NNfC monthly admin committee meeting Dry Etch and Thin films & Process Integration August 26, 2014 Tool issues • eBeam deposition: Down time due to e-gun arching and single operational gun. Two new electron guns installed on August 13th. Most commonly used materials qualified on 15cc crucibles to more efficiently use target. Previously all depositions, including Gold was being done on 25cc crucibles. • Sputter tools: Sputter2 down for mid-July to early August due to WindowsXP boot-up and PC system. Issue resolved with help from Smart Systems. New deposition requests denied: Special targets such as TaN and TiW not available. Thick Al2O3 (100nm) requiring long deposition times. 2 Tool issues • DRIE: SPTS local support has been discontinued, causing longer down times and slow recovery. System not fully operational after conversion to 4-inch chuck. System is now working with limited capability – only HF bias (13.56MHz) recipes qualified. Seeing excessive polymer deposition on LF (350KHz) bias recipes. Troubleshooting on-going with phone and email support from Singapore. Need to accelerate PM schedule – parts being ordered for first major PM in two years … Target Nov ‘14. 3 Equipment Utilization Chart- August 2014 600 500 Total hrs 400 300 200 100 0 Total pecvdpecvdnon office office hrs hrs DrieDrienon office office hrs hrs rie flrie flnon office office hrs hrs rie clrie clnon office office hrs hrs sputtersputter 1- 1- non office office hrs hrs sputtersputter 2- 2 - non office office hrs hrs E-beam E-beam evptrevptrnonoffice office hrs hrs 180 540 180 540 180 540 180 540 180 540 180 540 180 540 RFAnelvaEquip Sputteri1- non ng- office office hrs hrs Therma Therma l l Evapor Evapor atoratornon office office hrs hrs 180 540 180 540 Unavailable 0 180 0 180 0 180 0 180 0 180 0 180 0 180 0 180 0 180 Downtime 0 0 72 99 0 0 0 0 0 32 16 50 52 114 0 0 0 0 7 210 113 287 28 246 4 344 28 348 51 100 0 176 16 152 12 Not Used 136 349 93 261 Used 44 15 0 11 122 359 145 356 58 35 1 4 173 118 23 Equipment Utilization Chart- Comparison 200 Sputter Coater1 Sputter Coater2 E-beam Evaporator Anelva Sputter Thermal Evap. PECVD DRIE RIE-Fl RIE-Cl Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y Ma JunJulyAug y 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Unavailable 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 180 160 Total hrs 140 120 100 80 60 40 20 0 Total Downtime 12 1 4 0 3 83 27 72 7 6 0 0 8 0 4 0 0 0 0 0 18 40 14 16 32 0 12 52 0 0 0 0 8 0 0 0 Not Used 73 99 86 13 11 50 12 93 10 13 12 12 11 12 12 14 0 37 0 7 0 10 11 11 52 28 12 28 12 16 8 4 36 48 32 28 Used 95 80 90 44 62 47 30 15 69 37 58 58 62 58 50 35 18 14 18 17 0 31 21 51 96 15 15 10 16 16 17 17 13 13 14 15 MTRDC project progress • Unit process development started in Aug. – Key challenges in eChannel RIE, Au-seed layer, gold plating, wafer bonding and dicing. • Prasiddhi mask ordered to start structural learning. Sadanand Deshpande, NNFC 6