completion (CtC) for the initial detector 68 MCHF Main funding issues today Outstanding contributions to the baseline CP (Russia+ JINR(5);Canada(1.5);USA(1);China(0.3).. 9 MCHF Pledged CTC contributions 62.7 MCHF. Missing 5.3 MCHF (NB: Situation looks rather good due to 5 MCHF more given by CERN; 9/10/2004 L.Mandelli -CSN1 3 Unfortunately as already warned at the April 2006 RRB there are new extra cost for a total of 4.4 MCHF. CB chair ha nominated an audit Committee ( Bethke; Mandelli; Oram) who looked into the overcosts (report available) System Item Item Over Run System Over Run System Total Cost MCHF MCHF MCHF System Over Cost % Magnet 1.76 158.2 1.1% Technical Coordination 2.39 49.6 4.8% LArCC project 0.25 38.7 0.6% ATLAS 4.40 536 0.8% Muon Big Wheels 1.39 TCn installation manpower efforts at Point 1. 1.00 Further delays in installation work beyond August 2007 could require additional resources for manpower to be paid. 9/10/2004 L.Mandelli -CSN1 4 Strategy proposed to the RRB to cover the remaining funding gap, including the new CtC 1) Urge all FA to fulfill their baseline and Common Fund contribution according to the Construction MoU 2) Urge all FA to pledge their full CtC share as determined in October 2002 As CERN has committed 5 MCHF above its calculated share, this would cover the new 4.4 MCHF additional CtC costs 3) As a fallback, extend the annual member fee for one or two years more (2007 and 2008) The present budget request for 2007 includes this as an option, to be decided by RRB in its April meeting, should it become necessary 9/10/2004 L.Mandelli -CSN1 5 Projected Budget Balance (CERN-RRB-2006-071 Table 7) PAYMENTS 95-01 2002 2003 2004 2005 2006 2007 2008 Baseline + CC(A) 231 71 56 52 43 41 13 2 509 -3 -2 -4 -2 -11 of which deferrals C&I (A+B) 0 CC (B) 2009 2010 Total 1 3 4 9 3 1 21 1 1 1 4 3 1 12 TOTAL 231 73 61 57 54 45 11 0 0 0 531 INCOME 95-01 2002 2003 2004 2005 2006 2007 2008 2009 2010 Baseline + CC(A) 252 65 55 54 33 28 9 495 C&I (A+B) 1 9 3 4 4 0 21 CC (B) 2 4 2 1 1 0 11 Total TOTAL 252 68 68 59 38 33 10 0 0 0 526 BUDGET BALANCE 21 -5 7 2 -15 -13 -1 0 0 0 -4 CUMULATIVE 21 15 23 25 9 -3 -4 -4 -4 -4 Magic: the assumed deferral income covers part of the missing funds. If 4 MCHF not found cut again on HLT processors 9/10/2004 L.Mandelli -CSN1 6 Updated Baseline Commitments Evolution (%) Percentage Completed 100 90 80 70 60 ID 50 LAr Tile cal 40 Muons 30 CPs 20 Tot 10 TDAQ 0 1998 1999 2000 2001 2002 2003 2004 2005 2006 Note: TDAQ re-baselined in accordance with CERN-RRB-2004-017 (initial detector) 9/10/2004 L.Mandelli -CSN1 7 2007 Construction Budget CERN-RRB-2006-071_CtC Table 10 Committments Core and CC-A C&I CC-B 12.866 MCHF 0.650 MCHF 0.167 MCHF Italy: CtC: CC (A-B) + C&I : Paid Difference Magnet overcost Total debt pledged C&I and CC-B CC-A m.s. Contribution TOTAL 9/10/2004 6.638 MCHF 4.000 MCHF 2.638 MCHF - 0.350 MCHF 2.288 MCHF 0.000 MCHF 2.288 MCHF 1.476 ME 0.150 MCHF (to be decided in April) 2.438 MCHF L.Mandelli -CSN1 1.573 ME 8 M&O 2007 ( CERN RRB-2006-072) - Base: Memorandum M&O (1/05/2002-31/12/2011) - A : CP : Servizi tecnici al point1, Servizi generali , Magneti, Criogenia, TDAQ. Discusso dallo “ scrutiny group”. Richiesta 2007: 11.722 MCHF (2006: 9.395 MCHF) Power in. La divisione si basa sugli autori con “PHD” : 2007 : 172/1471 = 10.43% (final ?) 