ARCHITECT ITALY Curricula Giuseppe D’ERRICO mail PEC Cell [email protected] [email protected] 3336306240 P.iva : 056 44 70 12 10 2013 CURRICULUM PROFESSIONAL Name and surname: Giuseppe D’Errico Place and date of birth : Napoli 28/07/1971 Location-Studio : Via Filippo Turati n° 4/Grumo Nevano (NA) Telephono: 081/8802006 (Studio); 333/6306240 (Cell.) P.iva : 056 44 70 12 10 E-mail: P.E.C. [email protected] [email protected] Marital status : Military Service : Single Completed as Civil Service STUDIES Diploma of Artistic achieved in 1988/89, at the High School State Aversa (CE) with 49/60; Year Supplementary achieved in 1989/90 ; Degree in Architecture on 01/06/2002, at the Second University of Naples with 104/110 ; Thesis: Design of the new university complex of the Second University of Naples for the Faculty of Architecture and Engineering Site former Psychiatric Hospital in Aversa (CE) Italy ; Qualified Architect with state exam University of Studies of Naples Federico II; passed in the first session in 2002 at the Registered with the Architects of Naples from 28/01/2003 with registration number 8532 ; Admitted to the CTU the Court of Naples with registration number 11023 ; TRAINING AND QUALIFICATIONS Vocational qualification certificate Campania Region as an operator cad-Autocad-ArchiCAD-15.0; Training on safety in the workplace (Legislative Decree 626/94, Article 10 - Decree 242/96 01.16.97DM) awarded by the Association of Architects of the Province of Caserta ; Training course on occupational safety at temporary or mobile (D. Lgs.494/96 so as amended by Legislative Decree 528/99) and D. Update Decree 81/2008 with the Order of Architects of the Province of Caserta; Training Course Module B 48 hours Macrosector Ateco 4 according to D. Lgs.195/2003 for RSPP; Training Course Module B 12 hours Macrosector Ateco 9 according to D. Lgs.195/2003 for RSPP; LANGUAGES English: school level ; 2 SOFTWARE KNOWLEDGE Knowledge of Windows 2000 and XP and its main application packages: Word and Excel ; Knowledge of the main search engines on the Internet ; Knowledge of CAD programs "Vector": Autocad- 2002 and 2012 and associated processing 3D graphics ; Knowledge of programs C.A.D. "Parametric Architectural" ArchiCAD 15.0 (reconstruction 3D drawings 2D and 3D) ; Knowledge of package Plug-in for C.A.D. ArchiCAD 15.0 ; ArchiTerra ( reconstruction soil ) ; ArchiForma (realization of any object in 3D) ; ArchiFacade (for straightening photo Facades ) ; Knowledge of programs RENDER Artlantis Studio 4 (Views and Render photorealistic movies) ; Knowledge of technical accounting programs such as Primus (accounting program) Certus (Security Plans), Mantus (maintenance plans), Primus C (Specifications), Primus K (timelines work), Costus (Costs for security) . EXPERIENCE THESIS -2002 June: Design of the new complex of the Second University of Naples for the Faculty of Architecture and Engineering site in former Psychiatric Hospital Aversa (CE), Italy 3 WORK EXPERIENCE (Collaboration unsigned) 2002 Maggio : Collaboration on the project for renovation, rehabilitation and retrofitting of a building urban-rural in via c \ da Selva Paladina BN application of law 14/05/1981 n ° 219 et seq. mod. and int ; 2003 Luglio : Collaboration Company A.Mozzillo Executive Planning for renovations inside of an apartment located in Piazzetta Valentino Orta di Atella location Casapozzano CE Italy. project Realization Realization Realization WORK EXPERIENCE (Directly signed ) DESCRIPTION OF THE PROJECT DATE COST PRIVATE BUILDING CLIENT: Dott. AURIEMMA Salvatore CASTELLO DI CISTERNA (NA) Definitive Project-Executive e D.L. Permesso a Costruire n°07/06 06.02.06 Lavori di Costruzione villetta unifamiliare in via Selva Trav. Via Vergara IMPORTO AGGIORNATO AL 06/02/2006 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATE SECURITY COORDINATION IN PROGRESS CLASSE I Project CATEGORIA d €. 