10156 TORINO (ITALY) – 21, Via Cuorgnè
Tel. +39.011.22.22.225 – Fax +39.011.22.22.226 – e-mail: [email protected] – web: www.eurofins-modulouno.com
TEST REPORT
EN 12975-2: 2006: Thermal solar systems and components - Solar collectors –
Part2: Test methods
Impianti solari termici e loro componenti - Collettori solari - Parte 2: Metodi di prova
Report Reference No./ Numero rapporto ..:
M1.10.SOLT.0426/38192
Date of issue / Data di emissione ................:
2010-08-13
Total number of pages / N° tot. di pagine.... :
21
Testing Laboratory / Laboratorio di prova ..:
Eurofins – Modulo Uno S.p.A.
Address / Indirizzo ..................................:
Strada Savonesa, 9 - 15050 Rivalta Scrivia (AL) – Italy
Applicant’s name / Nome del richiedente ...:
Sunerg Solar S.r.l.
Address / Indirizzo ..................................:
Via Donnini, 51 – Cinquemiglia
06012 Città di Castello (PG)
Test specification / Specifiche di prova
Standard / Norma ...................................:
Non-standard test method ..................:
EN 12975-2:2006
N/A
Metodo di prova non standard
Scope of the test / Scopo della prova
To assess the ability to resist the influence of degrading agents and to determine the steady-state and quasidynamic thermal performance of glazed and unglazed liquid heating solar collectors, within the scope of EN
12975-1:2006 “Thermal solar systems and components – Solar collectors - Part 1: General requirements”.
Verifica della capacità di un collettore solare termico per il riscaldamento di liquidi, vetrato o non vetrato, di resistere all’influenza di agenti di
degradazione e caratterizzazione delle prestazioni termiche in condizioni stazionarie e quasi dinamiche, nello scopo della norma EN 129751: 2006: Sistemi e componenti solari termici – Collettori solari – Parte 1: Requisiti generali”.
Test item description ........................: EVACUATED TUBES “Heat pipe” - Glazed liquid heating solar
collector.
Descrizione dell’oggetto in prova
Collettore solare vetrato per il riscaldamento di liquidi a tubi evacuati “Heat pipe”
Trade Mark .........................................:
Marchio
Manufacturer / Costruttore..................:
Sunerg Solar S.r.l.
Address / Indirizzo ..................................:
Via Donnini, 51 – Cinquemiglia – 06012 Città di Castello (PG) – Italy
Model/Type reference / Modello .............:
eXtreme10 – 09/T 001
Date of receipt of the test item............:
2010/10/20
Data di ricevimento dell’oggetto in prova
Testing period / Periodo di prova ................:
2009/11/17 ÷ 2010/07/16
This report shall not be reproduced, except in full, without the written approval of the issuing testing laboratory The test results presented
in this report relate only to the object tested. Eurofins Modulo Uno S.p.A. takes no responsibility for and will not assume liability for
damages resulting from the reader's interpretation of the reproduced material due to its placement and context.
Questo rapporto non può essere riprodotto, se non integralmente, senza l’autorizzazione scritta del laboratorio di prova che lo rilascia. I risultati esposti in
questo rapporto di prova si riferiscono esclusivamente all’oggetto testato. Eurofins Modulo Uno S.p.A. non assume alcuna responsabilità per danni derivanti
dall’interpretazione del lettore del materiale riprodotto al di fuori del suo contesto.
0
P.Ind. Bruno Vaisitti
Ing. Giovanni Bellenda
Revision n°
Lab Energy Responsible
Head of thermal solar testing dept.
Summary / Sommario
GENERAL INFORMATION / INFORMAZIONI GENERALI__________________________________3
Description of test item construction / Descrizione della costruzione dell’oggetto in prova _______4
Test summary statement / Attestazione di prova_____________________________________8
Record of test sequence and summary of main results / Sequenza delle prove ______________8
TAB. 1: Internal pressure for inorganic absorbers / Pressione interna degli assorbitori inorganici ___9
TAB. 2: High temperature resistance / Resistenza alle alte temperature ____________________10
TAB. 3A: Exposure test / Prova di esposizione _______________________________________11
TAB. 3B: Inspection after exposure test/ Ispezione dopo il test di esposizione _______________12
TAB. 4: External thermal shock test / Prova dello shock termico esterno ____________________13
TAB. 5: Internal thermal shock test / Prova dello shock termico interno ____________________14
TAB. 6: Rain penetration test / Prova di penetrazione della pioggia ________________________15
TAB. 7: Freeze resistance test / Prova di resistenza al gelo ______________________________16
TAB. 8: Mechanical load test / Prova di carico meccanico_______________________________17
TAB. 9: Final inspection / Ispezione finale _________________________________________18
TAB. 10: Thermal performance / Prestazioni termiche ________________________________19
Report No. M1.10.SOLT.0426/38192
Page 2 of 21
GENERAL INFORMATION / INFORMAZIONI GENERALI
General remarks / Note generali:
•
This publication may be reproduced in whole or in part for non-commercial purposes as long as Eurofins
Modulo Uno S.p.A. is acknowledged as copyright owner and source of the material and only with the
written permission.
Questa pubblicazione può essere riprodotta per intero o parzialmente per scopi non commerciali a condizione che Eurofins Modulo
Uno S.p.A. sia riconoscibile come proprietaria dei diritti d’autore e fonte del materiale e solo con autorizzazione scritta.
• The test results presented in this report relate only to the object tested.
I risultati esposti in questo rapporto di prova si riferiscono esclusivamente all’oggetto testato.
• This report shall not be reproduced, except in full, without the written approval of the issuing testing
laboratory.
Questo rapporto non può essere riprodotto, se non integralmente, senza l’autorizzazione scritta del laboratorio di prova che lo rilascia.
