RPC Database status • • • • OMDS migration POPCON (Davide) Global Run Offline Calibration to ORCON • RelVal tools status Pigi, Bill, Davide, Michael & Giovanni New OMDS status new OMDS hardware is ready at P5 DB migration has started one week ago: RPC and ECAL the first detector experts must be on call (RPC ?) commissioning at P5 after the migration (MarchApril) naming convention is almost OK for the RPC PVSS for Barrel RPC has been already migrated (G. Polese) XDAQ has been done by the central group !!! Who is in charge for that ?? CMS week - 26 Feb 2008 Pigi, Bill, Davide, Michal & Giovanni 2 CMS DB “simplified” layout streaming POPCON Offline calibration Online application (XDAQ-PVSS-RC..) • POPCON streams data from the OMDS to ORCON • ORACLE streaming copy data from ONLINE (ORCON) to ORCOFF CMS week - 26 Feb 2008 3 • Could be necessary to move data also in the opposite direction: Import Pigi, Bill, Davide, Michal & POPCON 2_0_X In the March GR will be used the POPCON 1_8_X “new” POPCON framework (2_0_X) is now ready and under debugging subsystem are moving to the 2_0_X Central DB group is collecting and test the subdetectors POPCON applications Central DB group will develop a unique and central script to run POPCON, manually and automatically. monitor POPCON is under development (Michele, IT and Pietro Pica) CMS week - 26 Feb 2008 Pigi, Bill, Davide, Michal & Giovanni 4 ORCON payload (to update) Data to write in ORCON notes frequency tot/day (MB) STRIP Cabling – noise – pedestals - bad components – gain from calibration - power supply states – alignment (survey/laser) – lorentz angle ? - gain from particles ? Only CCR07 – DQM on ORCON at P5 – POPCON ready in 170_xx Cabling, noise, pedestal and gain (once per day) bad components (once per day) align (once per global run) ~ 100 ECAL Pedestal – calibration POPCON for pedestal READY Pedestal (once per run) ~ 100 HCAL Electronic map - pedestal – gains – widths – QIE response POPCON under test. Ready for CCR07 Pedestal (once per day/run) - Others (when the readout config change) ~ 10 CSC Calibration in local runs (3 objects: gains, crosstalk and noise) – alignment (few objects) - mapping POPCON not ready (CCR07 ?) Calib-Align (once) mapping (once) ~ 50 DT Cabling – calibration (pedestal and time-offset) ORCON populates with offline result POPCON ready for CCR07 Time-offset calibration (every trigger config.) ~1 Cable map (once) – DCS (min.) ~ 200 Cable map will be written once in ORCON using – DCS CMS weeksqlite - 26file Feb 2008for offline calibration (used in ORCOFF) RPC POPCON under test. Ready for CCR07 No continuosly updating – total of about 500 MB per day Pigi, Bill, Davide, Michal & Giovanni 5 calibration constants calculated OFFLINE to copy to ORCON Type Computed size Frequency PXL Lorentz Angle offline 15 KB weeks TRK dE/dx (gain) offline 500 KB weeks/months Lorentz angle offline 100 KB week online/offline 5 MB Crystal inter calibration offline ? from days to months Gain ratio offline ? year Weights for pulse-height reco offline ? year response correction factor offline < 1 MB weeks pedestal and pedestal width online/offline 2.5 MB days to year Channel status online/offline < 1 MB ? Zeros suppr. threshold online/offline < 1 MB ? Elect. map, gains and qie offline few MB year T0 interchannel synchronization offline 10 MB months trigger time pedestal (trig config) offline 1 MB from days to year (long term) V drift offline 1 MB from days to year (long term) Geometry costants ECAL HCAL DT several/once per day Contact person Freya Blekman G. Bruno V. Ciulli Martin Weber F. Cavallari R. Ofierzynski P. Ronchese & S. Maselli DB payload for the 2009 (100 days) CondDB Config ORCON ORCOFF PIXEL < 80 < 20 < 50 < 50 STRIP 20 2 10 10 ECAL 460 1 31 31 HCAL 23 0.2 0.5 0.5 CSC 60 0.1 8 8 DT 300 1 15 15 RPC 50 1 5 5 Lumi 200 - - - 6 GB 70 GB 70 GB 1200 GB TOTALE CMS week - 26 Feb 2008 Pigi, Bill, Davide, Michal & Giovanni 7 What we need for the April Global Run Run with the new OMDS at P5 barrel DCS are ready to do it test the configuration and the XDAQ condition do we want to store the XDAQ condition from PVSS (using PSX to get them) ?? or continue with the present DB schema ?? run the 3 RPC POPCON 2_0_0 applications in a standalone and central way do we need more POPCON applications ? improve our trigger DQM (online and offline) CMS week - 26 Feb 2008 Pigi, Bill, Davide, Michal & Giovanni 8 DB coordinators and links Hypernews: https://hypernews.cern.ch/HyperNews/CMS/get/database.html Twiki: https://twiki.cern.ch/twiki/bin/view/CMS/DatabaseWikiHome DB sub-projects (online - offline) coordinators are: PIXEL (Ioshi - Chiochia) STRIP (Drouhin - Giordano) ECAL (Cavallari) CSC (Vorobiev, Boeriu) DT (Parenti ? - Ronchese) RPC (Whitaker ? – Pagano) TRIGGER (LV1 Varela - HLT Meschi) DQM (Meyer) ONLINE (Glege) OFFLINE (Innocente) LUMI (Luecking) HCAL (Narain (Lukhanin Ofierynski)) CMS week - 26 Feb 2008 Pigi, Bill, Davide, Michal & Giovanni 9