385.618,00 € 385.618,00 SI SI 18/01/2008 IMPORTO IN €. 385.618,00 Realization 4 PRIVATE BUILDING CLIENT: SIG.ra FORIO Concetta CASTELLO DI CISTERNA (NA) Definitive Project-Executive e D.L. 22.03.04 Lavori di Abbattimento e Ricostruzione Edificio a corte IMPORTO AGGIORNATO AL 22/03/2004 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I Stato di Fatto CATEGORY d €. 385.618,00 € 385.618,00 SI SI 05/09/2006 COST IN €. 385.618,00 Project Realization CLIENT: MAGA s.r.l. Amm. CHIACCHIO Maria GRUMO NEVANO (NA) Definitive Project-Executive Permesso a Costruire n°06/03 Variante n°01/08 22.03.06 Lavori di Abbattimento e Ricostruzione Edificio per N° 6 unità N° 2 Duplex e N° 4 Simplex in via Donizetti Grumo Nevano NA IMPORTO AGGIORNATO AL 22/03/2006 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I Stato di Fatto Project CATEGORY d €. 705.000,00 € SI SI 22/02/2010 COST IN €. 705.000,00 Realization Realization 5 CLIENT: Fratelli TREVIGLIO Pasquale e Innocenzo Casandrino (NA) Definitive Project-Executive e D.L. alle norme di legge 18.09.06 Lavori di Ristrutturazione Locale Commerciale Pavim./Rivest e Deposito in via Napoli 186 Casandrino NA IMPORTO AGGIORNATO AL 18/09/2006 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I Stato di Fatto € 80.518,00 SI SI 18/04/2007 COST IN €. CATEGORY e Project €. 80.518,00 80.518,00 Project Project CLIENT: ING. PECCE Vincenzo Apice (BN) Definitive Project - alle norme di legge Lavori di Progettazione N° 3 villette a schiera Comune Montesarchio BN 18.09.07 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I Project CATEGORY e Project €. 605.518,00 € NO NO COST IN €. 605.518,00 Project 6 PUBLIC BUILDING DESCRIPTION OF THE PROJECT DATE COST CLIENT: COMUNE DI grumo nevano (NA) Definitive Project-Executive alle norme di legge 07.12.05 Lavori di ampliamento cavalcavia Grumo-S.Arpino IMPORTO AGGIORNATO AL 07/12/2005 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS IX CATEGORY B €. 575.677,00 € 575.677,00 SI SI COST IN €. 575.677,00 WORK EXPERIENCE (cooperation signed) CONSULTING CO and design Preliminary-Final Executive performed in the office of Engineering and Planning, Ing. Vincent Saviano site in vico III Victory Frattamaggiore (NA) of the following works: PUBLIC BUILDING DESCRIPTION OF THE PROJECT DATE COST CLIENT: COMUNE DI FRATTAMAGGIORE (NA) BUILDING WORKS Project-Executive alle norme di legge Lavori di sistemazione e Pavimentazione del Piazzale di via Florinfo Ferro 30.10.04 IMPORTO AGGIORNATO AL 30/10/2004 SECONDO GLI INDICI ISTAT DESIGN "SIGNED" COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I CATEGORY d €. 304.000,00 € 304.000,00 SI SI COST IN €. 304.000,00 7 WORK EXPERIENCE (collaboration and graphical representation) P.I.P. dal 15/07/2004 al 15/05/2005 In the office of Engineering and Planning Ing.Gaetano Dell'Aversana in via E.Chiacchio Grumo Nevano (NA) Italy and contribution to the Preliminary Design and Final Executive and 3D representation of the following works : PUBLIC BUILDING DESCRIPTION OF THE PROJECT DATE COST CLIENT: COMUNE DI PIETRAROJA (BN) BUILDING WORKS Project-Executive alle norme di legge Lavori di sistemazione e Pavimentazione Piazza Vittoria IMPORTO AGGIORNATO AL 14/10/2004 SECONDO GLI INDICI ISTAT DESIGN COORDINAMENTO SICUREZZA IN Progetto 14.10.04 €. 262.800,00 € 262.800,00 Collaborazione Collaborazione DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I Project CATEGORY d Project COST IN €. 