• "(see annex #)" refers to additional information include in the report.
“(vedi allegato #)” è un riferimento ad informazioni aggiuntive incluse al rapporto
• "(see tab. #)" refers to a table included in the report.
“(vedi tab.#)” è un riferimento ad una tabella annessa al rapporto
• Throughout this report a comma (point) is used as the decimal separator.
In questo rapporto di prova il punto è utilizzato come separatore decimale
Testing location(s):
Eurofins - Modulo Uno S.p.A.
Sito(i) di prova
Strada Comunale Savonesa, 9
15050 Rivalta Scrivia (AL) – Italy
Latitude / Latitudine: 44° 52’ N
Longitude / Longitudine: 08° 48’ E
Tel. +39 011 2222225
Fax +39 011 2222226
e-mail: [email protected]
web: www.product-testing.eurofins.com
Tests performed (name of test
and test clause) ........................ :
EN 12975-2 – All clauses / Tutti gli articoli
Prove eseguite (nome ed articolo del test)
Possible test case verdicts / Esiti di prova possibili:
- test case does not apply to the test object / il requisito non è applicabile all’oggetto in prova ..........:
N/A
- test object does meet the requirement / l’oggetto in prova rispetta il requisito ..............................:
Pass (P)
- test object does not meet the requirement / l’oggetto in prova non rispetta il requisito ...................:
Fail (F)
Abbreviations used in this report / Abbreviazioni usate in questo rapporto:
Manufacturer’s Specification / Specifica fornita dal costruttore ......................................................:
MS
Equipment under Test / Oggetto in prova...................................................................................:
E.u.T.
Mean temperature of heat transfer fluid [°C] ...... ..................................................................:
tm
Ambient or surrounding air temperature [°C] ........ ................................................................:
Ta or ta
-2
Global hemispherical solar irradiance [Wm ] .......................................................................:
2
-1
G*
Reduced temperature difference ( = (tm – Ta)/G*) [m KW ]..................................................:
T*m
Zero-loss collector efficiency (η at T*m = 0), reference to T*m ...............................................:
η0
-2
-1
Heat loss coefficient [Wm K ] ............................................................................................:
-2
-2
Temperature dependence of the heat loss coefficient [Wm K ] ..........................................:
2
Absorber area of collector [m ]..............................................................................................:
2
Aperture area of collector [m ]...............................................................................................:
2
Gross area of collector [m ]...................................................................................................:
-1
-1
Specific heat capacity of heat transfer fluid [Jkg K ] ...........................................................:
Report No. M1.10.SOLT.0426/38192
a1
a2
AA
Aa
AG
cf
Page 3 of 21
Description of test item construction / Descrizione della costruzione dell’oggetto in prova
(Manufactories and part numbers, unless otherwise specified / Costruttori e part number, se non diversamente specificato)
Orderer / Richiedente ............................. :
Sunerg Solar S.r.l. - Via Donnini, 51 – Cinquemiglia
06012 Città di Castello (PG)
Expeller / Rivenditore ............................. :
Sunerg Solar S.r.l. - Via Donnini, 51 – Cinquemiglia
06012 Città di Castello (PG)
Manufacturer / Costruttore ..................... :
Sunerg Solar S.r.l. - Via Donnini, 51 – Cinquemiglia
06012 Città di Castello (PG)
Sampling procedure / Procedura di
campionamento........................................ :
Random sampling from production / Campionamento casuale dalla
produzione
Prototype submitted by client / Prototipo fornito dal cliente
Brand name / Nome commerciale ............ :
eXtreme 10
Serial number / Numero di serie .............. :
Sample “A”: 000002; sample “B”: 000001
Lab. Identification code / Codice
identificativo del laboratorio ......................... :
Sample “A”: 09.893.A; sample “B”: 09.893.B
Picture of marking plate / Immagine dell’etichetta:
Photograph(s) of the E.u.T. / Foto dell’oggetto in prova
Report No. M1.10.SOLT.0426/38192
Page 4 of 21
Ratings / Dati tecnici nominali
Max working temperature [°C] /
Massima temperatura operativa [°C]
............................ :
Max working pressure [bar] / Massima pressione operativa [bar] .................................. :
2
Rated (recommended) flow rate [l/m h] / Portata nominale (consigliata) [l/m h] ............. :
2
160
13
--
Collector / Collettore
Manufacturer / Costruttore ............................:
Sunerg Solar Srl
Model / Modello ...........................................:
eXtreme 10
Glazed flat plate / Vetrato piano
Vacuum tube – Heat pipe single glass tube / Tubi evacuati – Tubo di calore singola copertura vetrata
Vacuum tube – Heat pipe double glass tube / Tubo di calore doppia copertura vetrata
Collector type / Tipo
di collettore ................:
Vacuum tube – U Tube / Tubi evacuati – Tubi a U
Vacuum tube – filled with water / Tubi evacuati riempiti d’acqua
Without covering – unglazed / Scoperto - non vetrato
Other / Altro
Serial product / Prodotto di serie ............................................................................. :
YES / SÌ
NO
Drawing number / N° di disegno ............................................................................ :
--
Serial number / Numero di serie ............................................................................. :
Sample “A”: 000002
Sample “B”: 000001
Date when manufactured / data di costruzione ........................................................
