Integrazione Studio di compatibilità idraulica ai sensi delle norme di attuazione PAI art. 24 e art. 27 comma 3 lettera i e seguenti. Interventi di edilizia cimiteriale 1 INDICE 1 PREMESSA .............................................................................................................................................. 3 1.1 NORME DI ATTUAZIONE ....................................................................................................................... 3 1.2 LIVELLO DI DETTAGLIO DELLO STUDIO DI COMPATIBILITÀ IDRAULICA........................................................ 4 1.3 IN SINTESI. ......................................................................................................................................... 4 2 DELLE OPERE IN PROGETTO E DELLE NORME DI ATTUAZIONE DEL PAI.................................... 6 2.1 PROGETTO PRELIMINARE .................................................................................................................... 6 2.1.1 Descrizione opere.................................................................................................................... 6 2.1.2 Norme di attuazione ................................................................................................................ 7 2.2 PROGETTO DEFINITIVO ESECUTIVO ...................................................................................................... 9 2.3 CONSIDERAZIONI IN BASE AL PSFF VIGENTE ...................................................................................... 10 3 ANALISI IDROLOGICA ED IDRAULICA............................................................................................... 11 3.1 ANALISI IDROLOGICA ......................................................................................................................... 11 3.2 ANALISI IDRAULICA ............................................................................................................................ 12 4 UTILIZZO DEI DATI DI CUI ALL’ANALISI IDROLOGICA ED IDRAULICA......................................... 13 4.1 PREMESSA ....................................................................................................................................... 13 4.2 SOPRAELEVAZIONE ........................................................................................................................... 13 4.3 RESISTENZA DELLE STRUTTURE......................................................................................................... 14 4.4 RILEVANZA DEI DATI DI CUI ALL’ANALISI IDROLOGICA ED IDRAULICA ...................................................... 14 5 COMPATIBILITÀ.................................................................................................................................... 15 6 SINTESI IN MERITO ALLE INTEGRAZIONI RICHIESTE..................................................................... 19 2 1 Premessa Facendo seguito alla richiesta di integrazioni allo studio di compatibilità predisposto, con la presente si intende dare risposta ai rilievi emersi in sede di istruttoria dello studio all’uopo predisposto. Poiché lo studio predisposto è stato basato sull’analisi del progetto preliminare si ritiene fornire chiarimenti in merito alla predisposizione della relazione di compatibilità già predisposta verificare se il progetto definitivo-esecutivo introduca modifiche che comportino variazioni alle conclusioni e alle analisi già svolte. 1.1 Norme di Attuazione Nel seguito si farà riferimento alle Norme di Attuazione (N.A.) del Piano per l’Assetto idrogeologico (PAI) vigenti come integrate a seguito della L.R. 33 del 15/12/2014 e della deliberazione 52/13 del 23/12/2014. Lo studio di compatibilità consegnato a suo tempo ai fini della definizione delle opere di Edilizia Cimiteriale Commissionato dal Comune di Las Plassas è stato redatto in conformità alle N.A. del PAI e nel rispetto dell’allegato E. In base all’allegato E delle N.A. del PAI lo scopo di uno studio di compatibilità idraulica è “dimostrare la coerenza con le finalità indicate nell’articolo 23, comma 6, e nell’articolo 24 delle norme di attuazione del PAI e in particolare che l’intervento sottoposto all’approvazione è stato progettato rispettando il vincolo di non aumentare il livello di pericolosità e di rischio esistente - fatto salvo quello eventuale intrinsecamente connesso all’intervento ammissibile - e di non precludere la possibilità di eliminare o ridurre le condizioni di pericolosità e rischio” In base alll’art. 23 comma 6 delle N.A. del PAI “lo studio è presentato a cura del soggetto proponente, unitamente al progetto preliminare redatto con i contenuti previsti dal DPR 21.12.1999, n. 554 e s.m.i., ed approvato dall’Assessorato Regionale ai Lavori Pubblici prima del provvedimento di assenso al progetto, tenuto conto dei principi di cui al comma 9” Di conseguenza lo studio di compatibilità idraulica è stato redatto in base al progetto preliminare che ne costituisce parte integrante. Nello studio già predisposto la descrizione delle opere in progetto, contenuta negli elaborati di progetto preliminare, è stata definita riportando gli stralci delle Tav 01 e Tav 02 del preliminare. Si ritiene che la valenza di tale studio rimanga inalterata anche ove esso venga presentato contestualmente al progetto definitivo-esecutivo. 3 A seguito di un incontro avvenuto presso l’ADIS in data 23/09/2015 si evidenzia che il PSFF non è stato ancora approvato in modo definitivo non avendo ancora completato l’intero suo iter in ambito regionale; che le Norme di attuazione sono da rivalutarsi ai sensi della direttiva alluvioni, secondo gli indirizzi seguiti nella Piano di gestione delle Alluvioni di recente definizione, per cui si avranno tre aree a pericolosità P1, P2, P3 in luogo delle aree Hi1, Hi2+Hi3, e Hi4 che del PSFF esiste un ulteriore approfondimento inerente i maggiori corpi idrici (e sarebbe la terza revisione del Flumini Mannu) redatta dall’Universià degli Studi di Cagliari. 