2006 : 145/1320 = 11.0% 2005 : 150/1328 = 11.3% 2004 : 144/1301 = 11.0% -B : sottositemi (aree di assemblaggio (SR1;B180;B191); consumi specifici sostituzioni. Discussi negli IB. RRB “ prende visione” Richiesta 2007: 6.98 MCHF (2006: 4.370 MCHF) -C 9/10/2004 Divisione sulla % CORE nei sottosistemi. In corso di revisione nel gruppo OTSMOU Covered by Cern as host lab L.Mandelli -CSN1 9 M&O Summary totali INFN kCHF INFN kEuro Moduli Euro A 10727 (*) 911(**) 587 613 ID 3935 296 192 255 LAr 1065 57 36 43 Tiles 805 63 41 31 Mu 1175 252 163 162 Totali-B 6980 668 432 491 17708 1579 1019 1104 Totali (*) Senza costo del power (**) In kind sottratto : 158.4 kCHF = 102.2 kE 9/10/2004 L.Mandelli -CSN1 10 Evolution of M&O Plans (MCHF) 25 MCHF 20 15 10 5 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 Year M&O Plan October '01 M&O Update October '06 MOF-B T otal 10000 kCHF 8000 ID 6000 LAr 4000 MU Tiles 2000 0 2000 Total 2002 2004 2006 2008 2010 2012 ye a r 9/10/2004 L.Mandelli -CSN1 11 M&O-A ( CERN RRB-2006-070) Power non compreso Cifre in MCHF M&O Category A Total Consumi sul rivelatore e Cryogenia; 2007 2006 10.252 8.367 5.183 3.738 Magnete: operazione e ricambi; controlli; power supply Gas: mantenimento e consumi generali non detector specifici) Sistemi e liquidi di raffreddamento ( non detector specifici) Criogenia esterna: operazione e ricambi (2.535 MCHF) Sistemi di movimentazione, idraulici e sicurezza generale Operazioni di movimentazione (0.450MCHF) Supporto tecnico generale al pit e TDAQ (0.510MCHF) Vuoto e beam pipe Counting room Segretariato, Economato, Pubblicazioni 0.245 0.240 Comunicazioni 0.120 0.070 TDAQ e TC ; Videoconferencing (0.110 MCHF) 9/10/2004 L.Mandelli -CSN1 12 Core Computing 1.475 1.445 Servizi centrali generali ( processing; produzione; user support 13.4 (FTE) x 88kCHF + 1 FTE x 122kCHF + 2 FTE x 71kCHF = 1.443MCHF Contributo INFN: 1.8 FTE x 88kCHF = 158.4 kCHF = 102.2 kE. Il più alto in kind dopo USA (3FTE)- Dettaglio del contributo 06 disponibile Online computing 1.405 0.810 Management system (0.550MCHF); sostituzione processori (0.625MCHF); licenze; infrastrutture Facilities 0.180 0.250 0.075 0.075 1.569 1.739 Bldg. 180, TDAQ pool Laboratory operations Workshop TDAQ Lab equipment General Services Ventilazione (0.364MCHF);Trasporti, Cranes (0.540 MCHF); Survey (0.2MCHF) Outreach (0.2MCHF) 9/10/2004 L.Mandelli -CSN1 13 MOF-B Inner Detector 2007 595 725 925 1690 3935 Pixel SCT TRT IDGen Total 2008 935 871 1035 1131 3972 kCHF 2009 1590 1027 1110 1427 5154 2010 1790 892 1010 1297 4989 Note! Replacement of the Pixel b-layer is included from 2008 % INFN Pixel INFN 