2009
Collector loop flow range [kg/s] / Campo di flusso del circuito collettore [kg/s] ................... :
--
Operating pressure [kPa] / Pressione di esercizio ..................................................... :
--
2
Stagnation temperature at 1000 W/m and 30°C ambient temperature [°C] /
Temperatura di stagnazione a 1000 W/m2 e 30°C di te mperature ambiente [°C] ................................ :
--
Collector mounting / Montaggio del collettore ............................................................ :
on metal frame /
Support metal frame material (if any) Materiale del supporto metallico
N° of collectors /
N° di collettori
(se esistente)
........ :
............................................................................. :
Galvanized alloy steel, plastics /
Acciaio zincato, materiali plastici
1
Gross length [mm] / Lunghezza lorda [mm] ............................................................... :
2220
Gross width [mm] / Larghezza lorda [mm] ................................................................. :
780
Gross height [mm] / Altezza lorda [mm] ................................................................... :
100
2
Gross area [m ] / Superficie lorda [m2]..............:
2
Aperture area [m ] / Superficie di apertura [m2] ...:
2
1.7316
1.010
Absorber area [m ] / Superficie assorbitore [m2]..:
0.9312 (MS)
Weight empty [kg] / Peso a vuoto [kg] .............:
32
Weight without glazing [kg] / Peso senza copertura vetrata [kg]
--
Fluid capacity [l] / Capacità di contenimento di fluido [l]
0.71
Report No. M1.10.SOLT.0426/38192
su supporti metallici
Page 5 of 21
Number of covers / Numero di coperture
1
Cover material / Materiale copertura
Evacuated glass tubes / Tubi
Cover thickness [mm] / Spessore copertura [mm]
--
Cover solar transmittance [%] / Trasmittanza solare della copertura [%] .......................... :
--
coassiali in vetro
Absorber material / Materiale assorbitore :
Copper absorber plate / Piastre
assorbenti in rame
Absorber’s dimensions / Dimensioni dell’assorbitore ................................................... :
48 mm x 1940 mm (length of
absorber’s tube ) x 10 (n° of
tubes)
Absorber’s thickness [mm] / Spessore dell’assorbitore [mm] ........................................
--
Absorber dry weight [kg] / Peso a vuoto dell’assorbitore [kg] ......................................... :
--
Absorber – Fin width [mm] / Larghezza alette dell’assorbitore [mm] ................................ :
48
Absorber – Fin thickness [mm] / Spessore alette dell’assorbitore [mm] ........................... :
0.12
Solar absorptance α / Fattore di assorbimento solare α ............................................... :
95
Hemispherical emittance ε / Emittanza emisferica ε .................................................. :
5
Surface treatment / Trattamento superficiale.............................................................. :
Construction type / Tipo di costruzione
.............................................................. :
Titanium Oxide Nitride Coating /
Nitruro di ossido di titanio
Vacuum tubes – Heat pipe Ultrasonic welding / Tubi sottovuoto
Heat Pipe - Saldatura ad ultrasuoni
Number of risers / Numero di tubi di innalzamento ........................................................ :
10
Riser diameter or dimensions / Dimensioni o diametro dei tubi di innalzamento .................. :
56 mm (external diameter glass
tubes) – 52.4 mm (internal
diameter glass tubes)
Distance between risers / Distanza tra i tubi di innalzamento ......................................... :
75
Back thermal insulation thickness / Spessore dell’isolamento termico posteriore ............... :
--
Side thermal insulation thickness / Spessore dell’isolamento termico laterale................... :
--
Insulation material / Materiale isolante
Mineral wool / Lana minerale
.............................................................. :
Casing material / Materiale di contenimento .............................................................. :
Printed galvanized steel / Acciaio
zincato preverniciato
Sealing material / Materiale di sigillatura
.............................................................. :
--
Other limitations / Altre limitazioni
.............................................................. :
--
Report No. M1.10.SOLT.0426/38192
Page 6 of 21
Sketch of the collector / Schema del collettore
0,12
21,2
10
48
75
Comments on collector design / Commenti sul progetto del collettore ............................ :
Heat transfer medium / Mezzo termovettore ............................................................ :
None / Nessuno
Water-glycol mixture 30% / Miscela
acqua-glicole al 30%
Alternative acceptable heat transfer
Water (in this condition no freeze protection is ensured) / Acqua (in questa
fluids / Fluido termovettore alternative accettabile : condizione non è assicurata la protezione dal gelo)
Test item particulars: / Particolari dell’oggetto in prova
Accessories and detachable parts included in the evaluation / Accessori e parti
separabili incluse nella valutazione.................................................................................. :
--
Options included / Opzioni incluse ......................................................................... :
--
Component list / Distinta dei componenti
Item / Componente
Supplier / Fornitore
Item code / Codice
Notes-material /
componente
Note - materiale
Tubo di vetro / Glass tube
Narva Gmbh
--
--
Heat pipe bar / Barra Heat pipe
Narva Gmbh
--
--
Tubi manifold / Manifold tubes
Narva Gmbh
--
--
Tubi assorbitore / Absorber tubes
Narva Gmbh
--
--
Copertura manifold / Manifold covering
Rogialli Srl
--
--
Isolante Manifold / Manifold Insulation
Thermoform
--
--
Sealants / Sigillanti
--
--
--
Report No. M1.10.SOLT.0426/38192
Page 7 of 21
Test summary statement / Attestazione di prova
The product tested as described on page 1 through 7 complies with the requirements of the
st
standard(s) mentioned on page 1, as detailed below. The measurements were carried out from 1
th
April 2010 to 26 May 2010. No problems or relevant observations occurred during the
measurements.
Il prodotto testato, come descritto nelle pagine da 1 a 9, rispetta i requisiti della(e) norma(e) citata (e) a pagina 1, come
dettagliato nel seguito. Le misure sono state effettuate dal 1 aprile 2010 al 26 maggio 2010. Durante le misure non è stato
evidenziato nessun problema né rilievo significativo.