1.2 Livello di dettaglio dello studio di compatibilità idraulica. Il livello di dettaglio che caratterizza lo studio PAI e del PSFF, ovvero di uno studio di compatibilità redatto ai sensi delle N.A. del PAI, non è quello di un progetto definitivo – esecutivo: a dimostrazione si pensi ai contenuti richiesti dal DPCM del 29/09/1998, al fatto che il PAI-PSFF Sardegna è stato redatto su cartografia alla scala 1:10000 o ad un DTM non standardizzato. È inoltre significativo il fatto che per lo studio in oggetto non si è potuto disporre del DTM “ufficiale” su cui si basa il PSFF: i professionisti dell’ADIS hanno ritenuto non fornirlo in quanto di proprietà del Ministero dell’Ambiente, ed esso non è in possesso dell’amministrazione comunale. Qualunque indicazione riportata nello studio di compatibilità idraulica ai sensi delle N.A. del PAI integra preliminarmente, ma non sostituisce e assevera, gli elaborati e i calcoli previsti dal DPR 21.12.1999, n. 554 e s.m.i, nella fase di progettazione, qualunque essa sia. 1.3 In sintesi. Riassumendo quanto detto, nel caso in oggetto, lo studio di compatibilità è stato redatto in conformità alle N.A. del PAI, in base al progetto preliminare con un livello di dettaglio di cui al PAI, in assenza del progetto definitivo-esecutivo; viste le richieste di integrazione, tenuto conto di quanto espresso in precedenza e della necessità di rispettare le N.A. del PAI, lo scopo della presente relazione integrativa è quello di esprimere alcuni chiarimenti e contestualmente verificare solamente se il progetto definitivo esecutivo introduce categotrie di opere diverse da quelle previste nel progetto preliminare, senza entrare in merito alle scelte progettuali fatte in fase definitiva-esecutiva o al fatto che tale progetto sia o non sia da validare; si evidenzia l’art. 4 comma 13 delle N.A. del PAI in base al quale “L’eventuale assenso alla realizzazione delle opere, da parte dell’Autorità Idraulica non equivale a dichiarazione di messa in sicurezza e pertanto eventuali oneri dovuti a danni, alle opere realizzate, per effetto del dissesto idrogeologico o in occasione di fenomeni alluvionali o gravitativi restano in capo al proprietario delle opere o all’avente titolo che ne assume la piena responsabilità”; 4 viste le integrazione richieste in merito alle portate, si evidenzia il PSFF costituisce documento di rilevante utilità e importanza, i cui dati vanno verificati con diligenza prima di essere utilizzati. Da tali dati si può prescindere ove essi siano risultato di approssimazioni od errori oggettivi, immediatamente individuabili. 5 2 Delle opere in progetto e delle Norme di Attuazione del PAI 2.1 Progetto preliminare 2.1.1 Descrizione opere La descrizione dettagliata delle opere è riportata nei seguenti documenti di progetto preliminare: Tav 01 Stralcio PUC vista aerea Tav 02 Planimetria generale Cimitero Tav 03 Identificazione interventi – cimitero storico Tav 04 Identificazione interventi – cimitero in ampliamento Tav 05 Planimetrie e sezioni - corpi di fabbrica 1 e 2 Tav 06 Planimetrie e sezioni - corpi di fabbrica 3 e 4 Tav 07 Planimetria impianto fognario e rete idrica Ai fini dell’applicazione delle N.A. del PAI relazione di compatibilità idraulica le categorie di opere sono state indicate come segue: A) adeguamento del cimitero storico B) nel completamento dell’ampliamento con la realizzazione di quattro corpi di fabbrica contenenti i loculi e gli ambienti per l’esercizio delle attività, C) nell’adeguamento della viabilità esterna (sistemazione viabilità esistente e parcheggi con nuovo accesso al cimitero) D) nell’adeguamento degli impianti tecnologici (rete idrica, fognaria, elettrica) Nello studio di compatibilità idraulica le suddette opere sono state valutate nel loro insieme in quanto risultano funzionali alla realizzazione e alla fruizione di un più ampio impianto cimiteriale, secondo il contesto definito dalle leggi nazionali e regionali in materia di pianificazione cimiteriale tra cui il regolamento di polizia mortuaria espresso con D.P.R. 10 settembre 1990 n. 285 e la nota dell’Assessorato dell’Igiene e Sanità della Regione Sardegna in materia di Igiene e pianificazione dell'edilizia cimiteriale. I due riferimenti normativi di un’ampia letteratura sono citati come esempio del fatto che il termine “Edilizia Cimiteriale” è utilizzato in un contesto che mira a pianificare non solo le opere di edilizia ma tutte le attività che è possibile si svolgano sia nell’area cimiteriale interna alla cinta muraria, che nell’area di pertinenza (che va da un minimo di 50 m a un massimo di 300 m dalla cinta muraria), compreso la viabilità essendo necessario realizzare un impianto che sia conforme alle norme igienico sanitarie e di sicurezza, sia fruibile e tale da non mettere a rischio la pubblica incolumità . Pertanto le opere di cui alle lettere precedenti A) B) C) D) sono state considerate tutte ricompresse nel termine generico di “Edilizia Cimiteriale” usato fra l’altro nelle N.A. del PAI. 6 2.1.2 Norme di attuazione Come risulta dall’immagine sotto in cui si confronta lo stato di fatto con quello di progetto ricavato dal progetto preliminare, e come detto, le opere in progetto consistono A) nell’adeguamento del cimitero storico B) nel completamento dell’ampliamento con la realizzazione di quattro corpi di fabbrica contenenti i loculi e gli ambienti per l’esercizio delle attività, C) nell’adeguamento della viabilità esterna (sistemazione viabilità esistente e parcheggi con nuovo accesso al cimitero) D) nell’adeguamento degli impianti tecnologici (rete idrica, fognaria, elettrica) Essendo il PAI strumento di pianificazione si è ritienuto corretto e