ARCHITECT
ITALY
Curricula
Giuseppe D’ERRICO
mail
PEC
Cell
[email protected]
[email protected]
3336306240
P.iva : 056 44 70 12 10
2013
CURRICULUM
PROFESSIONAL
Name and surname:
Giuseppe D’Errico
Place and date of birth :
Napoli 28/07/1971
Location-Studio : Via Filippo Turati n° 4/Grumo Nevano (NA)
Telephono:
081/8802006 (Studio); 333/6306240 (Cell.)
P.iva : 056 44 70 12 10
E-mail:
P.E.C.
[email protected]
[email protected]
Marital status :
Military Service :
Single
Completed as Civil Service
STUDIES
Diploma of Artistic achieved in 1988/89, at the High School State Aversa (CE) with 49/60;
Year Supplementary achieved in 1989/90 ;
Degree in Architecture on 01/06/2002, at the Second University of Naples with 104/110 ;
Thesis: Design of the new university complex of the Second University of Naples for the
Faculty of Architecture and Engineering Site former Psychiatric Hospital in Aversa (CE) Italy ;
Qualified Architect with state exam
University of Studies of Naples Federico II;
passed
in
the
first
session
in
2002
at
the
Registered with the Architects of Naples from 28/01/2003 with registration number 8532 ;
Admitted to the CTU the Court of Naples with registration number 11023 ;
TRAINING AND QUALIFICATIONS
Vocational qualification certificate Campania Region as an operator cad-Autocad-ArchiCAD-15.0;
Training on safety in the workplace (Legislative Decree 626/94, Article 10 - Decree 242/96 01.16.97DM) awarded by the Association of Architects of the Province of Caserta ;
Training course on occupational safety at temporary or mobile (D. Lgs.494/96 so as amended by
Legislative Decree 528/99) and D. Update Decree 81/2008 with the Order of Architects of the Province
of Caserta;
Training Course Module B 48 hours Macrosector Ateco 4 according to D. Lgs.195/2003 for RSPP;
Training Course Module B 12 hours Macrosector Ateco 9 according to D. Lgs.195/2003 for RSPP;
LANGUAGES
English: school level ;
2
SOFTWARE KNOWLEDGE
Knowledge of Windows 2000 and XP and its main application packages: Word and Excel ;
Knowledge of the main search engines on the Internet ;
Knowledge of CAD programs "Vector": Autocad- 2002 and 2012 and associated processing 3D
graphics ;
Knowledge of programs C.A.D. "Parametric Architectural" ArchiCAD 15.0 (reconstruction 3D drawings
2D and 3D) ;
Knowledge of package Plug-in for C.A.D. ArchiCAD 15.0 ;
ArchiTerra ( reconstruction soil ) ;
ArchiForma (realization of any object in 3D) ;
ArchiFacade (for straightening photo Facades ) ;
Knowledge of programs RENDER Artlantis Studio 4 (Views and Render photorealistic movies) ;
Knowledge of technical accounting programs such as Primus (accounting program) Certus (Security
Plans), Mantus (maintenance plans), Primus C (Specifications), Primus K (timelines work), Costus
(Costs for security) .
EXPERIENCE
THESIS -2002 June: Design of the new complex of the Second University of Naples for the Faculty of
Architecture and Engineering site in former Psychiatric Hospital Aversa (CE), Italy
3
WORK EXPERIENCE (Collaboration unsigned)
2002 Maggio : Collaboration on the project for renovation, rehabilitation and retrofitting of a building
urban-rural in via c \ da Selva Paladina BN application of law 14/05/1981 n ° 219 et seq. mod. and int ;
2003 Luglio : Collaboration Company A.Mozzillo Executive Planning for renovations inside of an
apartment located in Piazzetta Valentino Orta di Atella location Casapozzano CE Italy.
project
Realization
Realization
Realization
WORK EXPERIENCE (Directly signed )
DESCRIPTION OF THE PROJECT
DATE
COST
PRIVATE BUILDING
CLIENT:
Dott. AURIEMMA Salvatore
CASTELLO DI CISTERNA
(NA)
Definitive Project-Executive e D.L. Permesso a Costruire n°07/06
06.02.06
Lavori di Costruzione villetta unifamiliare in via Selva Trav. Via Vergara
IMPORTO AGGIORNATO AL 06/02/2006 SECONDO GLI INDICI
ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATE
SECURITY COORDINATION IN PROGRESS
CLASSE
I
Project
CATEGORIA
d
€. 385.618,00
€ 385.618,00
SI
SI
18/01/2008
IMPORTO IN €.