Record of test sequence and summary of main results / Sequenza delle prove
Clause
Date / Data
Clause
EN 129751
EN 129752
5.3.2
5.2
Test / Prova
Internal pressure for absorbers /
Results
Start /
End /
Inizio
Fine
2009/11/17
2009/11/17
Pressione interna degli assorbitori
5.3.3
5.3.4
5.3
5.4
2010/04/06
2010/04/06
Resistenza alle alte temperature
5.5
Exposure test /
Prova dello shock termico
esterno
Internal thermal shock /
5.3.6
5.3.7
5.3.10
5.6
5.7
5.8
Prova dello shock termico
interno
2010/04/05
2010/05/26
5.9
First
2010/04/21
2010/04/21
Second
2010/05/21
2010/05/21
First
2010/04/22
2010/04/22
Second
2010/05/26
2010/05/26
2010/05/18
2010/05/18
5.10
--
5.11
Rain penetration test /
Prova di penetrazione della pioggia
Freeze resistance test /
Mechanical load test/
Impact resistance test (optional)/
2009/11/18
2009/11/18
6
Thermal performance testing /
(see Tab. 5)
P
P
(see Tab. 7)
2009/11/19
2009/11/19
P
(see Tab. 8)
--
--
2010/07/16
2010/07/16
Prova di resistenza all’impatto (opzionale)
Dismantling final inspection /
P
(see Tab. 6)
Ispezione finale di smontaggio
5.3.9
P
(see Tab. 4)
Prova di carico meccanico
4.1.7
P
(see Tabb. 3A, 3B)
Prova di resistenza al gelo
5.3.8
P
(see Tab. 2)
Prova di esposizione
5.3.5
P
(see Tab. 1)
High temperature resistance /
External thermal shock /
Risultati
Not performed
P
(see Tab. 9)
2010/04/05
2010/05/26
See/vedi tab. 10
Prova delle prestazioni termiche
Report No. M1.10.SOLT.0426/38192
Page 8 of 21
§ 5.2
TAB. 1: Internal pressure for inorganic absorbers / Pressione interna degli assorbitori
inorganici
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
2009/11/17
Test installation / Installazione di prova
Test end [YYYY/MM/DD] /
Data fine prova [AAAA/MM/GG] .................... :
Outdoor
2009/11/17
Indoor
Maximum allowed working pressure
1300
MS [kPa] / Massima pressione di esercizio
ammessa specificata dal costruttore [kPa]
Test ambient temperature [°C] /
Test conditions / Condizioni di prova
Temperatura ambiente di prova [°C]
1950
Test pressure [kPa] / Pressione di prova [kPa]
15
Test duration [min] / Durata di prova [min]
Results / Risultati
Failure
occurred/
Potential failure. / --.
19
Verdict
Absorber leakage
P
Deformation such to establish permanent contact
between absorber and cover
P
Breaking or permanent deformation of collector fixing
points or collector box
P
Vacuum loss
P
Accumulation of humidity in form of condensate on the
inside of the transparent cover of the collector
exceeding 10% of the aperture area
P
Other:
P
Remarks / Osservazioni: no failure observed
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 9 of 21
§ 5.3
TAB. 2: High temperature resistance / Resistenza alle alte temperature
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................
2010/04/06
Test installation / Installazione di
Test end [YYYY/MM/DD] /
Data fine prova [AAAA/MM/GG] ....................:
Outdoor
prova
2010/04/06
Indoor – solar simulator
Additional information if an evacuated tubular collector was tested / Informazioni aggiuntive se la prova è stata effettuata su di un
collettore a tubi evacuati
The temperature of the collector was measured at the location shown below: / La temperatura del collettore è stata
misurata nella posizione illustrata di seguito:
Additional information required if the absorber temperature was measured using a special fluid:
The collector was partially filled with ………….. and the average pressure was …………. Pa, which corresponds to
the average absorber temperature of …....….… °C
Collector tilt angle [°] /
45
Inclinazione del collettore [°]
Average irradiance [W/m2] / Irraggiamento medio [W/m2]
921
Test conditions / Condizioni di
Average surrounding air temperature [°C] / Temperatura ambiente media [°C]
16.3
prova
Average surrounding air speed m/s] / Velocità del vento media [m/s]
0.23
Average absorber temperature [°C] / Temperatura media dell’assorbitore [°C]
158
63
Test duration [min] / Durata di prova [min]
Calculated collector stagnation temperature [°C] /
Temperatura di stagnazione del collettore calcolata [°C]
Failure
occurred/
Potential failure. / --.