cautelativo valutare nel loro complesso le opere di progetto in quanto vanno a definire un nuovo impianto cimiteriale in parte diverso dal precedente. Pertanto le opere di cui alla lettera A) B) C) in area Hi4, in quanto interventi funzionali alla definizione di un unico impianto cimiteriale , sono state ritenute ammissibili ai sensi dell’art. 27 comma 3 lettera i ; D) in area Hi2 o minore sono ammissibili e non soggette a studio di compatibilità idraulica; A) B) C) D) sono tali da non modificare i parametri idrologici e idraulici utilizzati nella simulazione idraulica come effettuata nel PSFF, e dunque non determinano un alterazione dello stato di pericolosità rispetto alla situazione attuale; 7 Se invece di valutare l’impianto cimiteriale nella sua interezza, si valutassero le categorie di opere singolarmente, sarebbe possibile fare le seguenti associazioni tra opere di cui al precedente elenco e N.A. del PAI: A) (opere sul cimitero storico) in area Hi4 sono ammissibili ai sensi dell’art. 27 comma 2 lettera d, comma 3 lettera b) e non soggette a studio di compatibilità idraulica B) (ampliamento cimitero) in area Hi4 sono ammissibili ai sensi dell’art. 27 comma 3 lettera i ; B) (impianti tecnologici e di depurazione ) in area Hi4 sono ammissibili ai sensi dell’art. 27 comma 2 lettera f e non soggetti a studio di compatibilità idraulica; C) (sistemazione viabilità esistente posta al lato del cimitero esterna all’area di cinta) in area Hi4 è ammissibile in quanto rientrano tra quelle previste nell’art. 27 comma 3 lettera b e non soggetto a studio di compatibilità idraulica; C) (parcheggi e viabilità con nuovo accesso) si tratta di nuove opere esterne all’area di cinta che risultano in area Hi2: in quanto siti nella pertinenza dell’area cimiteriale risultano ammissibili ai sensi dell’art. 29 comma 2 lettera g. Inoltre sempre se trattate singolarmente, viste le normative in materia di edilizia cimiteriale, troverebbe attuazione l’art. 27 comma 3 lettera g. D) (impianti tecnologici) esterne all’area di cinta e in area Hi2 o minori sono ammissibili e non soggette a studio di compatibilità idraulica. Si noti che solo le opere in ampliamento B) e C) sarebbero soggette a studio di compatibilità idraulica. Per quanto riguarda le opere di cui al punto C) l’esito dello studio di compatibilità non incide sulla possibilità di realizzare “parcheggi e viabilità con nuovo accesso” sia perché tali opere non sono delocalizzabili sia perché non comportano realizzazione di strutture che alterano il deflusso. punto B) si osserva che l’area cimiteriale è delimitata da un muro di cinta, e che è questo a condizionare il deflusso a prescindere dall’entità delle opere realizzate internamente; Dunque si può affermare che le opere in oggetto sono tali da non modificare i parametri idrologici e idraulici utilizzati nella simulazione idraulica come effettuata nel PSFF, e dunque non determinano un alterazione dello stato di pericolosità rispetto alla situazione attuale. Per quanto riguarda gli impianti tecnologici, si evidenzia inoltre che viene prevista la realizzazione di un impianto di depurazione. Poichè un impianto cimiteriale deve essere adeguato alle norme vigenti in materia di Igiene e Sicurezza, in mancanza di altre soluzioni, la realizzazione di un impianto di depurazione rientra nell’ambito dell’attuazione dell’art. 27 comma 3 lettera i se si considera l’impianto cimiteriale nel suo insieme e dell’art. 27 comma 2 lettera f se preso in esame singolarmente. Si noti ancora che l’impianto di depurazione in progetto è equivalente a quelli ammissibili per i privati ai sensi dell’art 27 comma 2 lettera i; che l’impianto cimiteriale si trova in un area marginale ai sensi delle line guida ISPRA in materia di pericolosità dalle alluvioni. 8 2.2 Progetto definitivo esecutivo Il progetto definitivo esecutivo non risulta contenere categorie di opere differenti rispetto a quelle previste nel progetto preliminare. Il progetto definitivo esecutivo è costituito dai seguenti elaborati R1 Relazione Generale R2 Relazione Legge 13/89 R3 Relazione Autorizzazione allo scarico R4 Relazione Paesaggistica R5 Relazione Compatibilità Idraulica R6 Relazione Geologica, Idrologica e Geotecnica R7 Documentazione Fotografica Tavole Dalla numero 1 alla numero 11 Le Tavole Grafico progettuali del progetto del progetto preliminare e del Definitivo-Esecutivo (Tav. 2) riportano le quote di: asse SS 197, della recinzione dell’ingresso cimitero (esistente); interna all’area della recinzione a confine con il cimitero in ampliamento; area cimitero in ampliamento (interne e di confine con il cimitero esistente). Si evidenzia inoltre che dai rilievi topografici effettuati emerge come la quote del terreno dello stato di fatto del cimitero in ampliamento risultano mediamente a +0,95 metri rispetto alle attuali quote della recinzione del cimitero esistente. la tavola 2 evidenzia come la quota attuale del cimitero in ampliamento sia posta a +0,40 m rispetto alla quota attuale del cimitero esistente in corrispondenza del muro di confine. La tavola 6 del progetto definitivo esecutivo, riporta inoltre le quote di sistemazione del cimitero in ampliamento che rispetto alle quote attuali risultano poste a +0,60 metri e pertanto la differenza di quota del cimitero in ampliamento rispetto allo stato attuale risultano essere mediamente a +1,00 metri. 