General Introduction • Work done in the past 4 months presented in the individual sub-detectors talks: highlights • Construction is now fully going on but tests are continuing • Much more detailed schedule for the next year A. Baldini PSI July 04 INFN & Genova University S. Dussoni, F. Gatti, P. Ottonello, D. Pergolesi, R. Valle INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, C. Gatto,G. Palama’, M. Panareo, G. Tassielli INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo’, M. Rossella INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, S. Giurgola, M.Grassi, F. Morsani, D. Nicolo’, A. Papa, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli INFN Roma I D. Zanello ICEPP, University of Tokyo Y. Hisamatsu, T. Iwamoto, T. Mashimo, S. Mihara, T. Mori, H. Natori, H. Nishiguchi, W. Ootani, K. Ozone, R. Sawada, Y. Uchiyama, S. Yamada, S. Yamashita KEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. Yoshimura Waseda University T. Doke, J. Kikuchi, H. Okada, S. Suzuki, K. Terasawa, M. Yamaguchi PSI, Villigen J. Egger, P. Kettle, M. Hildebrandt, S. Ritt, M. Schneebeli Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov A. Baldini PSI July 04 Highlights • Beam: spot size bigger than previous estimates MC simulations: is this a problem ? • Magnet: interaction with the other experiments • Xenon detector: • PMTs with double Al layer tested (very good results) • work on a modified base (zener diodes) • Drift chambers: test of foils stability introduction of a carbon fiber • Timing counter: test in the COBRA field • Electronics: new design of the DSR (x-talk) • Software: framework chosen. Further people joining the experiment A. Baldini PSI July 04 Construction • Beam: •Triplet I and II finished • BTS specifications sent to Novosibirsk • Xenon detector: • Cryostat design finished (order in September) • 290 PMTs ordered • Design of the PMT supporting structure • Timing Counter: • 2’’ PMTs soon ordered • final design started A. Baldini PSI July 04 Tests • Neutron test done in the past days (to be continued): initial results • Timing counters in Cobra + test of full size at different angles • New Xenon • test this year with negative pions to test timing resolutions with the new PMTs and final electronics (dsr, Trigger) • + calibration wires (spots on a thin wire) A. Baldini PSI July 04 2004 J F M A M J J MEG MEG N D Gotta Commiss. Part 1 Platf. Beam Line Drift Chamber LPT O Calibration (Wed) COBRA Timing Counter S Prac Beam Time A Proto type Mechan. Matching Test Neutr. BG PM + Src Inst Full Calorimeter Trigger Test DAQ A. Baldini PSI July 04 Pi- Beam Test Liq. Purif. 2005 J Beam Time F M A M Shutdown J J MEG 2006 A S O Gotta? N D Field Map Beam Line Drift Chamber Timing Counter Mounting LPT PMT testing + calibration BTS Test Commiss. Part 2 Full Beam Line Test Mounting & Testing BG Test Cryo. Installation Crane+ Tent Inst Studies (Wed + remote) Assembly Test Inst Inst DC Electr. BG Test Inst Trigger DAQ F Inst A. Baldini PSI July 04 M Shutdown MEG COBRA Full Calorimeter J A