32,00% 190 299 509 573 IDGen INFN 6,30% 106 71 90 82 totale kCHF 297 370 599 655 totale kE 192 239 386 422 2006 9/10/2004 134 k€ L.Mandelli -CSN1 14 M&O-B 2007 IDGEN IDGEN (kCHF) 360 SR1 refurbishment (upgrade) 183 consumi SR1 295 cooling (3% costo core,10% rinnovo liquido, extra coolant per cavi (250kchf)) 110 Environmental Gas (N2, CO2) 55 stores 636 manpower (installazione/commissioning 7.5, evaporative Cooling 2, monophase Cooling 1, SR1 1) 50 spares off detec electr. (mainly DCS items) TOTALE 1690KCHF 9/10/2004 L.Mandelli -CSN1 15 M&O-B 2007 Pixel Dettaglio Pixel (kCHF) 30 consumi SR1 125 Spare off detec. electr. (5%CORE crate+rod, 1.5%CORE per PS) 100 subdetectors spares (extra production type0 cables) 40 Stores 300 manpower (installazione compressa, lavoro squadre in parallelo) (+16 FTE pagati dagli Istituti) Totale 595 KCHF 9/10/2004 L.Mandelli -CSN1 16 ID M&O Final Payments in 2005 Pixel SCT TRT IDGen Category B M&O 77 27 3 144 4 18 46 5 12 20 22 Item & Cost Driver (by RRB SG Headings) 251 Mechanics & Gas & Cooling & Cryogenics Gases 73 Standard electronics Electronics pool rentals for test-beams 48 48 100 153 Detector controls DCS replacements for ID for test beams Areas Test-beam activities Main cost driver are: SR1 operation Services (exp. cooling) Communications 33 6 42 40 121 0 Sub-detector spares (Critical spares dealt with separately) 126 71 113 336 646 (Excluding hired manpower for Category B) 0 33 0 353 0 5 387 0 11 Hired manpower at CERN (in kCHF) Institute manpower to be credited (in kCHF) Institute manpower (in FTE) 113 689 6 126 9/10/2004 Store items 105 1,032 Budget was 1065 TOTAL M&O FOR B (kCHF) L.Mandelli -CSN1 17 LAR M&O Piano di spesa (K CHF) : 2006 2007 2008 2009 2010 750 1170 1285 1285 1285 L’incremento nel 2007 rispetto al 2006, risente della richiesta di 350 KCHF per “spares FE”. In realtà gia’ anticipato dal CERN. La prima valutazione dei costi M&O per il 2007 ( maggio 06) e’ stata ridotta del ~ 14 %, per tener conto della nuova schedula di LHC. 9/10/2004 L.Mandelli -CSN1 18 LAr- M&O-B Dettaglio 9/10/2004 Meccanica 5 Acquisti/Lavoraz. meccanic. , saldature….. Impianti Gas 1 Affitto bombole e racks Sist. Criogenici 30 Manten. sist. Crio., gas x tests, slow control Sist. Cooling 30 Coolling PS, FE crates, mantenim., upgrades Elettronica 160 Strumentaz per laboratori, affitto pool, RO, manuten., upgrades Contr. DCS,DSS 30 Componenti per ELMBs, sensori, sniffers PS(LV,HV) 200 Manutenzione, upgrades Magazzino 50 Componenti meccanici, elettrici, etc… Gestione Aree 30 Trasporti,logistica, pulizia aree sperim. Comunicazioni 4 Telefoni portatili, videoconferenze Manpower 280 Personale tecnico,ingegn. esterno/gruppi Elettronica FE 350 Spares, rimborso Totale 1170 kCHF Carry Over 2005 + 35kCHF L.Mandelli -CSN1 Italy : 57 kCHF 19 M&O Tile Cal Year 2004 2005 2006 2007 2008 M&O(KChF) 105 95 371 805 500 Spent 105 95 375* * Projections to the end of the year 2006 budget M&O reduced from 625KChF (2003 estimate) to 371KChF. 