9 2.3 Considerazioni in base al PSFF vigente Nel complesso si ritiene più corretto e cautelativo considerare le opere nel loro insieme come destinate a realizzare un nuovo impianto cimiteriale adeguato alle norme in materia di abbattimento delle barriere architettoniche, di sicurezza e di igiene e pianificazione dell’edilizia cimiteriale. Si noti inoltre che la realizzazione del nuovo accesso in area Hi2 (l’accesso attuale è in area Hi4) e della viabilità conseguente migliora la tutela della pubblica incolumità sia sotto il profilo della vulnerabilità idraulica (vedi anche art. 27 comma 2 lettera e) sia sotto il profilo della sicurezza stradale. Si ritiene, nel caso di specie, opportuno valutare il complesso di opere ammissibili tutte ai sensi dell’art. 27 comma 3 lettera i., diversamente significherebbe realizzare un impianto cimiteriale non completo, non funzionale e non adeguato alle norme di igiene e sicurezza. Le opere in progetto non modificano i parametri idrologici e idraulici definiti come da linee guida del PAI e del PSFF. Pertanto la simulazione idraulica condotta secondo le metodologie di cui al PSFF e al PAI non è soggetta a modifiche a seguito della realizzazione delle opere in oggetto. Pertanto le opere sono coerenti con le finalità indicate nell’articolo 23, comma 6, e nell’articolo 24 delle norme di attuazione del PAI e l’intervento sottoposto all’approvazione è stato progettato rispettando il vincolo di non aumentare il livello di pericolosità e di rischio esistente - fatto salvo quello eventuale intrinsecamente connesso all’intervento ammissibile - e di non precludere la possibilità di eliminare o ridurre le condizioni di pericolosità e rischio. Le opere sono da considerarsi ammissibili ai sensi delle N.A. del PAI, sulla base delle aree perimetrate nel PSFF vigente e senza che occorra realizzare interventi di mitigazione del rischio. 10 3 Analisi idrologica ed idraulica già presentata Sulla base di quanto detto, non essendo in discussione la compatibilità dell’opera, scopo dell’analisi idrologica e idraulica è unicamente quello di fornire al tecnico progettista indicazioni sul tirante idrico e velocità in corrispondenza dell’area cimiteriale. 3.1 Analisi idrologica Gli uffici dell’ADIS a loro tempo contattati non hanno messo a disposizione niente altro che quanto pubblicato presso il sito internete della RAS e in particolare non hanno fornito il DTM e le linee spartiacque. Pertanto preliminarmente si è proceduto alla verifica delle risultanze dell’analisi idrologica e delle portate eseguita nel PSFF col metodo TCEV diretto. Da tali risultanze è emerso che, utilizzando esclusivamente i parametri del caso riportati nel PSFF, esiste discrepanza fra i valori delle portate ottenibili in base alla formula TCEV diretta proposta come da linee guida e i valori di portata pubblicati nel medesimo PSFF: questo porta alla apresenza di un errore tecnico presente nel PSFF. Poiché le portate ricavate in coerenza con le formule della TCEV diretta assumono valori progressivamente minori all’aumentare del tempo di ritorno sono state provvisoriamente prese in esame le portate del PSFF seguenti. C1) PSFF: portate laminate utilizzate nella simulazione idraulica I L M S 211,3 239,7 265,9 2 58 66 74 50 457 518 573 100 557 630 697 200 655 741 820 500 784 888 988 Tr (anni) portate (mc/sec) In conclusione nello studio di compatibilità idraulica sono state utilizzate le risultanze dell’analisi idrologica del PSFF previa verifica della presenza di un eventuale errore tecnico che si è mantenuto per ragioni di cautela. Come richiesto dalle N.A. del PAI è stata scelta una sezione di controllo in modo da rispettare le caratteristiche della rete idrografica: posta nella sezione del Rio Flumini Mannu immediatamente a monte della confluenza col rio Pardu, ed escludendo gli affluenti che non possono inondare il cimitero. Ricavando dalla tabella C1 il coefficiente udometrico utilizzato nel PSFF sono stati utilizzati i seguenti valori di portata 11 E) Portate ricavate dal PSFF e utilizzate nel presente studio tratto 1 2 3 1 2 3 S 215,05 237,86 256,89 2 59,03 65,49 71,49 50 465,11 514,02 553,58 100 566,89 625,16 673,38 200 666,62 735,31 792,21 500 797,91 881,18 954,52 Tr (anni) portate (mc/sec) da monte fino al rio Linarbu dal rio Linarbu al rio Pardu dal rio Pardu a valle Tale comportamento assunto in sede di predisposizione dello studio è corretto sotto il profilo tecnico e delle N.A. del PAI: ai punti di confluenza della rete idrografica corrispondono sezioni di controllo; gli affluenti a valle della prima sezione di controllo non possono inondare l’area cimiteriale; Rispetto al PSFF è stato preso in considerazione la presenza degli affluenti, tuttavia nel cimitero tale scelta ha portato a prendere in esame portate minori come è giusto che sia rispetto a quelle utilizzate nel PSFF corrispondenti al bacino M di maggiori dimensioni. Lo studio di compatibilità idraulica predisposta non ha preso in considerazione le sezioni presenti nel PSFF o nel PAI in quanto non risulta previsto da norma che nello studio il tecnico sia vincolato alle sezioni presenti nel PSFF o nel PAI, tanto più quando non costituiscono sezione di controllo. 3.2 Analisi idraulica L’analisi idraulica è stata condotta nel rispetto delle N.A. del PAI, e per quanto detto in precedenza utilizzando le risultanze dello studio idrologico e idraulico di cui al PSFF riferite alla sezione di controllo in esame. Nel complesso le aree perimetrate ricavate sono molto prossime a quelle del PSFF. I tiranti idrici sono quelli di cui alla sezione rappresentativa 1589 Sezione 1589 in mezzeria: velocità e quota del pelo libero Tr Q Quota pelo libero Quota statale 197 Quota min. area cimiteriale Velocità nell’alveo Velocità presso il cimitero anni mc/sec m s.l.m. m s.l.m. m s.l.m. m/sec m/sec 50 514.02 144.24 144.10 143.87 2.66 1.16 100 625.16 144.37 144.10 143.87 2.75 1.29 200 735.31 144.50 144.10 143.87 2.83 1.34 500 881.18 144.66 144.10 143.87 2.87 1.41 12 4 Utilizzo dei dati di cui all’analisi idrologica ed idraulica già presentata 4.1 Premessa Qunato riportato nei seguenti paragrafi serve a chiarire che sono stati presi in esame strategie, valutazioni al fine di ridurre se del caso la vulnerabilità delle strutture in oggetto. Esse non costituiscono prescrizioni dalle N.A. del