Results / Risultati
184
Verdict
Absorber leakage
P
Deformation such to establish permanent contact between
absorber and cover
P
Breaking or permanent deformation of collector fixing points or
collector box
P
Vacuum loss
P
Accumulation of humidity in form of condensate on the inside of
the transparent cover of the collector exceeding 10% of the
aperture area
P
Other:
P
Remarks / Osservazioni
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 10 of 21
§ 5.4
TAB. 3A: Exposure test / Prova di esposizione
Test start [YYYY/MM/DD] / Data inizio prova
[AAAA/MM/GG] ................................... :
2010/04/05
Test end [YYYY/MM/DD] / Data fine
2010/05/26
prova [AAAA/MM/GG] ............................... :
Collector tilt / Inclinazione del collettore [°]:
45
Collector azimuth / angolo azimutale del collettore rispetto al sud [°]:
0
Day
Date
Irradiation H
[MJ/m2]
Air temperature
ta [°C]
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2010/04/05
2010/04/06
2010/04/07
2010/04/08
2010/04/09
2010/04/10
2010/04/11
2010/04/12
2010/04/13
2010/04/14
2010/04/15
2010/04/16
2010/04/17
2010/04/18
2010/04/19
2010/04/20
2010/04/21
2010/04/22
2010/04/23
2010/04/24
2010/04/25
2010/04/26
2010/04/27
2010/04/28
2010/04/29
2010/04/30
16.3
16.5
16.4
16.1
15.2
17.1
3.4
2.2
4.6
15.7
4.6
8.3
3.7
17.2
17.3
16.4
18.1
14.7
3.1
2.6
15.1
2.1
1.8
14.5
16.8
3.4
17
18
17
16
22
24
13
12
14
17
16
18
16
14
22
23
23
21
15
20
24
24
18
23
23
21
Rain
Day
Date
Irradiation H
[MJ/m2]
Air temperature ta
[°C]
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
2010/05/01
2010/05/02
2010/05/03
2010/05/04
2010/05/05
2010/05/06
2010/05/07
2010/05/08
2010/05/09
2010/05/10
2010/05/11
2010/05/12
2010/05/13
2010/05/14
2010/05/15
2010/05/16
2010/05/17
2010/05/18
2010/05/19
2010/05/20
2010/05/21
2010/05/22
2010/05/23
2010/05/24
2010/05/25
2010/05/26
2.7
1.8
3.1
17.4
1.2
16.2
4.5
14.8
3.8
6.3
5.4
7.2
8.4
7.7
15.4
16.1
17.4
18.2
18.4
18.3
18.2
18.7
19.1
19.6
19.3
18.4
18
15
18
12
13
15
12
17
17
18
18
18
18
16
20
22
22
22
20
24
25
26
26
27
27
24
2
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2010/04/05
2010/04/06
2010/04/07
2010/04/08
2010/04/09
2010/04/10
2010/04/14
2010/04/18
2010/04/19
2010/04/20
2010/04/21
2010/04/22
2010/04/28
2010/04/29
2010/05/04
Air temperature
ta [°C]
17
18
17
16
22
24
17
14
22
23
23
21
23
23
12
Irradiance G
[W/m2]
904
901
891
926
919
900
909
872
901
901
903
906
903
909
895
2
Time periods
[min]
73
60
70
51
51
64
66
71
86
46
81
71
76
76
97
Period
Date
16
17
18
19
20
21
22
23
24
25
26
27
28
29
2010/05/06
2010/05/08
2010/05/15
2010/05/16
2010/05/17
2010/05/18
2010/05/19
2010/05/20
2010/05/21
2010/05/22
2010/05/23
2010/05/24
2010/05/25
2010/05/26
Irradiance G
[W/m2]
909
920
896
896
910
899
885
978
878
909
873
906
880
908
Air temperature ta
[°C]
15
17
20
22
22
22
20
24
25
26
26
27
27
24
Total hours with G > 850 W/m , air temperature > 10 ° C / Ore totali con G > 850 W/m2; temperatura ambiente > 10 °C :
Report No. M1.10.SOLT.0426/38192
30
Total days in which H > 14 MJ/m / Giorni totali con H > 14 MJ/m2:
Period
Rain
Time periods
[min]
54
81
37
74
63
45
63
73
89
88
59
74
80
76
33
Page 11 of 21
§ 5.4
TAB. 3B: Inspection after exposure test/ Ispezione dopo il test di esposizione
Test start [YYYY/MM/DD]
2010/05/26
Data inizio prova [AAAA/MM/GG]
Test end [YYYY/MM/DD]
2010/05/26
Data fine prova [AAAA/MM/GG]
Collector fluid loop / Circuito idraulico del collettore
Potential problems
Evaluation
Verdict
Swelling of pipes and components / Rigonfiamenti di tubature e componenti
N/A
N/A
Fluid leakages / Perdite di liquidi e sgocciolamenti
N/A
N/A
Cracking / Rotture
N/A
N/A
Warping / Deformazioni
N/A
N/A
Corrosion / Corrosione
N/A
N/A
Evaluation*
Verdict
0
P
0
P
0
P
0
P
Deformation/corrosion/leakage/loss of bonding of the absorber tubes and
headers / Deformazioni/corrosione/perdite/distacchi dei tubi dell’assorbitore e dei raccordi
0
P
Deformation/corrosion of the absorber mountings / Deformazioni/segni di
0
P
0
P
Strength / Solidità
0
P
Safety / Sicurezza
0
P
Loss of function / Perdita di funzionalità
N/A
N/A
Safety / Sicurezza
N/A
N/A
Collector / Collettore
Potential problems/failures
Cracking/warping/corrosion/rain penetration of the collector box/fasteners
Rotture/deformazioni/corrosione/penetrazione di pioggia nella scatola del collettore e/o negli
aggraffaggi
Cracking/adhesion/elasticity of the seals/gaskets /
Rottura/incollamento/elasticizzazione dei sigillanti e/o delle guarnizioni
Cracking/crazing/buckling/delamination/ warping/outgassing of the
cover/reflector / Rotture/formazione di crepe/crolli/delaminazioni/deformazioni/perdite di vuoto
della copertura e/o del riflettore
Cracking/crazing/blistering of the absorber coating / Rotture/crepe/formazioni di
bolle sul rivestimento dell’assorbitore
corrosione dei dispositivi di montaggio e fissaggio dell’assorbitore
Water retention/outgassing/degradation of the thermal insulation / Ritenzione
d’acqua/perdita di vuoto/ degradazione dell’isolante termico
Mounting structure / Strutture di montaggio
Safety equipment / Equipaggiamento di sicurezza
*Evaluation scale / Scala di valutazione:
0 - No problem / Nessun problema
1 - Requirement apart from testing not fulfilled (minor failure) / Problema di entità minore
2 - Requirements for testing not fulfilled (major failure) / Problemi non trascurabili
N/A - Inspection to establish the condition was not possible / Ispezione non possibile
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 12 of 21
§ 5.5
TAB. 4: External thermal shock test / Prova dello shock termico esterno
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
Test installation / Installazione di prova
Test end [YYYY/MM/DD] /
2010/04/21
Data fine prova [AAAA/MM/GG] .................... :
Outdoor
2010/05/21
Indoor
Test combined with exposure test / Test combinato con il test di esposizione
Test combined with high temperature resistance test / Test combinato con il test di resistenza alle alte
temperature
Additional information if an evacuated tubular collector was tested / Informazioni aggiuntive se la prova
è stata effettuata su di un collettore a tubi evacuati
The temperature of the collector was measured at the location shown below: / La
N/A
temperatura del collettore è stata misurata nella posizione illustrata di seguito:
Additional information required if the absorber temperature was measured using a special
fluid:
The collector was partially filled with ………….. and the average pressure was ………….