262.800,00 Project 8 Construction museum Preliminary design of the renovation and conversion located in Civita for the implementation of the system of access to the Park Geopaleontologico 3.11.03 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT DESIGN €. 398.000,00 €. 415.512,00 Collaborazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I I IV VI VII COST IN €. 70.000,00 65.000,00 21.000,00 70.000,00 90.000,00 CATEGORY c g c b a Project EDILIZIA CIMITERIALE Progetto esecutivo di Sistemazione Cimitero Comunale completamento IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT DESIGN 14.10.04 €. 40.000,00 € 41.760,00 collaborazione e rappresentazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I Project COST IN €. 26.558,14 CATEGORY b Project 9 DESCRIPTION OF THE PROJECT DATE COST CLIENT: COMUNE DI SAN. LUPO (BN) BUILDING WORKS BUILDING SPORTS 30/06/04 Preliminary Design System Sports (palestra coperta) IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT €. 516.456,90 €. 516.456,90 collaborazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS DESIGN CLASS I III IV VIII CATEGORY c a, b, c c COST IN €. 183.342,20 193.671,34 8.000,00 16.273,47 CLIENT: COMUNE DI FAICCHIO (BN) BUILDING WORKS SPORTS Executive project completion excerpt Sports Ground IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT BUILDING collaborazione e rappresentazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS DESIGN CLASS I I III Project CATEGORY c g a, b, c Project 03.03.05 € €. 288.000,00 a COST IN €. 121.481,33 51.531,99 30.685,98 Project 10 BUILDING AND HOSPITAL CARE 05/04/05 Project Executive Home for the Elderly 1° Lotto adeguato RIFORMULATO IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT €. 560.355,73 € Collaborazione e Rappresentazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS DESIGN CLASS I I III CATEGORY c g a, b, c Project COST IN €. 100.681,52 187.463,31 52.716,72 Project CLIENT: A.S.L. BENEVENTO N°1 (Montesarchio) BUILDING AND HOSPITAL CARE Final design of a building to be used as the new headquarters of Sanitary District No. 19 of the City of Montesarchio IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT DESIGN 10.04 € 1.868.399,67 Rappresentazione COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS I III CATEGORY c a, b, c NO COST IN €. 178.808,39 11 CLIENT : COMUNE DI CASTEL DI SASSO (CE) BUILDING WORKS BUILDING SPORTS Preliminary project completion Sports Ground 07.04.05 €. 300.000,00 IMPORTO AGGIORNATO AL 30/06/2004 SECONDO GLI INDICI ISTAT DESIGN COLLABORAZIONE RAPPRESENTAZIONE COORDINATION IN SAFETY DESIGN DIRECTION OF WORK PERFORMED IN DATA SECURITY COORDINATION IN PROGRESS CLASS CATEGORY I c NO COST IN €. 241.158,00 WORK EXPERIENCE (worker employee ) Open-ended contract for Construction Company AKEI s.r.l. (CECA group) from 01/10/2006 to 31/12/2010 at the head office located in Via Napoli 189 City of Casandrino (NA); RSPP for construction company AKEI s.r.l.(CECA group) from 2008 to 2010; Technical Manager for construction company AKEI s.r.l. (CECA group) from 2009 to 2011; April 2010: By name I.M. s.r.l. (group CECA) Design Final restructuring No. 3 townhouses on a site Polveriera Old Santa Maria Capua Vetere (CE) Italy; Project Project May 2010: By name Conglomerates s.r.l. (group CECA) Final Design / Executive restructuring and splitting in n° 2 units of apartment in Via Roma A.Rosmini 12th floor 3. Project Project Project I authorize the processing of my personal data in accordance with Law 196/2003. Napoli -Italy Dicembre 2012 IN FEDE Arch . Giuseppe D’ERRICO 12