PAI dove la vulnerabilità è posta pari a 1 e dunque non viene riconosciuta la diminuzione del rischio conseguente alla diminuzione della vulnerabilità. Infatti le N.A. del PAI sono state realizzate sulla base di una normativa italiana in cui la pericolosità idraulica è definita in relazione alle inondazioni generate dalla rete idrografica e la strategia consiste solo nel prottegersi dalle inondazioni. Tale normativa non è stata aggiornata a seguito della direttiva europea sulle alluvioni 2007/60/CE. Con la direttiva europea 2007/60 CE viene ampliata la definizione di pericolosità idraulica fino a comprendere anche gli allagamenti dovuti al ruscellamento superficiale. Contemporaneamente tale norma introduce una strategia, non più fondata sulla necessità di realizzare opere al fine di proteggersi dalle piene, ma sulla necessità di gestire il rischio. In base a tale direttiva e a differenza delle norme di cui al PAI : la protezione assoluta (rischio nullo) non è raggiungibile né sostenibile da un punto divisa tecnico ed economico per conseguire il rischio accettabile occorre operare sia sulla pericolosità che sulla vulnerabilità la mitigazione del rischio può essere raggiunta mediante un insieme di provvedimenti improntati alla prevenzione in primo luogo, e altrimenti alla convivenza col rischio che impone provvedimenti improntati alla protezione e allo sviluppo della capacità di affrontare e superare le emergenze conseguenti. 4.2 Sopraelevazione La sopraelevazione del piano di posa del cimitero previsto in ampliamento e già perimetrato,come detto in precedenza, risulta essere di metri 0,60 rispetto al piano attuale in corrispondenza del cimitero esistente (rif. Tavola 2 e Tavola 6 progetto definitivo-esecutivo). Tale sopraelevazione non è una prescrizione richiesta dalle norme di attuazione del PAI nel caso in esame in quanto ricorre esclusivamente in merito alla fattispecie di cui all’art. 28 comma 2,3,4 in area Hi3 non rilevata in area cimiteriale, ma è stata considerata quanto meno opportuna e cautelativa al fine di evitare allagamenti nella parte in ampliamento da attuare. Si rileva altresì che l’area cimiteriale è stata trattata ai sensi dell’art. 27 come se si trovasse interamente in area Hi4, solo alcune opere di urbanizzazione (parcheggi e impianti tecnologici) si trovano in area Hi2 o meno. 13 Poiché non richiesta dalle N.A. del PAI, in area Hi4, qualsiasi sopraelevazione, comunque valutata dal progettista, rappresenta una scelta cautelativa che dovrebbe contribuire a rendere gli edifici meno vulnerabili agli effetti di un eventuale allagamento meglio ancora se tale sopraelevazione corrisponde ai tiranti idrici rilevati per tempi di ritorno di 500 anni. 4.3 Resistenza delle strutture Nello studio di compatibilità idraulica è stato redatto un paragrafo concernente le “Sollecitazioni ed effetti indotti dall’inondazione sulle strutture” in cui è stato definito uno schema al fine di stimare le sollecitazioni che possono gravare sugli edifici facendo riferimento alla situazione più gravosa che si ritiene essere rappresentata dall’iterazione con il muro di cinta. Questo al fine di richiamare l’attenzione sull’opportunità se del caso di verificare lo stato di manutenzione strutture esistenti, la capacità anche delle nuove strutture di resistere alle sollecitazioni. 4.4 Rilevanza dei dati di cui all’analisi idrologica ed idraulica Come si nota l’uso dei dati di cui all’analisi idraulica ed idrologica non è finalizzata alla definizione di opere di mitigazione del rischio, o di prescrizione dovute alla N.A. del PAI. Le opere in oggetto sono comunque ammissibili a prescindere dai tiranti idrici o dal fatto che il progettista e il committente ritengano di attuare o meno quanto espresso nei precedenti due paragrafi. 14 5 5.1 Verifica idraulica con le portate di cui al PSFF Generalità Per quanto concerne la richiesta di utilizzare le portate di cui al PSFF, si ricorda che: non è comunque riproducibile il risultato del PSFF se non altro perché la stessa ADIS non ha fornito al momento il DTM come elaborato ai fini del PSFF; il PSFF è al momento approvato in via preliminare e non definitiva; non sorge alcun obbligo di attenersi alle portate contenute nel PSFF ove si contestino meri errori di valutazione e di calcolo; la RAS ha commissionato un ulteriore studio dei corpi idrici maggiori di cui al PSFF redatto in 2D e in maggior dettaglio che potrebbe aver risolto le discrepanze rilevate a proposito del Fluminimannu a Las Plassas, in merito all’analisi idrologica e idraulica contenuta nel PSFF adottato preliminarmente; L’uso di tali portate comporterebbe riprendere pedissequamente i contenute del PSFF anche quando errati. Ad esempio si noti che in contrasto con la normale diligenza e con il capitolato d’oneri redatto dalla RAS a base della redazione del PSFF, nel PSFF è proposto un modello idraulico avulso dalla realtà dove vengano ignorati i punti di singolarità della rete idrografica che di conseguenza a) non risulta suddivisa in tronchi critici omogenei che tengano conto della presenza degli affluenti; b) introduce aree scolanti non adeguate, tali da far defluire a Las Plassas deflussi che caratterizzano il territorio di Villamar; c) viene definito un incremento di portate non plausibile nella sezione posta immediatamente a valle del cimitero invece che in corrispondenza del punto di singolarità d) individua sezioni poste perpendicolarmente alla direzione dell’alveo inciso e non del deflusso descrivendo situazione altra rispetto a quella necessaria per l’uso del software Hec Ras; Si ripete l’analisi idraulica nell’ipotesi di riportare i punti a) b) c) precedenti. Le sezioni saranno tracciate perpendicolarmente alla linee di deflusso. 