Pa, which corresponds to the average absorber temperature of …....….… °C
Shock n°
1
2
2010/04/21
2010/05/21
45
45
927
976
Minimum irradiance W/m ] / Irraggiamento minimo [W/m ]
902
954
Average air temperature [°C] /
Temperatura ambiente media [°C]
23.2
25.1
Minimum air temperature [°C] /
Temperatura amb. minima [°C]
22.9
24.6
Preconditioning period [min] / Durata di precondizionamento [min]
61
62
Absorber temp. before spraying [°C] /
153
157
Flow rate of water spray [kg/(s·m )] / Portata del getto d’acqua
0.037
0.038
Temperature of water spray [°C] /
16.5
17.2
15
15
Test date / data di prova
Collector tilt angle [°] /
Angolo di inclinazione del collettore [°]
2
Average irradiance W/m ] / Irraggiamento medio [W/m ]
2
2
Test conditions /
Condizioni di prova
N/A
2
Temp. dell’assorbitore
prima del getto [°C]
2
[kg/(s•m2)]
Temperatura del getto
d’acqua [°C]
Duration of water spray [min] / Durata del getto d’acqua [min]
Potential failure. / Danno potenziale
Failure occurred/ danneggiamenti occorsi
Absorber leakage
Deformation such to establish permanent contact between absorber
and cover
Breaking or permanent deformation of collector fixing points or
Results / Risultati collector box
Vacuum loss
Accumulation of humidity in form of condensate on the inside of the
transparent cover of the collector exceeding 10% of the aperture area
Other:
Remarks / Osservazioni :No failure detected / Nessun danneggiamento rilevato
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 13 of 21
§ 5.6
TAB. 5: Internal thermal shock test / Prova dello shock termico interno
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
Test installation / Installazione di prova
2010/04/22
Test end [YYYY/MM/DD] /
Data fine prova [AAAA/MM/GG] .................... :
Outdoor
2010/05/26
Indoor
Test combined with exposure test / Test combinato con il test di esposizione
Test combined with high temperature resistance test / Test combinato con il test di resistenza alle alte
temperature
Additional information if an evacuated tubular collector was tested / Informazioni aggiuntive se la prova
è stata effettuata su di un collettore a tubi evacuati
The temperature of the collector was measured at the location shown below: / La
N/A
temperatura del collettore è stata misurata nella posizione illustrata di seguito:
Additional information required if the absorber temperature was measured using a special
fluid:
The collector was partially filled with ………….. and the average pressure was ………….
Pa, which corresponds to the average absorber temperature of …....….… °C
Shock n°
1
2
2010/04/22
2010/05/26
45
45
946
949
Minimum irradiance W/m ] / Irraggiamento minimo [W/m ]
911
934
Average air temperature [°C] /
Temperatura ambiente media [°C]
21.2
24.8
Minimum air temperature [°C] /
Temperatura amb. minima [°C]
20.8
24.4
Preconditioning period [min] / Durata di precondizionamento [min]
60
61
Absorber temp. before flowing [°C] /
152
156
Flow rate of heat transfer fluid [kg/(s·m )] / Portata di fluido
0.019
0.018
Temperature of heat transfer fluid [°C] /
16.8
18.1
6
7
Test date / data di prova
Collector tilt angle [°] /
Angolo di inclinazione del collettore [°]
2
Average irradiance W/m ] / Irraggiamento medio [W/m2]
2
Test conditions /
Condizioni di prova
N/A
2
Temp. dell’assorbitore
prima del flusso [°C]
2
termovettore [kg/(s•m2)]
Temperatura del fluido
termovettore [°C]
Duration of flow [min] / Durata del flusso [min]
Potential failure. / Danno potenziale
Failure occurred/ danneggiamenti occorsi
Absorber leakage
Deformation such to establish permanent contact between absorber
and cover
Breaking or permanent deformation of collector fixing points or
Results / Risultati collector box
Vacuum loss
Accumulation of humidity in form of condensate on the inside of the
transparent cover of the collector exceeding 10% of the aperture area
Other:
Remarks / Osservazioni :No failure detected / Nessun danneggiamento rilevato
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 14 of 21
§ 5.7
TAB. 6: Rain penetration test / Prova di penetrazione della pioggia
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
2010/05/18
Test installation / Installazione di prova
Test end [YYYY/MM/DD] /
Data fine prova [AAAA/MM/GG] ....................:
Outdoor
Collector mounted on / Collettore
Indoor
Open frame/ Struttura aperta
montato su:
Method used to keep the absorber
warm / Metodo usato per mantenere caldo il
collettore:
2010/05/18
Simulated roof / Tetto simulato
Hot water circulation / Circolazione di acqua calda
Exposure of collector to solar radiation / Esposizione del
collettore alla radiazione solare
Collector tilt angle [°] /
45
Angolo di inclinazione del collettore [°]
2
Water flow rate [kg/(s·m )] / Portata di fluido termovettore [kg/(s•m2)]
0.054
Temperature of heat transfer fluid [°C] /
53.7
Test conditions /
Condizioni di prova
Temperatura del fluido termovettore [°C]
Duration of water spray [h] / Durata del getto d’acqua [h]
4
Potential failure. / Danno potenziale
Failure occurred/ danneggiamenti occorsi
Water penetration
Absorber leakage
Deformation such to establish permanent contact between absorber
and cover
Results / Risultati Breaking or permanent deformation of collector fixing points or
collector box
Vacuum loss
Accumulation of humidity in form of condensate on the inside of the
transparent cover of the collector exceeding 10% of the aperture area
Other:
Remarks / Osservazioni :
No rain penetration / nessuna penetrazione di pioggia
No failure detected / Nessun danneggiamento rilevato
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 15 of 21
§ 5.8
TAB. 7: Freeze resistance test / Prova di resistenza al gelo
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
Collector type / Tipo di collettore
2009/11/18
Test end [YYYY/MM/DD] /
2009/11/18
:
Data fine prova [AAAA/MM/GG]
Freeze-resistant when filled with water
Drain-down
Antifreeze fluid (MS) / Liquido antigelo
specificato dal costruttore
Water- Propylene glycol mixture / Miscela acqua-glicole propilenico
Tilt angle of the collector [°] /
Test conditions / Condizioni di prova
Angolo di inclinazione del collettore [°]
Rate of chamber cooling [K/h] / Velocità di raffreddamento [K/h]
Rate of chamber heating [K/h] / Velocità di riscaldamento [K/h]
N° of freezethaw cycle
Freeze conditions / Condizioni di congelamento
Test temperature [°C]
Duration [min]
Thaw conditions
/ Condizioni di scongelamento
Test temperature [°C]
Duration [min]
1
2
3
Results / Risultati
Potential failure. / --.