385.618,00
Realization
4
PRIVATE BUILDING
CLIENT:
SIG.ra FORIO Concetta
CASTELLO DI CISTERNA
(NA)
Definitive Project-Executive e D.L.
22.03.04
Lavori di Abbattimento e Ricostruzione Edificio a corte
IMPORTO AGGIORNATO AL 22/03/2004 SECONDO GLI INDICI
ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
Stato di Fatto
CATEGORY
d
€. 385.618,00
€ 385.618,00
SI
SI
05/09/2006
COST IN €.
385.618,00
Project
Realization
CLIENT:
MAGA s.r.l. Amm. CHIACCHIO Maria GRUMO NEVANO
(NA)
Definitive Project-Executive Permesso a Costruire n°06/03 Variante n°01/08
22.03.06
Lavori di Abbattimento e Ricostruzione Edificio per N° 6 unità
N° 2 Duplex e N° 4 Simplex in via Donizetti Grumo Nevano NA
IMPORTO AGGIORNATO AL 22/03/2006 SECONDO GLI INDICI
ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
Stato di Fatto
Project
CATEGORY
d
€. 705.000,00
€
SI
SI
22/02/2010
COST IN €.
705.000,00
Realization
Realization
5
CLIENT:
Fratelli TREVIGLIO Pasquale e Innocenzo
Casandrino
(NA)
Definitive Project-Executive e D.L. alle norme di legge
18.09.06
Lavori di Ristrutturazione Locale Commerciale Pavim./Rivest e Deposito
in via Napoli 186 Casandrino NA
IMPORTO AGGIORNATO AL 18/09/2006 SECONDO GLI INDICI
ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
Stato di Fatto
€ 80.518,00
SI
SI
18/04/2007
COST IN €.
CATEGORY
e
Project
€. 80.518,00
80.518,00
Project
Project
CLIENT:
ING. PECCE Vincenzo
Apice
(BN)
Definitive Project - alle norme di legge
Lavori di Progettazione N° 3 villette a schiera Comune Montesarchio BN
18.09.07
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI
ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
Project
CATEGORY
e
Project
€. 605.518,00
€
NO
NO
COST IN €.
605.518,00
Project
6
PUBLIC BUILDING
DESCRIPTION OF THE PROJECT
DATE
COST
CLIENT:
COMUNE DI grumo nevano
(NA)
Definitive Project-Executive alle norme di legge
07.12.05
Lavori di ampliamento cavalcavia Grumo-S.Arpino
IMPORTO AGGIORNATO AL 07/12/2005 SECONDO GLI INDICI
ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
IX
CATEGORY
B
€. 575.677,00
€ 575.677,00
SI
SI
COST IN €.
575.677,00
WORK EXPERIENCE (cooperation signed)
CONSULTING CO and design Preliminary-Final Executive performed in the office of Engineering and
Planning, Ing. Vincent Saviano site in vico III Victory Frattamaggiore (NA) of the following works:
PUBLIC BUILDING
DESCRIPTION OF THE PROJECT
DATE
COST
CLIENT:
COMUNE DI FRATTAMAGGIORE (NA)
BUILDING WORKS
Project-Executive alle norme di legge
Lavori di sistemazione e Pavimentazione del Piazzale di via Florinfo Ferro
30.10.04
IMPORTO AGGIORNATO AL 30/10/2004 SECONDO GLI
INDICI ISTAT
DESIGN "SIGNED"
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
CATEGORY
d
€. 304.000,00
€ 304.000,00
SI
SI
COST IN €.
304.000,00
7
WORK EXPERIENCE (collaboration and graphical representation)
P.I.P. dal 15/07/2004 al 15/05/2005 In the office of Engineering and Planning Ing.Gaetano Dell'Aversana in via
E.Chiacchio Grumo Nevano (NA) Italy and contribution to the Preliminary Design and Final Executive and 3D
representation of the following works :
PUBLIC BUILDING
DESCRIPTION OF THE PROJECT
DATE
COST
CLIENT:
COMUNE DI PIETRAROJA (BN)
BUILDING WORKS
Project-Executive alle norme di legge Lavori di sistemazione e
Pavimentazione Piazza Vittoria
IMPORTO AGGIORNATO AL 14/10/2004 SECONDO GLI
INDICI ISTAT
DESIGN
COORDINAMENTO SICUREZZA IN Progetto
14.10.04
€. 262.800,00
€ 262.800,00
Collaborazione
Collaborazione
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
Project
CATEGORY
d
Project
COST IN €.