5.2 Ipotesi Le portate sono quelle di cui alla tabella C1) C1) PSFF: portate laminate utilizzate nella simulazione idraulica I L M S 211,3 239,7 265,9 2 58 66 74 50 457 518 573 100 557 630 697 200 655 741 820 500 784 888 988 Tr (anni) portate (mc/sec) 15 Per quanto concerne l’area cimiteriale, essa posta ai margini dell’area inondabile dal Fluminimannu sarà soggetta ad un fenomeno di allagamento caratterizzata da valori di velocità limitati o nulli. L’effetto delle strutture determina un ostacolo al deflusso e all’interno della cinta muraria verrà racchiusa una massa d’acqua che non partecipa comunque al deflusso: ad es. nell’analisi idraulica tipo 2D (bidimensionale) di un area urbana le aree interne alle recinzioni degli isolati vengono trattate come aree a velocità zero ovvero a scabrezza infinita. Nell’ambito di un analisi di tipo 1D (unidimensionale) non si è in grado di fare valutazioni sofisticate tuttavia col software Hec Ras si può simulare l’effetto rappresentato dai muri di cinta e dalla massa d’acqua in essi contenuti, mediante un’ostruzione (blocked obstruction): nell’analisi proposta sono state considerate due ostruzioni al fine di simulare la presenza dei cancelli laterali. In relazione all’estensione dell’area bagnata complessiva, la presenza di tali ostruzioni determina un disturbo minimo che non determina variazione apprezzabili dei tiranti idrici rispetto alla situazione in cui viene omessa la presenza del cimitero utilizzata ai fini della perimetrazione delle aree: come se il cimitero fosse trasparente ai deflussi. Di conseguenza lo stato di progetto (post operam) non altera le caratteristiche del deflusso esistente rispetto allo stato di fatto (ante operam). 5.3 Analisi idraulica Rispetto allo studio di compatibilità già presentato sono state interpolate le sezioni 1605 e 1566 che corrispondono ai muri di cinta posti a monte e a valle. L’analisi idraulica effettuata col software Hec Ras mostra come in queste sezioni il tirante idrico rimanga inalterato a prescindere dalla presenza o meno delle ostruzioni che simulano la presenza del cimitero. Di conseguenza non risultano differenze fra lo stato ante operam e quello post operam comunque si operi all’interno dei muri di cinta. Dalle sezioni 1605,1589,1566 si ricava che i tiranti idrici per 500 anni determinano allagamenti fino all’altezza dell’ingresso laterale; risulta non soggetta ad allagamento l’area in cui sono posti i nuovi parcheggi e il nuovo ingresso anche per tempi di ritorno di 200 anni. Si riportano di seguito le risultanze ottenute col software Hec Ras nell’ipotesi di utilizzare le portate del PSFF nel caso di presenza e assenza delle ostruzioni che simulano la presenza delle strutture cimiteriali. 5.4 Confronto fra lo studio già presentato e lo studio con portate pari a quelle del PSFF Si fornisce una tabella di confronto delle situazioni esaminate da cui risulta come nello studio già presentato la quota del pelo libero utilizzata (sez 1404) è comunque superiore a quella ricavabile dal PSFF (sez. 07_MN_059, sez. 97) L’analisi ripetuta con le portate del PSFF non cambia quanto scritto nello studio di compatibilità già presentato: le opere in progetto non modificano i parametri idrologici ed idraulici di cui alla modellazione riportata nel PSFF. 16 50 100 200 500 518 630 741 888 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1956 1956 1956 1956 50 100 200 500 Fluminimannu FM_03 1941 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1931 1931 1931 1931 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 l 1976 1976 1976 1976 Ch FM_03 FM_03 FM_03 FM_03 # Fluminimannu Fluminimannu Fluminimannu Fluminimannu de 142.18 142.18 142.18 142.18 th 518 630 741 888 ou Fr 50 100 200 500 (m2) id W 2019 2019 2019 2019 p FM_03 FM_03 FM_03 FM_03 To Fluminimannu Fluminimannu Fluminimannu Fluminimannu 145.73 145.81 145.86 145.95 (m/s) a re A 146.22 146.35 146.47 146.6 l 142.04 142.04 142.04 142.04 ow Fl 518 630 741 888 hn 50 100 200 500 (m/m) lC Ve 2049 2049 2049 2049 e FM_03 FM_03 FM_03 FM_03 (m) p lo Fluminimannu Fluminimannu Fluminimannu Fluminimannu v le . .S (m) .S G E. .E G E. W rit El (m) C Ch l ta To (m) v le .E .S in Q ile of Pr ta ch ea er iv S er iv W M R R R (m3/s) (m) 146.28 146.42 146.54 146.69 0.00100 0.00105 0.00114 0.00120 1.48 1.57 1.68 1.77 567.23 636.19 698.83 772.76 526.12 534.15 546.2 546.41 0.29 0.3 0.31 0.33 146.19 146.31 146.43 146.56 146.25 146.38 146.51 146.65 0.00121 0.00127 0.00131 0.00138 1.65 1.74 1.82 1.92 541.65 608.31 669.5 739.77 517.05 525.45 529.03 532.82 0.31 0.32 0.33 0.34 142.27 142.27 142.27 142.27 146.13 146.26 146.37 146.5 146.2 146.33 146.45 146.59 0.00104 0.00112 0.00118 0.00128 1.7 1.8 1.9 2.03 553.05 615.45 672.5 736.98 503.71 505.16 506.68 511.26 0.3 0.32 0.33 0.34 518 630 741 888 142.12 142.12 142.12 142.12 146.07 146.19 146.3 146.42 146.17 146.3 146.42 146.56 0.00138 0.00148 0.00155 0.00168 2.07 2.2 2.3 2.44 483.78 542.32 596.62 656.4 484.41 486.45 487.57 488.87 0.36 0.37 0.38 0.4 50 100 200 500 518 630 741 888 141.31 141.31 141.31 141.31 145.63 145.77 145.86 146.01 145.88 146.02 146.14 146.28 0.00240 0.00250 0.00276 0.00277 2.75 2.88 3.07 3.16 347.93 412.8 455.25 524.57 440.39 464.74 470.61 476.74 0.46 0.47 0.5 0.5 1925 1925 1925 1925 50 100 200 500 518 630 741 888 141.16 141.16 141.16 141.16 145.54 145.67 145.85 146 145.52 145.66 145.85 146 146.11 146.25 0.00335 0.00362 0.00300 0.00291 3.08 3.29 3.09 3.13 311.89 370.33 456.17 528.14 448.72 468.82 474.87 477.65 0.54 0.56 0.52 0.51 1854 1854 1854 1854 50 100 200 500 518 630 741 888 140.66 140.66 140.66 140.66 145.3 145.41 145.45 145.57 145.30 145.41 145.45 145.57 145.6 145.72 145.83 145.97 0.00379 0.00406 0.00507 0.00535 3.25 3.43 3.86 4.06 315.08 362.93 378.53 434.95 416.1 450.67 463.06 471.64 0.57 0.59 0.67 0.69 145.75 145.82 145.90 146.01 Bridge ANALISI CON OSTRUZIONI 50 100 200 500 518 630 741 888 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1643 1643 1643 1643 50 100 