Failure
occurred/
Verdict
Absorber leakage
Deformation such to establish permanent contact
between absorber and cover
Breaking or permanent deformation of collector fixing
points or collector box
Vacuum loss
Accumulation of humidity in form of condensate on the
inside of the transparent cover of the collector
exceeding 10% of the aperture area
Other:
Remarks / Osservazioni:
The manufacturer recommends the use of a water-propylene glycol mixture in the solar loop. /
Il costruttore raccomanda l’utilizzo di una miscela acqua-glicole propilenico nel circuito solare.
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS (see Remarks)
Page 16 of 21
§ 5.9
TAB. 8: Mechanical load test / Prova di carico meccanico
POSITIVE PRESSURE TEST OF THE COLLECTOR COVER
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
2009/11/19
Test end [YYYY/MM/DD] /
:
Data fine prova [AAAA/MM/GG]
2009/11/19
Loading with gravel or similar material
Method used to apply positive
Loading with water
pressure to the cover / Metodo usato per
Suction cups
applicare il carico positivo alla copertura
Pressurisation of collector cover
Test conditions / Condizioni di prova
1000
Maximum pressure load [Pa] / Pressione di carico massima [Pa]
Remarks / Note
Negative pressure test of fixings between the cover and collector box
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
2009/11/19
Test end [YYYY/MM/DD] /
:
Data fine prova [AAAA/MM/GG]
2009/11/19
Method used to apply negative
Suction cups
pressure to the cover / Metodo usato per
applicare il carico negativo alla copertura
Pressurisation of collector box
N/A
Test conditions / Condizioni di prova
Maximum pressure load [Pa] / Pressione di carico massima [Pa]
Remarks / Note
This test is not applicable to the E.u.T. / Questa prova non è applicabile al collettore
Negative pressure test of collector mountings
Test start [YYYY/MM/DD] /
Data inizio prova [AAAA/MM/GG] ................ :
2009/11/19
Test end [YYYY/MM/DD] /
:
Data fine prova [AAAA/MM/GG]
2009/11/19
Method used to apply negative
Suction cups
pressure to the cover / Metodo usato per
applicare il carico negativo alla copertura
Air bags
N/A
Test conditions / Condizioni di prova
Maximum pressure load [Pa] / Pressione di carico massima [Pa]
Remarks / Note
This test is not applicable to the E.u.T. / Questa prova non è applicabile al collettore
Results / Risultati
Failure
occurred/
Potential failure. / --.
Verdict
Absorber leakage
P
Deformation such to establish permanent contact
between absorber and cover
P
Breaking or permanent deformation of collector fixing
points or collector box
P
Vacuum loss
P
Other:
P
Remarks / Osservazioni:
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 17 of 21
§ 5.11
TAB. 9: Final inspection / Ispezione finale
Test start [YYYY/MM/DD]
2010/07/16
Data inizio prova [AAAA/MM/GG]
Test end [YYYY/MM/DD]
2010/07/16
Data fine prova [AAAA/MM/GG]
Collector loop pipes / Tubazioni del circuito collettore
Potential problems
Evaluation
Verdict
Swelling of pipes and components / Rigonfiamenti di tubature e componenti
N/A
N/A
Fluid leakages / Perdite di liquidi e sgocciolamenti
N/A
N/A
Cracking / Rotture
N/A
N/A
Warping / Deformazioni
N/A
N/A
Corrosion / Corrosione
N/A
N/A
Water retention/outgassing/degradation of the insulation / Ritenzione d’acqua /
N/A
N/A
Evaluation*
Verdict
0
P
0
P
0
P
0
P
Deformation/corrosion/leakage/loss of bonding of the absorber tubes and
headers / Deformazioni/corrosion/perdite/distacchi dei tubi dell’assorbitore e dei raccordi
0
P
Deformation/corrosion of the absorber mountings / Deformazioni/segni di corrosion
0
P
0
P
Strength / Solidità
0
P
Safety / Sicurezza
0
P
Loss of function / Perdita di funzionalità
N/A
N/A
Safety / Sicurezza
N/A
N/A
Perdita del vuoto / degradazione dell’isolamento
Collector / Collettore
Potential problems/failures
Cracking/warping/corrosion/rain penetration of the collector box/fasteners
Rotture/deformazioni/corrosione/penetrazione di pioggia nella scatola del collettore e/o negli
aggraffaggi
Cracking/adhesion/elasticity of the seals/gaskets /
Rottura/incollamento/elasticizzazione dei sigillanti e/o delle guarnizioni
Cracking/crazing/buckling/delamination/ warping/outgassing of the
cover/reflector / Rotture/formazione di crepe/crolli/delaminazioni/deformazioni/perdite di vuoto
della copertura e/o del riflettore
