10156 TORINO (ITALY) – 21, Via Cuorgnè Tel. +39.011.22.22.225 – Fax +39.011.22.22.226 – e-mail: [email protected] – web: www.eurofins-modulouno.com TEST REPORT EN 12975-2: 2006: Thermal solar systems and components - Solar collectors – Part2: Test methods Impianti solari termici e loro componenti - Collettori solari - Parte 2: Metodi di prova Report Reference No./ Numero rapporto ..: M1.10.SOLT.0426/38192 Date of issue / Data di emissione ................: 2010-08-13 Total number of pages / N° tot. di pagine.... : 21 Testing Laboratory / Laboratorio di prova ..: Eurofins – Modulo Uno S.p.A. Address / Indirizzo ..................................: Strada Savonesa, 9 - 15050 Rivalta Scrivia (AL) – Italy Applicant’s name / Nome del richiedente ...: Sunerg Solar S.r.l. Address / Indirizzo ..................................: Via Donnini, 51 – Cinquemiglia 06012 Città di Castello (PG) Test specification / Specifiche di prova Standard / Norma ...................................: Non-standard test method ..................: EN 12975-2:2006 N/A Metodo di prova non standard Scope of the test / Scopo della prova To assess the ability to resist the influence of degrading agents and to determine the steady-state and quasidynamic thermal performance of glazed and unglazed liquid heating solar collectors, within the scope of EN 12975-1:2006 “Thermal solar systems and components – Solar collectors - Part 1: General requirements”. Verifica della capacità di un collettore solare termico per il riscaldamento di liquidi, vetrato o non vetrato, di resistere all’influenza di agenti di degradazione e caratterizzazione delle prestazioni termiche in condizioni stazionarie e quasi dinamiche, nello scopo della norma EN 129751: 2006: Sistemi e componenti solari termici – Collettori solari – Parte 1: Requisiti generali”. Test item description ........................: EVACUATED TUBES “Heat pipe” - Glazed liquid heating solar collector. Descrizione dell’oggetto in prova Collettore solare vetrato per il riscaldamento di liquidi a tubi evacuati “Heat pipe” Trade Mark .........................................: Marchio Manufacturer / Costruttore..................: Sunerg Solar S.r.l. Address / Indirizzo ..................................: Via Donnini, 51 – Cinquemiglia – 06012 Città di Castello (PG) – Italy Model/Type reference / Modello .............: eXtreme10 – 09/T 001 Date of receipt of the test item............: 2010/10/20 Data di ricevimento dell’oggetto in prova Testing period / Periodo di prova ................: 2009/11/17 ÷ 2010/07/16 This report shall not be reproduced, except in full, without the written approval of the issuing testing laboratory The test results presented in this report relate only to the object tested. Eurofins Modulo Uno S.p.A. takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. Questo rapporto non può essere riprodotto, se non integralmente, senza l’autorizzazione scritta del laboratorio di prova che lo rilascia. I risultati esposti in questo rapporto di prova si riferiscono esclusivamente all’oggetto testato. Eurofins Modulo Uno S.p.A. non assume alcuna responsabilità per danni derivanti dall’interpretazione del lettore del materiale riprodotto al di fuori del suo contesto. 0 P.Ind. Bruno Vaisitti Ing. Giovanni Bellenda Revision n° Lab Energy Responsible Head of thermal solar testing dept. Summary / Sommario GENERAL INFORMATION / INFORMAZIONI GENERALI__________________________________3 Description of test item construction / Descrizione della costruzione dell’oggetto in prova _______4 Test summary statement / Attestazione di prova_____________________________________8 Record of test sequence and summary of main results / Sequenza delle prove ______________8 TAB. 1: Internal pressure for inorganic absorbers / Pressione interna degli assorbitori inorganici ___9 TAB. 2: High temperature resistance / Resistenza alle alte temperature ____________________10 TAB. 3A: Exposure test / Prova di esposizione _______________________________________11 TAB. 3B: Inspection after exposure test/ Ispezione dopo il test di esposizione _______________12 TAB. 4: External thermal shock test / Prova dello shock termico esterno ____________________13 TAB. 5: Internal thermal shock test / Prova dello shock termico interno ____________________14 TAB. 6: Rain penetration test / Prova di penetrazione della pioggia ________________________15 TAB. 7: Freeze resistance test / Prova di resistenza al gelo ______________________________16 TAB. 8: Mechanical load test / Prova di carico meccanico_______________________________17 TAB. 9: Final inspection / Ispezione finale _________________________________________18 TAB. 10: Thermal performance / Prestazioni termiche ________________________________19 Report No. M1.10.SOLT.0426/38192 Page 2 of 21 GENERAL INFORMATION / INFORMAZIONI GENERALI General remarks / Note generali: • This publication may be reproduced in whole or in part for non-commercial purposes as long as Eurofins Modulo Uno S.p.A. is acknowledged as copyright owner and source of the material and only with the written permission. Questa pubblicazione può essere riprodotta per intero o parzialmente per scopi non commerciali a condizione che Eurofins Modulo Uno S.p.A. sia riconoscibile come proprietaria dei diritti d’autore e fonte del materiale e solo con autorizzazione scritta. • The test results presented in this report relate only to the object tested. I risultati esposti in questo rapporto di prova si riferiscono esclusivamente all’oggetto testato. • This report shall not be reproduced, except in full, without the written approval of the issuing testing laboratory. Questo rapporto non può essere riprodotto, se non integralmente, senza l’autorizzazione scritta del laboratorio di prova che lo rilascia. • "(see annex #)" refers to additional information include in the report. “(vedi allegato #)” è un riferimento ad informazioni aggiuntive incluse al rapporto • "(see tab. #)" refers to a table included in the report. “(vedi tab.