2007 budget. From 600 KChF (2005 expectation for 2007), about 800 KChF are needed. (Late commissioning of the fLVPS has produced a spill of expenses in 2007 of about 200KChF ) 9/10/2004 L.Mandelli -CSN1 20 TileCal M&O 2007 Details Maintainance 41% Manpower 33% E-pool rentals 15% Spare parts, store items 10% The italian share is 7.6% Beyond 2007 The fLVPS seems now in good shape, after the problems encountered at the beginning of this year. If this is the case, the foreseen M&O in 2008 and following will come back to the planned value. 9/10/2004 L.Mandelli -CSN1 21 Muons M&O Budget for 2007 Mechanics 150 K Repairs and maintenance Gas consumption and gas system maintenance 355 K Very accurate estimate from the LHC Gas Group Cooling system Consumables and maintenance FE Electronic spares 25 K 100 K Strong reduction (was 550)- Agreement CERN-Israel Standard electronics (HV-LV) 100 K spares Standard electronics 110 K E-pool Communications Hired manpower 5K 330 K Installation and commissioning work (regie + subsistance) Total 9/10/2004 632 K L.Mandelli -CSN1 22 M&O Final Payments in 2005 Item & Cost Driver (by RRB SG Headings) Category B M&O 60 23 114 1 18 0 9/10/2004 Mechanics & Gas & Cooling & Cryogenics Gases Standard electronics Electronics pool rentals for test-beams Budget for 2005: 240 k Income in 2005: in kind 220 k 15 k Detector controls DCS for test beams Expenditures: 381 k Areas Test-beam activities Due to open commitments from 2004 paid in 2005) Communications Store items Sub-detector spares (Critical spares dealt with separately) 216 (Excluding hired manpower for Category B) 150 15 Hired manpower at CERN (in kCHF) Institute manpower to be credited (in kCHF) Institute manpower (in FTE) 381 TOTAL M&O FOR B (kCHF) L.Mandelli -CSN1 23 Spares transparencies Core computing in-kind in 2007 Czech Rep: IN2P3: BMBF: MPI: Israel: 0.4 FTE x 88 kCHF/FTE = 1.0 FTE x 88 kCHF/FTE = 0.9 FTE x 88 kCHF/FTE = 0.3 FTE x 88 kCHF/FTE = 0.2 FTE x 88 kCHF/FTE = INFN: 1.8 FTE x 88 kCHF/FTE = 158 kCHF Poland: Russia: JINR: Taipei: UK: US: 0.10 FTE x 88 kCHF/FTE = 9 kCHF 0.3 FTE x 88 kCHF/FTE = 22 kCHF 0.4 FTE x 88 kCHF/FTE = 35 kCHF 0.1 FTE x 88 kCHF/FTE = 9 kCHF 1.5 FTE x 88 kCHF/FTE = 132 kCHF 3.0 FTE x 88 kCHF/FTE = 264 kCHF TOTAL: 9/10/2004 35 kCHF 88 kCHF 79 kCHF 22 kCHF 18 kCHF 9.9 FTE x 88 kCHF/FTE = 870 kCHF L.Mandelli -CSN1 25 Help desk and user support Guido Negri (CNAF) 0.4FTE Computer and SW documentation and training _ Stefano Antonelli (Bo) 0.4FTE Management of the ATLAS VO on the Grid Alessandro De Salvo (Ro1) Alessandro Barchiesi (Ro1) Filippo Grimaldi (Bo) 0.2FTE 0.3FTE 0.3FTE Software Installation on the Grid Alessandro De Salvo (Ro1) 0.2FTE Total 1.8FTE 9/10/2004 L.Mandelli -CSN1 26 Muon M&O B Old Planning 9/10/2004 L.Mandelli -CSN1 27 Muon M&O B New Planning Budget for Electronics spares reduced by 1 MCHF due to contribution from the CERN-Israeli agreement 9/10/2004 L.Mandelli -CSN1 28 2007 M&O Sharing 9/10/2004 L.Mandelli -CSN1 29