Cracking/crazing/blistering of the absorber coating / Rotture/crepe/formazioni di
bolle sul rivestimento dell’assorbitore
dei dispositive di montaggio e fissaggio dell’assorbitore
Water retention/outgassing/degradation of the thermal insulation / Ritenzione
d’acqua/perdita di vuoto/ degradazione dell’isolante termico
Mounting structure / Strutture di montaggio
Safety equipment / Equipaggiamento di sicurezza
*Evaluation scale / Scala di valutazione:
0 - No problem / Nessun problema
1 - Requirement apart from testing not fulfilled (minor failure) / Problema di entità minore
2 - Requirements for testing not fulfilled (major failure) / Problemi non trascurabili
N/A - Inspection to establish the condition was not possible / Ispezione non possibile
Verdict / Esito
Report No. M1.10.SOLT.0426/38192
PASS
Page 18 of 21
§6
TAB. 10: Thermal performance / Prestazioni termiche
Test start [YYYY/MM/DD]
2010/04/05
Data inizio prova [AAAA/MM/GG]
Test method / Metodo di prova
Test end [YYYY/MM/DD]
2010/05/26
Data fine prova [AAAA/MM/GG]
6.1 Outdoor – Steady state
6.1 Indoor – Steady state method
44° 52’ N
Longitude / Longitudine:
Latitude / Latitudine:
Collector tilt / Inclinazione del collettore [°]
6.3 Outdoor – quasi-dynamic
08° 48’ E
Collector azimuth
/Orientamento azimutale del
45
South / Sud
collettore
Orientation of absorber tubes during testing / Orientamento dei tubi del collettore durante la prova
Vertical/ verticale
Test results / Risultati di prova
Peak power [W] /
670
Potenza di picco [W]
Irradiance / Irraggiamento
400 W/m2
700 W/m2
Tm - Ta [K]
1000 W/m2
0
268,0
468,9
669,9
10
251,0
452,9
654,6
20
228,5
434,3
637,1
30
200,4
411,8
617,3
40
166,7
386,1
595,3
50
127,5
358,1
571,1
60
82,8
325,9
544,7
70
32,5
291,8
516,1
800,0
700,0
600,0
500,0
400,0
300,0
200,0
100,0
0,0
0
10
Report No. M1.10.SOLT.0426/38192
20
30
40
50
60
70
Page 19 of 21
The istantaneous efficiency is defined as / L’efficienza istantanea è definita come:
ηA =
Q
⋅
AA ⋅ G
ηa =
Flow rate used for performance testing (average): 0,019 kg/s/m
Q
⋅
Aa ⋅ G
2
2
Flusso utilizzato per il test (valore medio): 0,019 kg/s/m
Second order fit to data / Regressione lineare del secondo ordine
2
t −t 
- a1A  t m − t a  - a2AG  m a  ;
 G
 G 


ηA = η 0 A
ηa = η 0 a
t −t 
- a1a  t m − t a  - a2aG  m a 
 G
 G 


0,8
2
2
y = -11,925x - 1,5252x + 0,7194
0,7
0,6
0,5
Serie1
0,4
Poli. (Serie1)
0,3
0,2
0,1
0
0
0,02
0,04
0,06
Abs orber
Aperture
0,08
0,1
Gros s
0,8
0,7
0,6
0,5
0,4
0,3
0,2
0,1
0
0
0,02
0,04
0,06
0,08
0,1
Fit to absorber area /
Std dev. /
Fit to aperture area /
Std dev. /
Fit all’area dell’assorbitore
Deviazione standard
Fit all’area di apertura
Deviazione standard
η0A
a1A
a2A
0.72
1.525
0.0149
Report No. M1.10.SOLT.0426/38192
0.04
0.08
0.006
η0a
a1a
a2a
0.66
1.406
0.0137
0.04
0.08
0.006
Page 20 of 21
Time constant / Costante di tempo
The time constant τc of the collector has been measured as the time elapsed between the removal of a cover used to
achieve a steady state condition of the water temperature at the outlet and the point where the collector outlet
temperature rises to 63,2 % of the total increase up to the next steady state condition.
La costante di tempo τc del collettore è stata misurata come il tempo trascorso tra la rimozione del rivestimento usato per raggiungere la condizione
stazionaria della temperatura dell’acqua all’uscita e al punto dove la temperatura di uscita del collettore sale a 63,2% dell’incremento totale alla
successiva condizione stazionaria.
τc = 52 s
Effective thermal capacity / Capacità termica effettiva
The effective thermal capacity is calculated from or from the measurement records of tin, ∆Τ, ta , G and by the
following relation for outdoor testing :
La capacità termica effettiva è calcolata dalle registrazioni misurate di tin, ∆Τ, ta , G utilizzando la seguente relazione per test all’aperto:
C=
A G η 0G
∫
t2
t1
.
G dt − m c f
∫
t2
t1
1 t2
 t2

∆ T dt − A G U G  ∫ (t in − t a ) dt + ∫ ∆ T dt 
2 t1
 t1

t m2 − t m1
C = 7.4 kJ/k
Incidence angle modifier (IAM) / Coefficiente di angolo di incidenza
Angle
00
300
450
50°
60 0
65°
80°
Kθ – Longitudinal
(IAM-L)
1
1
0.98
0.95
0.86
0.80
0.5
Kθ – Transversal
(IAM-T)
1
1
0.98
0.95
0.86
0.80
0.5
----------------- End of Test Report No. M1.10.SOLT.0426/38192 ------------------
Report No. M1.10.SOLT.0426/38192
Page 21 of 21
Scarica

TEST REPORT