#)” è un riferimento ad una tabella annessa al rapporto • Throughout this report a comma (point) is used as the decimal separator. In questo rapporto di prova il punto è utilizzato come separatore decimale Testing location(s): Eurofins - Modulo Uno S.p.A. Sito(i) di prova Strada Comunale Savonesa, 9 15050 Rivalta Scrivia (AL) – Italy Latitude / Latitudine: 44° 52’ N Longitude / Longitudine: 08° 48’ E Tel. +39 011 2222225 Fax +39 011 2222226 e-mail: [email protected] web: www.product-testing.eurofins.com Tests performed (name of test and test clause) ........................ : EN 12975-2 – All clauses / Tutti gli articoli Prove eseguite (nome ed articolo del test) Possible test case verdicts / Esiti di prova possibili: - test case does not apply to the test object / il requisito non è applicabile all’oggetto in prova ..........: N/A - test object does meet the requirement / l’oggetto in prova rispetta il requisito ..............................: Pass (P) - test object does not meet the requirement / l’oggetto in prova non rispetta il requisito ...................: Fail (F) Abbreviations used in this report / Abbreviazioni usate in questo rapporto: Manufacturer’s Specification / Specifica fornita dal costruttore ......................................................: MS Equipment under Test / Oggetto in prova...................................................................................: E.u.T. Mean temperature of heat transfer fluid [°C] ...... ..................................................................: tm Ambient or surrounding air temperature [°C] ........ ................................................................: Ta or ta -2 Global hemispherical solar irradiance [Wm ] .......................................................................: 2 -1 G* Reduced temperature difference ( = (tm – Ta)/G*) [m KW ]..................................................: T*m Zero-loss collector efficiency (η at T*m = 0), reference to T*m ...............................................: η0 -2 -1 Heat loss coefficient [Wm K ] ............................................................................................: -2 -2 Temperature dependence of the heat loss coefficient [Wm K ] ..........................................: 2 Absorber area of collector [m ]..............................................................................................: 2 Aperture area of collector [m ]...............................................................................................: 2 Gross area of collector [m ]...................................................................................................: -1 -1 Specific heat capacity of heat transfer fluid [Jkg K ] ...........................................................: Report No. M1.10.SOLT.0426/38192 a1 a2 AA Aa AG cf Page 3 of 21 Description of test item construction / Descrizione della costruzione dell’oggetto in prova (Manufactories and part numbers, unless otherwise specified / Costruttori e part number, se non diversamente specificato) Orderer / Richiedente ............................. : Sunerg Solar S.r.l. - Via Donnini, 51 – Cinquemiglia 06012 Città di Castello (PG) Expeller / Rivenditore ............................. : Sunerg Solar S.r.l. - Via Donnini, 51 – Cinquemiglia 06012 Città di Castello (PG) Manufacturer / Costruttore ..................... : Sunerg Solar S.r.l. - Via Donnini, 51 – Cinquemiglia 06012 Città di Castello (PG) Sampling procedure / Procedura di campionamento........................................ : Random sampling from production / Campionamento casuale dalla produzione Prototype submitted by client / Prototipo fornito dal cliente Brand name / Nome commerciale ............ : eXtreme 10 Serial number / Numero di serie .............. : Sample “A”: 000002; sample “B”: 000001 Lab. Identification code / Codice identificativo del laboratorio ......................... : Sample “A”: 09.893.A; sample “B”: 09.893.B Picture of marking plate / Immagine dell’etichetta: Photograph(s) of the E.u.T. / Foto dell’oggetto in prova Report No. M1.10.SOLT.0426/38192 Page 4 of 21 Ratings / Dati tecnici nominali Max working temperature [°C] / Massima temperatura operativa [°C] ............................ : Max working pressure [bar] / Massima pressione operativa [bar] .................................. : 2 Rated (recommended) flow rate [l/m h] / Portata nominale (consigliata) [l/m h] ............. : 2 160 13 -- Collector / Collettore Manufacturer / Costruttore ............................: Sunerg Solar Srl Model / Modello ...........................................: eXtreme 10 Glazed flat plate / Vetrato piano Vacuum tube – Heat pipe single glass tube / Tubi evacuati – Tubo di calore singola copertura vetrata Vacuum tube – Heat pipe double glass tube / Tubo di calore doppia copertura vetrata Collector type / Tipo di collettore ................: Vacuum tube – U Tube / Tubi evacuati – Tubi a U Vacuum tube – filled with water / Tubi evacuati riempiti d’acqua Without covering – unglazed / Scoperto - non vetrato Other / Altro Serial product / Prodotto di serie ............................................................................. : YES / SÌ NO Drawing number / N° di disegno ............................................................................ : -- Serial number / Numero di serie ............................................................................. : Sample “A”: 000002 Sample “B”: 000001 Date when manufactured / data di costruzione ........................................................ 2009 Collector loop flow range [kg/s] / Campo di flusso del circuito collettore [kg/s] ................... : -- Operating pressure [kPa] / Pressione di esercizio ..................................................... : -- 2 Stagnation temperature at 1000 W/m and 30°C ambient temperature [°C] / Temperatura di stagnazione a 1000 W/m2 e 30°C di te mperature ambiente [°C] ................................ : -- Collector mounting / Montaggio del collettore ............................................................ : on metal frame / Support metal frame material (if any) Materiale del supporto metallico N° of collectors / N° di collettori (se esistente) ........ : ............................................................................. : Galvanized alloy steel, plastics / Acciaio zincato, materiali plastici 1 Gross length [mm] / Lunghezza lorda [mm] ............................................................... : 2220 Gross width [mm] / Larghezza lorda [mm] ................................................................. : 780 Gross height [mm] / Altezza lorda [mm] ................................................................... : 100 2 Gross area [m ] / Superficie lorda [m2]..............: 2 Aperture area [m ] / Superficie di apertura [m2] ...: 2 1.7316 1.010 Absorber area [m ] / Superficie assorbitore [m2]..: 0.9312 (MS) Weight empty [kg] / Peso a vuoto [kg] .............: 32 Weight without glazing [kg] / Peso senza copertura vetrata [kg] -- Fluid capacity [l] / Capacità di contenimento di fluido [l] 0.71 Report No. M1.10.SOLT.0426/38192 su supporti metallici Page 5 of 21 Number of covers / Numero di coperture 1 Cover material / Materiale copertura Evacuated glass tubes / Tubi Cover thickness [mm] / Spessore copertura [mm] -- Cover solar transmittance [%] / Trasmittanza solare della copertura [%] .......................... : -- coassiali in vetro Absorber material / Materiale assorbitore : Copper absorber plate / Piastre assorbenti in rame Absorber’s dimensions / Dimensioni dell’assorbitore ................................................... : 48 mm x 1940 mm (length of absorber’s tube ) x 10 (n° of tubes) Absorber’s thickness [mm] / Spessore dell’assorbitore [mm] ........................................ -- Absorber dry weight [kg] / Peso a vuoto dell’assorbitore [kg] ......................................... : -- Absorber – Fin width [mm] / Larghezza alette dell’assorbitore [mm] ................................ : 48 Absorber – Fin thickness [mm] / Spessore alette dell’assorbitore [mm] ........................... : 0.12 Solar absorptance α / Fattore di assorbimento solare α ............................................... : 95 Hemispherical emittance ε / Emittanza emisferica ε .................................................. : 5 Surface treatment / Trattamento superficiale.............................................................. : Construction type / Tipo di costruzione .............................................................. : Titanium Oxide Nitride Coating / Nitruro di ossido di titanio Vacuum tubes – Heat pipe Ultrasonic welding / Tubi sottovuoto Heat Pipe - Saldatura ad ultrasuoni Number of risers / Numero di tubi di innalzamento ........................................................ : 10 Riser diameter or dimensions / Dimensioni o diametro dei tubi di innalzamento .................. : 56 mm (external diameter glass tubes) – 52.4 mm (internal diameter glass tubes) Distance between risers / Distanza tra i tubi di innalzamento ......................................... : 75 Back thermal insulation thickness / Spessore dell’isolamento termico posteriore ............... : -- Side thermal insulation thickness / Spessore dell’isolamento termico laterale................... : -- Insulation material / Materiale isolante Mineral wool / Lana minerale .............................................................. : Casing material / Materiale di contenimento .............................................................. : Printed galvanized steel / Acciaio zincato preverniciato Sealing material / Materiale di sigillatura .............................................................. : -- Other limitations / Altre limitazioni .............................................................. : -- Report No. M1.10.SOLT.0426/38192 Page 6 of 21 Sketch of the collector / Schema del collettore 0,12 21,2 10 48 75 Comments on collector design / Commenti sul progetto del collettore ............................ : Heat transfer medium / Mezzo termovettore ............................................................ : None / Nessuno Water-glycol mixture 30% / Miscela acqua-glicole al 30% Alternative acceptable heat transfer Water (in this condition no freeze protection is ensured) / Acqua (in questa fluids / Fluido termovettore alternative accettabile : condizione non è assicurata la protezione dal gelo) Test item particulars: / Particolari dell’oggetto in prova Accessories and detachable parts included in the evaluation / Accessori e parti separabili incluse nella valutazione.................................................................................. : -- Options included / Opzioni incluse ......................................................................... : -- Component list / Distinta dei componenti Item / Componente Supplier / Fornitore Item code / Codice Notes-material / componente Note - materiale Tubo di vetro / Glass tube Narva Gmbh -- -- Heat pipe bar / Barra Heat pipe Narva Gmbh -- -- Tubi manifold / Manifold tubes Narva Gmbh -- -- Tubi assorbitore / Absorber tubes Narva Gmbh -- -- Copertura manifold / Manifold covering Rogialli Srl -- -- Isolante Manifold / Manifold Insulation Thermoform -- -- Sealants / Sigillanti -- -- -- Report No. M1.10.SOLT.0426/38192 Page 7 of 21 Test summary statement / Attestazione di prova The product tested as described on page 1 through 7 complies with the requirements of the st standard(s) mentioned on page 1, as detailed below. The measurements were carried out from 1 th April 2010 to 26 May 2010. No problems or relevant observations occurred during the measurements. Il prodotto testato, come descritto nelle pagine da 1 a 9, rispetta i requisiti della(e) norma(e) citata (e) a pagina 1, come dettagliato nel seguito. Le misure sono state effettuate dal 1 aprile 2010 al 26 maggio 2010. Durante le misure non è stato evidenziato nessun problema né rilievo significativo. Record of test sequence and summary of main results / Sequenza delle prove Clause Date / Data Clause EN 129751 EN 129752 5.3.2 5.2 Test / Prova Internal pressure for absorbers / Results Start / End / Inizio Fine 2009/11/17 2009/11/17 Pressione interna degli assorbitori 5.3.3 5.3.4 5.3 5.4 2010/04/06 2010/04/06 Resistenza alle alte temperature 5.5 Exposure test / Prova dello shock termico esterno Internal thermal shock / 5.3.6 5.3.7 5.3.10 5.6 5.7 5.8 Prova dello shock termico interno 2010/04/05 2010/05/26 5.9 First 2010/04/21 2010/04/21 Second 2010/05/21 2010/05/21 First 2010/04/22 2010/04/22 Second 2010/05/26 2010/05/26 2010/05/18 2010/05/18 5.10 -- 5.11 Rain penetration test / Prova di penetrazione della pioggia Freeze resistance test / Mechanical load test/ Impact resistance test (optional)/ 2009/11/18 2009/11/18 6 Thermal performance testing / (see Tab. 5) P P (see Tab. 7) 2009/11/19 2009/11/19 P (see Tab. 8) -- -- 2010/07/16 2010/07/16 Prova di resistenza all’impatto (opzionale) Dismantling final inspection / P (see Tab. 6) Ispezione finale di smontaggio 5.3.9 P (see Tab. 4) Prova di carico meccanico 4.1.7 P (see Tabb. 3A, 3B) Prova di resistenza al gelo 5.3.8 P (see Tab. 2) Prova di esposizione 5.3.5 P (see Tab. 1) High temperature resistance / External thermal shock / Risultati Not performed P (see Tab. 9) 2010/04/05 2010/05/26 See/vedi tab. 10 Prova delle prestazioni termiche Report No. M1.10.SOLT.0426/38192 Page 8 of 21 § 5.2 TAB. 1: Internal pressure for inorganic absorbers / Pressione interna degli assorbitori inorganici Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : 2009/11/17 Test installation / Installazione di prova Test end [YYYY/MM/DD] / Data fine prova [AAAA/MM/GG] .................... : Outdoor 2009/11/17 Indoor Maximum allowed working pressure 1300 MS [kPa] / Massima pressione di esercizio ammessa specificata dal costruttore [kPa] Test ambient temperature [°C] / Test conditions / Condizioni di prova Temperatura ambiente di prova [°C] 1950 Test pressure [kPa] / Pressione di prova [kPa] 15 Test duration [min] / Durata di prova [min] Results / Risultati Failure occurred/ Potential failure. / --. 19 Verdict Absorber leakage P Deformation such to establish permanent contact between absorber and cover P Breaking or permanent deformation of collector fixing points or collector box P Vacuum loss P Accumulation of humidity in form of condensate on the inside of the transparent cover of the collector exceeding 10% of the aperture area P Other: P Remarks / Osservazioni: no failure observed Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 9 of 21 § 5.3 TAB. 2: High temperature resistance / Resistenza alle alte temperature Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ 2010/04/06 Test installation / Installazione di Test end [YYYY/MM/DD] / Data fine prova [AAAA/MM/GG] ....................: Outdoor prova 2010/04/06 Indoor – solar simulator Additional information if an evacuated tubular collector was tested / Informazioni aggiuntive se la prova è stata effettuata su di un collettore a tubi evacuati The temperature of the collector was measured at the location shown below: / La temperatura del collettore è stata misurata nella posizione illustrata di seguito: Additional information required if the absorber temperature was measured using a special fluid: The collector was partially filled with ………….. and the average pressure was …………. Pa, which corresponds to the average absorber temperature of …....….