262.800,00
Project
8
Construction museum
Preliminary design of the renovation and conversion located in Civita for
the implementation of the system of access to the Park Geopaleontologico
3.11.03
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI
INDICI ISTAT
DESIGN
€. 398.000,00
€. 415.512,00
Collaborazione
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
I
IV
VI
VII
COST IN €.
70.000,00
65.000,00
21.000,00
70.000,00
90.000,00
CATEGORY
c
g
c
b
a
Project
EDILIZIA CIMITERIALE
Progetto esecutivo di Sistemazione Cimitero Comunale completamento
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI
INDICI ISTAT
DESIGN
14.10.04
€. 40.000,00
€ 41.760,00
collaborazione e rappresentazione
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
Project
COST IN €.
26.558,14
CATEGORY
b
Project
9
DESCRIPTION OF THE PROJECT
DATE
COST
CLIENT:
COMUNE DI SAN. LUPO (BN)
BUILDING WORKS
BUILDING
SPORTS
30/06/04
Preliminary Design System Sports (palestra coperta)
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI
INDICI ISTAT
€. 516.456,90
€. 516.456,90
collaborazione
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
DESIGN
CLASS
I
III
IV
VIII
CATEGORY
c
a, b, c
c
COST IN €.
183.342,20
193.671,34
8.000,00
16.273,47
CLIENT:
COMUNE DI FAICCHIO (BN)
BUILDING WORKS
SPORTS
Executive project completion excerpt Sports Ground
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI
INDICI ISTAT
BUILDING
collaborazione e rappresentazione
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
DESIGN
CLASS
I
I
III
Project
CATEGORY
c
g
a, b, c
Project
03.03.05
€
€. 288.000,00
a
COST IN €.
121.481,33
51.531,99
30.685,98
Project
10
BUILDING AND HOSPITAL CARE
05/04/05
Project Executive Home for the Elderly 1° Lotto adeguato
RIFORMULATO
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI
INDICI ISTAT
€. 560.355,73
€
Collaborazione e Rappresentazione
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
DESIGN
CLASS
I
I
III
CATEGORY
c
g
a, b, c
Project
COST IN €.
100.681,52
187.463,31
52.716,72
Project
CLIENT:
A.S.L. BENEVENTO N°1 (Montesarchio)
BUILDING AND HOSPITAL CARE
Final design of a building to be used as the new headquarters of
Sanitary District No. 19 of the City of Montesarchio
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI
INDICI ISTAT
DESIGN
10.04
€ 1.868.399,67
Rappresentazione
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
I
III
CATEGORY
c
a, b, c
NO
COST IN €.
178.808,39
11
CLIENT :
COMUNE DI CASTEL DI SASSO
(CE)
BUILDING WORKS
BUILDING SPORTS
Preliminary project completion Sports Ground
07.04.05
€. 300.000,00
IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT
DESIGN
COLLABORAZIONE RAPPRESENTAZIONE
COORDINATION IN SAFETY DESIGN
DIRECTION OF WORK PERFORMED IN DATA
SECURITY COORDINATION IN PROGRESS
CLASS
CATEGORY
I
c
NO
COST IN €.
241.158,00
WORK EXPERIENCE (worker employee )
Open-ended contract for Construction Company AKEI s.r.l. (CECA group) from 01/10/2006 to
31/12/2010 at the head office located in Via Napoli 189 City of Casandrino (NA);
RSPP for construction company AKEI s.r.l.(CECA group) from 2008 to 2010;
Technical Manager for construction company AKEI s.r.l. (CECA group) from 2009 to 2011;
April 2010: By name I.M. s.r.l. (group CECA) Design Final restructuring No. 3 townhouses on a
site Polveriera Old Santa Maria Capua Vetere (CE) Italy;
Project
Project
May 2010: By name Conglomerates s.r.l. (group CECA) Final Design / Executive restructuring and splitting in
n° 2 units of apartment in Via Roma A.Rosmini 12th floor 3.
Project
Project
Project
I authorize the processing of my personal data in accordance with Law 196/2003.
Napoli -Italy
Dicembre 2012
IN FEDE
Arch . Giuseppe D’ERRICO
12
Scarica

ARCHITECT ITALY - Architetto Giuseppe D`errico