… °C Collector tilt angle [°] / 45 Inclinazione del collettore [°] Average irradiance [W/m2] / Irraggiamento medio [W/m2] 921 Test conditions / Condizioni di Average surrounding air temperature [°C] / Temperatura ambiente media [°C] 16.3 prova Average surrounding air speed m/s] / Velocità del vento media [m/s] 0.23 Average absorber temperature [°C] / Temperatura media dell’assorbitore [°C] 158 63 Test duration [min] / Durata di prova [min] Calculated collector stagnation temperature [°C] / Temperatura di stagnazione del collettore calcolata [°C] Failure occurred/ Potential failure. / --. Results / Risultati 184 Verdict Absorber leakage P Deformation such to establish permanent contact between absorber and cover P Breaking or permanent deformation of collector fixing points or collector box P Vacuum loss P Accumulation of humidity in form of condensate on the inside of the transparent cover of the collector exceeding 10% of the aperture area P Other: P Remarks / Osservazioni Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 10 of 21 § 5.4 TAB. 3A: Exposure test / Prova di esposizione Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................................... : 2010/04/05 Test end [YYYY/MM/DD] / Data fine 2010/05/26 prova [AAAA/MM/GG] ............................... : Collector tilt / Inclinazione del collettore [°]: 45 Collector azimuth / angolo azimutale del collettore rispetto al sud [°]: 0 Day Date Irradiation H [MJ/m2] Air temperature ta [°C] 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2010/04/05 2010/04/06 2010/04/07 2010/04/08 2010/04/09 2010/04/10 2010/04/11 2010/04/12 2010/04/13 2010/04/14 2010/04/15 2010/04/16 2010/04/17 2010/04/18 2010/04/19 2010/04/20 2010/04/21 2010/04/22 2010/04/23 2010/04/24 2010/04/25 2010/04/26 2010/04/27 2010/04/28 2010/04/29 2010/04/30 16.3 16.5 16.4 16.1 15.2 17.1 3.4 2.2 4.6 15.7 4.6 8.3 3.7 17.2 17.3 16.4 18.1 14.7 3.1 2.6 15.1 2.1 1.8 14.5 16.8 3.4 17 18 17 16 22 24 13 12 14 17 16 18 16 14 22 23 23 21 15 20 24 24 18 23 23 21 Rain Day Date Irradiation H [MJ/m2] Air temperature ta [°C] 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 2010/05/01 2010/05/02 2010/05/03 2010/05/04 2010/05/05 2010/05/06 2010/05/07 2010/05/08 2010/05/09 2010/05/10 2010/05/11 2010/05/12 2010/05/13 2010/05/14 2010/05/15 2010/05/16 2010/05/17 2010/05/18 2010/05/19 2010/05/20 2010/05/21 2010/05/22 2010/05/23 2010/05/24 2010/05/25 2010/05/26 2.7 1.8 3.1 17.4 1.2 16.2 4.5 14.8 3.8 6.3 5.4 7.2 8.4 7.7 15.4 16.1 17.4 18.2 18.4 18.3 18.2 18.7 19.1 19.6 19.3 18.4 18 15 18 12 13 15 12 17 17 18 18 18 18 16 20 22 22 22 20 24 25 26 26 27 27 24 2 Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2010/04/05 2010/04/06 2010/04/07 2010/04/08 2010/04/09 2010/04/10 2010/04/14 2010/04/18 2010/04/19 2010/04/20 2010/04/21 2010/04/22 2010/04/28 2010/04/29 2010/05/04 Air temperature ta [°C] 17 18 17 16 22 24 17 14 22 23 23 21 23 23 12 Irradiance G [W/m2] 904 901 891 926 919 900 909 872 901 901 903 906 903 909 895 2 Time periods [min] 73 60 70 51 51 64 66 71 86 46 81 71 76 76 97 Period Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 2010/05/06 2010/05/08 2010/05/15 2010/05/16 2010/05/17 2010/05/18 2010/05/19 2010/05/20 2010/05/21 2010/05/22 2010/05/23 2010/05/24 2010/05/25 2010/05/26 Irradiance G [W/m2] 909 920 896 896 910 899 885 978 878 909 873 906 880 908 Air temperature ta [°C] 15 17 20 22 22 22 20 24 25 26 26 27 27 24 Total hours with G > 850 W/m , air temperature > 10 ° C / Ore totali con G > 850 W/m2; temperatura ambiente > 10 °C : Report No. M1.10.SOLT.0426/38192 30 Total days in which H > 14 MJ/m / Giorni totali con H > 14 MJ/m2: Period Rain Time periods [min] 54 81 37 74 63 45 63 73 89 88 59 74 80 76 33 Page 11 of 21 § 5.4 TAB. 3B: Inspection after exposure test/ Ispezione dopo il test di esposizione Test start [YYYY/MM/DD] 2010/05/26 Data inizio prova [AAAA/MM/GG] Test end [YYYY/MM/DD] 2010/05/26 Data fine prova [AAAA/MM/GG] Collector fluid loop / Circuito idraulico del collettore Potential problems Evaluation Verdict Swelling of pipes and components / Rigonfiamenti di tubature e componenti N/A N/A Fluid leakages / Perdite di liquidi e sgocciolamenti N/A N/A Cracking / Rotture N/A N/A Warping / Deformazioni N/A N/A Corrosion / Corrosione N/A N/A Evaluation* Verdict 0 P 0 P 0 P 0 P Deformation/corrosion/leakage/loss of bonding of the absorber tubes and headers / Deformazioni/corrosione/perdite/distacchi dei tubi dell’assorbitore e dei raccordi 0 P Deformation/corrosion of the absorber mountings / Deformazioni/segni di 0 P 0 P Strength / Solidità 0 P Safety / Sicurezza 0 P Loss of function / Perdita di funzionalità N/A N/A Safety / Sicurezza N/A N/A Collector / Collettore Potential problems/failures Cracking/warping/corrosion/rain penetration of the collector box/fasteners Rotture/deformazioni/corrosione/penetrazione di pioggia nella scatola del collettore e/o negli aggraffaggi Cracking/adhesion/elasticity of the seals/gaskets / Rottura/incollamento/elasticizzazione dei sigillanti e/o delle guarnizioni Cracking/crazing/buckling/delamination/ warping/outgassing of the cover/reflector / Rotture/formazione di crepe/crolli/delaminazioni/deformazioni/perdite di vuoto della copertura e/o del riflettore Cracking/crazing/blistering of the absorber coating / Rotture/crepe/formazioni di bolle sul rivestimento dell’assorbitore corrosione dei dispositivi di montaggio e fissaggio dell’assorbitore Water retention/outgassing/degradation of the thermal insulation / Ritenzione d’acqua/perdita di vuoto/ degradazione dell’isolante termico Mounting structure / Strutture di montaggio Safety equipment / Equipaggiamento di sicurezza *Evaluation scale / Scala di valutazione: 0 - No problem / Nessun problema 1 - Requirement apart from testing not fulfilled (minor failure) / Problema di entità minore 2 - Requirements for testing not fulfilled (major failure) / Problemi non trascurabili N/A - Inspection to establish the condition was not possible / Ispezione non possibile Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 12 of 21 § 5.5 TAB. 4: External thermal shock test / Prova dello shock termico esterno Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : Test installation / Installazione di prova Test end [YYYY/MM/DD] / 2010/04/21 Data fine prova [AAAA/MM/GG] .................... : Outdoor 2010/05/21 Indoor Test combined with exposure test / Test combinato con il test di esposizione Test combined with high temperature resistance test / Test combinato con il test di resistenza alle alte temperature Additional information if an evacuated tubular collector was tested / Informazioni aggiuntive se la prova è stata effettuata su di un collettore a tubi evacuati The temperature of the collector was measured at the location shown below: / La N/A temperatura del collettore è stata misurata nella posizione illustrata di seguito: Additional information required if the absorber temperature was measured using a special fluid: The collector was partially filled with ………….. and the average pressure was …………. Pa, which corresponds to the average absorber temperature of …....….… °C Shock n° 1 2 2010/04/21 2010/05/21 45 45 927 976 Minimum irradiance W/m ] / Irraggiamento minimo [W/m ] 902 954 Average air temperature [°C] / Temperatura ambiente media [°C] 23.2 25.1 Minimum air temperature [°C] / Temperatura amb. minima [°C] 22.9 24.6 Preconditioning period [min] / Durata di precondizionamento [min] 61 62 Absorber temp. before spraying [°C] / 153 157 Flow rate of water spray [kg/(s·m )] / Portata del getto d’acqua 0.037 0.038 Temperature of water spray [°C] / 16.5 17.2 15 15 Test date / data di prova Collector tilt angle [°] / Angolo di inclinazione del collettore [°] 2 Average irradiance W/m ] / Irraggiamento medio [W/m ] 2 2 Test conditions / Condizioni di prova N/A 2 Temp. dell’assorbitore prima del getto [°C] 2 [kg/(s•m2)] Temperatura del getto d’acqua [°C] Duration of water spray [min] / Durata del getto d’acqua [min] Potential failure. / Danno potenziale Failure occurred/ danneggiamenti occorsi Absorber leakage Deformation such to establish permanent contact between absorber and cover Breaking or permanent deformation of collector fixing points or Results / Risultati collector box Vacuum loss Accumulation of humidity in form of condensate on the inside of the transparent cover of the collector exceeding 10% of the aperture area Other: Remarks / Osservazioni :No failure detected / Nessun danneggiamento rilevato Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 13 of 21 § 5.6 TAB. 5: Internal thermal shock test / Prova dello shock termico interno Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : Test installation / Installazione di prova 2010/04/22 Test end [YYYY/MM/DD] / Data fine prova [AAAA/MM/GG] .................... : Outdoor 2010/05/26 Indoor Test combined with exposure test / Test combinato con il test di esposizione Test combined with high temperature resistance test / Test combinato con il test di resistenza alle alte temperature Additional information if an evacuated tubular collector was tested / Informazioni aggiuntive se la prova è stata effettuata su di un collettore a tubi evacuati The temperature of the collector was measured at the location shown below: / La N/A temperatura del collettore è stata misurata nella posizione illustrata di seguito: Additional information required if the absorber temperature was measured using a special fluid: The collector was partially filled with ………….. and the average pressure was …………. Pa, which corresponds to the average absorber temperature of …....….… °C Shock n° 1 2 2010/04/22 2010/05/26 45 45 946 949 Minimum irradiance W/m ] / Irraggiamento minimo [W/m ] 911 934 Average air temperature [°C] / Temperatura ambiente media [°C] 21.2 24.8 Minimum air temperature [°C] / Temperatura amb. minima [°C] 20.8 24.4 Preconditioning period [min] / Durata di precondizionamento [min] 60 61 Absorber temp. before flowing [°C] / 152 156 Flow rate of heat transfer fluid [kg/(s·m )] / Portata di fluido 0.019 0.018 Temperature of heat transfer fluid [°C] / 16.8 18.1 6 7 Test date / data di prova Collector tilt angle [°] / Angolo di inclinazione del collettore [°] 2 Average irradiance W/m ] / Irraggiamento medio [W/m2] 2 Test conditions / Condizioni di prova N/A 2 Temp. dell’assorbitore prima del flusso [°C] 2 termovettore [kg/(s•m2)] Temperatura del fluido termovettore [°C] Duration of flow [min] / Durata del flusso [min] Potential failure. / Danno potenziale Failure occurred/ danneggiamenti occorsi Absorber leakage Deformation such to establish permanent contact between absorber and cover Breaking or permanent deformation of collector fixing points or Results / Risultati collector box Vacuum loss Accumulation of humidity in form of condensate on the inside of the transparent cover of the collector exceeding 10% of the aperture area Other: Remarks / Osservazioni :No failure detected / Nessun danneggiamento rilevato Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 14 of 21 § 5.7 TAB. 6: Rain penetration test / Prova di penetrazione della pioggia Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : 2010/05/18 Test installation / Installazione di prova Test end [YYYY/MM/DD] / Data fine prova [AAAA/MM/GG] ....................: Outdoor Collector mounted on / Collettore Indoor Open frame/ Struttura aperta montato su: Method used to keep the absorber warm / Metodo usato per mantenere caldo il collettore: 2010/05/18 Simulated roof / Tetto simulato Hot water circulation / Circolazione di acqua calda Exposure of collector to solar radiation / Esposizione del collettore alla radiazione solare Collector tilt angle [°] / 45 Angolo di inclinazione del collettore [°] 2 Water flow rate [kg/(s·m )] / Portata di fluido termovettore [kg/(s•m2)] 0.054 Temperature of heat transfer fluid [°C] / 53.7 Test conditions / Condizioni di prova Temperatura del fluido termovettore [°C] Duration of water spray [h] / Durata del getto d’acqua [h] 4 Potential failure. / Danno potenziale Failure occurred/ danneggiamenti occorsi Water penetration Absorber leakage Deformation such to establish permanent contact between absorber and cover Results / Risultati Breaking or permanent deformation of collector fixing points or collector box Vacuum loss Accumulation of humidity in form of condensate on the inside of the transparent cover of the collector exceeding 10% of the aperture area Other: Remarks / Osservazioni : No rain penetration / nessuna penetrazione di pioggia No failure detected / Nessun danneggiamento rilevato Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 15 of 21 § 5.8 TAB. 7: Freeze resistance test / Prova di resistenza al gelo Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : Collector type / Tipo di collettore 2009/11/18 Test end [YYYY/MM/DD] / 2009/11/18 : Data fine prova [AAAA/MM/GG] Freeze-resistant when filled with water Drain-down Antifreeze fluid (MS) / Liquido antigelo specificato dal costruttore Water- Propylene glycol mixture / Miscela acqua-glicole propilenico Tilt angle of the collector [°] / Test conditions / Condizioni di prova Angolo di inclinazione del collettore [°] Rate of chamber cooling [K/h] / Velocità di raffreddamento [K/h] Rate of chamber heating [K/h] / Velocità di riscaldamento [K/h] N° of freezethaw cycle Freeze conditions / Condizioni di congelamento Test temperature [°C] Duration [min] Thaw conditions / Condizioni di scongelamento Test temperature [°C] Duration [min] 1 2 3 Results / Risultati Potential failure. / --. Failure occurred/ Verdict Absorber leakage Deformation such to establish permanent contact between absorber and cover Breaking or permanent deformation of collector fixing points or collector box Vacuum loss Accumulation of humidity in form of condensate on the inside of the transparent cover of the collector exceeding 10% of the aperture area Other: Remarks / Osservazioni: The manufacturer recommends the use of a water-propylene glycol mixture in the solar loop. / Il costruttore raccomanda l’utilizzo di una miscela acqua-glicole propilenico nel circuito solare. Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS (see Remarks) Page 16 of 21 § 5.9 TAB. 8: Mechanical load test / Prova di carico meccanico POSITIVE PRESSURE TEST OF THE COLLECTOR COVER Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : 2009/11/19 Test end [YYYY/MM/DD] / : Data fine prova [AAAA/MM/GG] 2009/11/19 Loading with gravel or similar material Method used to apply positive Loading with water pressure to the cover / Metodo usato per Suction cups applicare il carico positivo alla copertura Pressurisation of collector cover Test conditions / Condizioni di prova 1000 Maximum pressure load [Pa] / Pressione di carico massima [Pa] Remarks / Note Negative pressure test of fixings between the cover and collector box Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : 2009/11/19 Test end [YYYY/MM/DD] / : Data fine prova [AAAA/MM/GG] 2009/11/19 Method used to apply negative Suction cups pressure to the cover / Metodo usato per applicare il carico negativo alla copertura Pressurisation of collector box N/A Test conditions / Condizioni di prova Maximum pressure load [Pa] / Pressione di carico massima [Pa] Remarks / Note This test is not applicable to the E.u.T. / Questa prova non è applicabile al collettore Negative pressure test of collector mountings Test start [YYYY/MM/DD] / Data inizio prova [AAAA/MM/GG] ................ : 2009/11/19 Test end [YYYY/MM/DD] / : Data fine prova [AAAA/MM/GG] 2009/11/19 Method used to apply negative Suction cups pressure to the cover / Metodo usato per applicare il carico negativo alla copertura Air bags N/A Test conditions / Condizioni di prova Maximum pressure load [Pa] / Pressione di carico massima [Pa] Remarks / Note This test is not applicable to the E.u.T. / Questa prova non è applicabile al collettore Results / Risultati Failure occurred/ Potential failure. / --. Verdict Absorber leakage P Deformation such to establish permanent contact between absorber and cover P Breaking or permanent deformation of collector fixing points or collector box P Vacuum loss P Other: P Remarks / Osservazioni: Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 17 of 21 § 5.11 TAB. 9: Final inspection / Ispezione finale Test start [YYYY/MM/DD] 2010/07/16 Data inizio prova [AAAA/MM/GG] Test end [YYYY/MM/DD] 2010/07/16 Data fine prova [AAAA/MM/GG] Collector loop pipes / Tubazioni del circuito collettore Potential problems Evaluation Verdict Swelling of pipes and components / Rigonfiamenti di tubature e componenti N/A N/A Fluid leakages / Perdite di liquidi e sgocciolamenti N/A N/A Cracking / Rotture N/A N/A Warping / Deformazioni N/A N/A Corrosion / Corrosione N/A N/A Water retention/outgassing/degradation of the insulation / Ritenzione d’acqua / N/A N/A Evaluation* Verdict 0 P 0 P 0 P 0 P Deformation/corrosion/leakage/loss of bonding of the absorber tubes and headers / Deformazioni/corrosion/perdite/distacchi dei tubi dell’assorbitore e dei raccordi 0 P Deformation/corrosion of the absorber mountings / Deformazioni/segni di corrosion 0 P 0 P Strength / Solidità 0 P Safety / Sicurezza 0 P Loss of function / Perdita di funzionalità N/A N/A Safety / Sicurezza N/A N/A Perdita del vuoto / degradazione dell’isolamento Collector / Collettore Potential problems/failures Cracking/warping/corrosion/rain penetration of the collector box/fasteners Rotture/deformazioni/corrosione/penetrazione di pioggia nella scatola del collettore e/o negli aggraffaggi Cracking/adhesion/elasticity of the seals/gaskets / Rottura/incollamento/elasticizzazione dei sigillanti e/o delle guarnizioni Cracking/crazing/buckling/delamination/ warping/outgassing of the cover/reflector / Rotture/formazione di crepe/crolli/delaminazioni/deformazioni/perdite di vuoto della copertura e/o del riflettore Cracking/crazing/blistering of the absorber coating / Rotture/crepe/formazioni di bolle sul rivestimento dell’assorbitore dei dispositive di montaggio e fissaggio dell’assorbitore Water retention/outgassing/degradation of the thermal insulation / Ritenzione d’acqua/perdita di vuoto/ degradazione dell’isolante termico Mounting structure / Strutture di montaggio Safety equipment / Equipaggiamento di sicurezza *Evaluation scale / Scala di valutazione: 0 - No problem / Nessun problema 1 - Requirement apart from testing not fulfilled (minor failure) / Problema di entità minore 2 - Requirements for testing not fulfilled (major failure) / Problemi non trascurabili N/A - Inspection to establish the condition was not possible / Ispezione non possibile Verdict / Esito Report No. M1.10.SOLT.0426/38192 PASS Page 18 of 21 §6 TAB. 10: Thermal performance / Prestazioni termiche Test start [YYYY/MM/DD] 2010/04/05 Data inizio prova [AAAA/MM/GG] Test method / Metodo di prova Test end [YYYY/MM/DD] 2010/05/26 Data fine prova [AAAA/MM/GG] 6.1 Outdoor – Steady state 6.1 Indoor – Steady state method 44° 52’ N Longitude / Longitudine: Latitude / Latitudine: Collector tilt / Inclinazione del collettore [°] 6.3 Outdoor – quasi-dynamic 08° 48’ E Collector azimuth /Orientamento azimutale del 45 South / Sud collettore Orientation of absorber tubes during testing / Orientamento dei tubi del collettore durante la prova Vertical/ verticale Test results / Risultati di prova Peak power [W] / 670 Potenza di picco [W] Irradiance / Irraggiamento 400 W/m2 700 W/m2 Tm - Ta [K] 1000 W/m2 0 268,0 468,9 669,9 10 251,0 452,9 654,6 20 228,5 434,3 637,1 30 200,4 411,8 617,3 40 166,7 386,1 595,3 50 127,5 358,1 571,1 60 82,8 325,9 544,7 70 32,5 291,8 516,1 800,0 700,0 600,0 500,0 400,0 300,0 200,0 100,0 0,0 0 10 Report No. M1.10.SOLT.0426/38192 20 30 40 50 60 70 Page 19 of 21 The istantaneous efficiency is defined as / L’efficienza istantanea è definita come: ηA = Q ⋅ AA ⋅ G ηa = Flow rate used for performance testing (average): 0,019 kg/s/m Q ⋅ Aa ⋅ G 2 2 Flusso utilizzato per il test (valore medio): 0,019 kg/s/m Second order fit to data / Regressione lineare del secondo ordine 2 t −t - a1A t m − t a - a2AG m a ; G G ηA = η 0 A ηa = η 0 a t −t - a1a t m − t a - a2aG m a G G 0,8 2 2 y = -11,925x - 1,5252x + 0,7194 0,7 0,6 0,5 Serie1 0,4 Poli. (Serie1) 0,3 0,2 0,1 0 0 0,02 0,04 0,06 Abs orber Aperture 0,08 0,1 Gros s 0,8 0,7 0,6 0,5 0,4 0,3 0,2 0,1 0 0 0,02 0,04 0,06 0,08 0,1 Fit to absorber area / Std dev. / Fit to aperture area / Std dev. / Fit all’area dell’assorbitore Deviazione standard Fit all’area di apertura Deviazione standard η0A a1A a2A 0.72 1.525 0.0149 Report No. M1.10.SOLT.0426/38192 0.04 0.08 0.006 η0a a1a a2a 0.66 1.406 0.0137 0.04 0.08 0.006 Page 20 of 21 Time constant / Costante di tempo The time constant τc of the collector has been measured as the time elapsed between the removal of a cover used to achieve a steady state condition of the water temperature at the outlet and the point where the collector outlet temperature rises to 63,2 % of the total increase up to the next steady state condition. La costante di tempo τc del collettore è stata misurata come il tempo trascorso tra la rimozione del rivestimento usato per raggiungere la condizione stazionaria della temperatura dell’acqua all’uscita e al punto dove la temperatura di uscita del collettore sale a 63,2% dell’incremento totale alla successiva condizione stazionaria. τc = 52 s Effective thermal capacity / Capacità termica effettiva The effective thermal capacity is calculated from or from the measurement records of tin, ∆Τ, ta , G and by the following relation for outdoor testing : La capacità termica effettiva è calcolata dalle registrazioni misurate di tin, ∆Τ, ta , G utilizzando la seguente relazione per test all’aperto: C= A G η 0G ∫ t2 t1 . G dt − m c f ∫ t2 t1 1 t2 t2 ∆ T dt − A G U G ∫ (t in − t a ) dt + ∫ ∆ T dt 2 t1 t1 t m2 − t m1 C = 7.4 kJ/k Incidence angle modifier (IAM) / Coefficiente di angolo di incidenza Angle 00 300 450 50° 60 0 65° 80° Kθ – Longitudinal (IAM-L) 1 1 0.98 0.95 0.86 0.80 0.5 Kθ – Transversal (IAM-T) 1 1 0.98 0.95 0.86 0.80 0.5 ----------------- End of Test Report No. M1.10.SOLT.0426/38192 ------------------ Report No. M1.10.SOLT.0426/38192 Page 21 of 21