200 500 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1609 1609 1609 1609 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu l 1673 1673 1673 1673 Ch FM_03 FM_03 FM_03 FM_03 # Fluminimannu Fluminimannu Fluminimannu Fluminimannu de 140.83 140.83 140.83 140.83 th 518 630 741 888 ou Fr 50 100 200 500 (m2) id W 1719 1719 1719 1719 p FM_03 FM_03 FM_03 FM_03 To Fluminimannu Fluminimannu Fluminimannu Fluminimannu 144.82 144.92 145.02 145.10 (m/s) a re A 144.83 144.96 145.08 145.22 l 140.78 140.78 140.78 140.78 ow Fl 518 630 741 888 hn 50 100 200 500 (m/m) lC Ve 1783 1783 1783 1783 e FM_03 FM_03 FM_03 FM_03 (m) p lo Fluminimannu Fluminimannu Fluminimannu Fluminimannu v le . .S (m) .S G E. .E G E. W rit El (m) C Ch l ta To (m) v le .E .S in Q ile of Pr ta ch ea er iv S er iv W M R R R (m3/s) (m) 145.14 145.25 145.36 145.5 0.00530 0.00505 0.00486 0.00475 3.42 3.44 3.47 3.54 292.55 348.92 402.3 471.93 415.03 440.97 470.45 493.95 0.66 0.65 0.64 0.64 144.68 144.81 144.93 145.08 144.82 144.96 145.08 145.23 0.00327 0.00314 0.00305 0.00293 2.5 2.53 2.57 2.61 377.48 438.17 492.89 563.08 462.19 469.15 472.2 489.68 0.51 0.5 0.5 0.49 140.76 140.76 140.76 140.76 144.57 144.69 144.82 144.97 144.68 144.82 144.94 145.1 0.00277 0.00281 0.00270 0.00256 2.29 2.38 2.41 2.43 401.76 463.51 522.52 597.87 472.89 484.71 489.88 494.21 0.46 0.47 0.46 0.46 518 630 741 888 140.66 140.66 140.66 140.66 144.45 144.59 144.72 144.88 144.59 144.73 144.86 145.02 0.00327 0.00300 0.00282 0.00261 2.53 2.52 2.52 2.52 381.77 449.9 511.75 590.94 469.43 479.37 485.61 491.91 0.51 0.49 0.48 0.47 50 100 200 500 518 630 741 888 140.88 140.88 140.88 140.88 144.36 144.5 144.63 144.8 144.48 144.63 144.76 144.93 0.00287 0.00272 0.00261 0.00244 2.44 2.46 2.49 2.5 392.14 458.72 519.87 599.44 444.6 460.37 470.85 481.3 0.48 0.47 0.47 0.46 1605.10* 1605.10* 1605.10* 1605.10* 50 100 200 500 518 630 741 888 140.87 140.87 140.87 140.87 144.34 144.49 144.62 144.79 144.47 144.62 144.75 144.92 0.00287 0.00271 0.00261 0.00248 2.47 2.48 2.51 2.54 389.37 455.5 516.01 594.83 441 454.04 464.62 479.43 0.48 0.47 0.47 0.46 FM_03 FM_03 FM_03 FM_03 1590 1590 1590 1590 50 100 200 500 518 630 741 888 140.82 140.82 140.82 140.82 144.29 144.43 144.57 144.74 144.43 144.57 144.71 144.88 0.00268 0.00267 0.00258 0.00248 2.48 2.56 2.59 2.63 384.99 447 507.74 586.34 422.9 440.25 455.49 473.08 0.47 0.48 0.47 0.47 FM_03 FM_03 FM_03 FM_03 1566.68* 1566.68* 1566.68* 1566.68* 50 100 200 500 518 630 741 888 140.85 140.85 140.85 140.85 144.24 144.39 144.53 144.7 144.36 144.51 144.65 144.82 0.00267 0.00250 0.00236 0.00218 2.39 2.4 2.41 2.41 401.57 471.04 537.09 621.83 456.3 470.3 481.05 497.08 0.47 0.46 0.45 0.44 ANALISI CON OSTRUZIONI # l th Ch id W (m2) de p a re A l (m/s) ou Fr To ow Fl hn (m/m) lC Ve e (m) p lo v le . .S (m) .S G E. .E G E. W rit El (m) C Ch l ta To (m) v le .E .S in Q ile of Pr ta ch ea er iv S er iv W M R R R (m3/s) (m) Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1541 1541 1541 1541 50 100 200 500 518 630 741 888 140.89 140.89 140.89 140.89 144.19 144.35 144.49 144.66 144.29 144.44 144.59 144.77 0.00220 0.00204 0.00191 0.00178 2.12 2.12 2.12 2.13 439.8 514.81 585.89 676.94 484.64 495 509.87 519.86 0.42 0.41 0.4 0.39 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1494 1494 1494 1494 50 100 200 500 518 630 741 888 140.73 140.73 140.73 140.73 144.15 144.3 144.44 144.62 144.21 144.36 144.51 144.69 0.00110 0.00112 0.00112 0.00109 1.58 1.65 1.7 1.74 543.87 619.89 693.29 787.17 495.66 511.14 521.49 531.94 0.31 0.31 0.31 0.31 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1404 1404 1404 1404 50 100 200 500 573 697 820 988 140.87 140.87 140.87 140.87 143.98 144.13 144.27 144.44 144.07 144.22 144.37 144.56 0.00221 0.00209 0.00203 0.00200 1.92 1.95 2 2.08 464.99 537.31 604.73 691.59 470.57 476.04 486.53 501.33 0.42 0.41 0.41 0.41 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1265 1265 1265 1265 50 100 200 500 573 697 820 988 139.02 139.02 139.02 139.02 143.65 143.8 143.94 144.1 143.76 143.92 144.07 144.26 0.00224 0.00225 0.00227 0.00233 2.01 2.09 2.18 2.3 423.52 478.72 528.1 587.06 359.31 360.6 361.22 361.65 0.41 0.42 0.42 0.43 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1008 1008 1008 1008 50 100 200 500 573 697 820 988 137.97 137.97 137.97 137.97 142.28 142.37 142.46 142.6 142.64 142.78 142.92 143.09 0.01089 0.01145 0.01178 0.01137 3.53 3.75 3.93 4.05 240 269 296.79 339.25 309.01 310.56 312.6 317.94 0.87 0.9 0.92 0.92 River Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl 142.28 142.37 142.46 142.60 LEGENDA corpo idrico tratto esaminato l’identificativo della sezione tempo di ritorno il valore della portata al colmo la quota di fondo alveo il livello della corrente; il livello della corrente critica il livello energetico; perdita di carico totale la velocità nel canale; l’area della sezione bagnata; la larghezza sul pelo libero della sezione; il numero di Froude ANALISI CON OSTRUZIONI RS = 2048.7 .04 .04 .04 180 Legend WS 500 WS 200 175 WS 100 WS 50 170 0.6 m/s 0.8 m/s 1.0 m/s 165 Elevation (m) 1.2 m/s 1.4 m/s 160 1.6 m/s Ground Bank Sta 155 150 145 140 0 100 200 300 400 500 600 700 Station (m) RS = 2018.7 .04 .04 .04 180 Legend WS 500 WS 200 175 WS 100 WS 50 170 0.6 m/s 0.8 m/s 1.0 m/s 165 Elevation (m) 1.2 m/s 1.4 m/s 160 1.6 m/s 1.8 m/s Ground 155 Bank Sta 150 145 140 0 100 200 300 400 Station (m) ANALISI CON OSTRUZIONI 500 600 700 RS = 1975.5 .04 .04 .04 175 Legend WS 500 WS 200 170 WS 100 WS 50 0.6 m/s 165 0.8 m/s Elevation (m) 1.0 m/s 1.2 m/s 160 1.4 m/s 1.6 m/s 1.8 m/s 155 Ground Bank Sta 150 145 140 0 100 200 300 400 500 600 Station (m) RS = 1956.2 .04 .04 .04 175 Legend WS 500 WS 200 170 WS 100 WS 50 0.6 m/s 165 0.8 m/s Elevation (m) 1.0 m/s 1.2 m/s 160 1.4 m/s 1.6 m/s 1.8 m/s 155 2.0 m/s 2.2 m/s Ground 150 Bank Sta 145 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1941 .04 BR .04 .04 175 Legend WS 500 WS 200 170 WS 100 WS 50 0.5 m/s 165 1.0 m/s Elevation (m) 1.5 m/s 2.0 m/s 160 2.5 m/s 3.0 m/s 3.5 m/s 155 Ground Bank Sta 150 145 140 0 100 200 300 400 500 600 Station (m) RS = 1941 .04 .04 BR .04 170 Legend WS 500 WS 200 WS 100 165 WS 50 0.0 m/s 0.5 m/s 160 1.0 m/s Elevation (m) 1.5 m/s 2.0 m/s 155 2.5 m/s 3.0 m/s 3.5 m/s Ground 150 Bank Sta 145 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1931.1 .04 .04 .04 170 Legend WS 500 WS 200 WS 100 165 WS 50 0.5 m/s 1.0 m/s 160 1.5 m/s Elevation (m) 2.0 m/s 2.5 m/s 155 3.0 m/s Ground Bank Sta 150 145 140 0 100 200 300 400 500 600 Station (m) RS = 1924.5 .04 .04 .04 165 Legend WS 500 WS 200 WS 100 160 WS 50 0.5 m/s 1.0 m/s 1.5 m/s 155 Elevation (m) 2.0 m/s 2.5 m/s 3.0 m/s 3.5 m/s 150 Ground Bank Sta 145 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1853.8 .04 .04 .04 160 Legend WS 500 WS 200 WS 100 WS 50 155 1.0 m/s 1.5 m/s 2.0 m/s Elevation (m) 2.5 m/s 3.0 m/s 150 3.5 m/s Ground Bank Sta 145 140 0 100 200 300 400 500 600 Station (m) RS = 1782.5 .04 .04 .04 154 Legend WS 500 WS 200 152 WS 100 WS 50 1.0 m/s 150 1.5 m/s Elevation (m) 2.0 m/s 2.5 m/s 148 3.0 m/s 3.5 m/s Ground 146 Bank Sta 144 142 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1718.6 .04 .04 .04 150 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.5 m/s 2.0 m/s 146 Elevation (m) 2.5 m/s Ground Bank Sta 144 142 140 0 100 200 300 400 500 600 Station (m) RS = 1673.1 .04 .04 .04 150 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 146 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s 2.2 m/s 144 2.4 m/s Ground Bank Sta 142 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1643 .04 . 0 4 152 .04 Legend WS 500 WS 200 WS 100 150 WS 50 1.0 m/s 1.2 m/s 148 1.4 m/s Elevation (m) 1.6 m/s 1.8 m/s 146 2.0 m/s 2.2 m/s 2.4 m/s 2.6 m/s 144 Ground Bank Sta 142 140 0 100 200 300 400 500 600 700 Station (m) RS = 1609.1 .04 . 0 4 150 .04 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 146 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s 2.2 m/s 144 2.4 m/s 2.6 m/s Ground Bank Sta 142 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1605.10* .04 . 0 4 150 .04 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 146 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s 2.2 m/s 144 2.4 m/s 2.6 m/s Ground Bank Sta 142 140 0 100 200 300 400 500 600 700 Station (m) RS = 1589.5 .04 . 0 4 152 .04 Legend WS 500 WS 200 WS 100 150 WS 50 1.0 m/s 1.2 m/s 148 1.4 m/s Elevation (m) 1.6 m/s 1.8 m/s 146 2.0 m/s 2.2 m/s 2.4 m/s 2.6 m/s 144 Ground Bank Sta 142 140 0 100 200 300 400 Station (m) ANALISI CON OSTRUZIONI 500 600 700 RS = 1566.68* .04 . 0 4 156 .04 Legend WS 500 WS 200 154 WS 100 WS 50 152 1.0 m/s 1.2 m/s 1.4 m/s 150 Elevation (m) 1.6 m/s 1.8 m/s 148 2.0 m/s 2.2 m/s 2.4 m/s 146 Ground Bank Sta 144 142 140 0 100 200 300 400 500 600 700 Station (m) RS = 1540.7 .04 . 0 4 160 .04 Legend WS 500 WS 200 WS 100 WS 50 155 0.8 m/s 1.0 m/s 1.2 m/s Elevation (m) 1.4 m/s 1.6 m/s 150 1.8 m/s 2.0 m/s 2.2 m/s Ground Bank Sta 145 140 0 100 200 300 400 Station (m) ANALISI CON OSTRUZIONI 500 600 700 RS = 1493.5 .04 .04 .04 158 Legend WS 500 156 WS 200 WS 100 WS 50 154 0.6 m/s 0.8 m/s 152 1.0 m/s Elevation (m) 1.2 m/s 150 1.4 m/s 1.6 m/s Ground 148 Bank Sta 146 144 142 140 0 100 200 300 400 500 600 Station (m) RS = 1403.8 .04 .04 .04 165 Legend WS 500 WS 200 WS 100 160 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 155 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s Ground 150 Bank Sta 145 140 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 600 RS = 1265.1 .04 .04 .04 156 Legend WS 500 154 WS 200 WS 100 WS 50 152 1.2 m/s 1.4 m/s 150 1.6 m/s Elevation (m) 1.8 m/s 148 2.0 m/s 2.2 m/s Ground 146 Bank Sta 144 142 140 138 0 100 200 300 400 500 Station (m) RS = 1008.1 .04 .04 .04 160 Legend WS 500 WS 200 WS 100 155 WS 50 1.5 m/s 2.0 m/s 2.5 m/s 150 Elevation (m) 3.0 m/s 3.5 m/s 4.0 m/s Ground 145 Bank Sta 140 135 0 100 200 300 Station (m) ANALISI CON OSTRUZIONI 400 500 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1956 1956 1956 1956 50 100 200 500 Fluminimannu FM_03 1941 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1931 1931 1931 1931 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 hl 518 630 741 888 C 50 100 200 500 # 1976 1976 1976 1976 de FM_03 FM_03 FM_03 FM_03 th Fluminimannu Fluminimannu Fluminimannu Fluminimannu ou Fr 142.18 142.18 142.18 142.18 (m2) id W 518 630 741 888 p 50 100 200 500 To 2019 2019 2019 2019 (m/s) a re A FM_03 FM_03 FM_03 FM_03 l Fluminimannu Fluminimannu Fluminimannu Fluminimannu 145.73 145.81 145.86 145.95 ow Fl 146.22 146.35 146.47 146.6 hn 142.04 142.04 142.04 142.04 (m/m) lC Ve 518 630 741 888 e 50 100 200 500 (m) p lo 2049 2049 2049 2049 .S G E. FM_03 FM_03 FM_03 FM_03 v le . .S El (m) Fluminimannu Fluminimannu Fluminimannu Fluminimannu .E G E. W rit h (m) C C l ta To (m) v le .E .S in Q ile of Pr ta ch ea er iv S er iv W M R R R (m3/s) (m) 146.28 146.42 146.54 146.69 0.00100 0.00105 0.00114 0.00120 1.48 1.57 1.68 1.77 567.23 636.19 698.83 772.76 526.12 534.15 546.2 546.41 0.29 0.3 0.31 0.33 146.19 146.31 146.43 146.56 146.25 146.38 146.51 146.65 0.00121 0.00127 0.00131 0.00138 1.65 1.74 1.82 1.92 541.65 608.31 669.5 739.77 517.05 525.45 529.03 532.82 0.31 0.32 0.33 0.34 142.27 142.27 142.27 142.27 146.13 146.26 146.37 146.5 146.2 146.33 146.45 146.59 0.00104 0.00112 0.00118 0.00128 1.7 1.8 1.9 2.03 553.05 615.45 672.5 736.98 503.71 505.16 506.68 511.26 0.3 0.32 0.33 0.34 518 630 741 888 142.12 142.12 142.12 142.12 146.07 146.19 146.3 146.42 146.17 146.3 146.42 146.56 0.00138 0.00148 0.00155 0.00168 2.07 2.2 2.3 2.44 483.78 542.32 596.62 656.4 484.41 486.45 487.57 488.87 0.36 0.37 0.38 0.4 50 100 200 500 518 630 741 888 141.31 141.31 141.31 141.31 145.63 145.77 145.86 146.01 145.88 146.02 146.14 146.28 0.00240 0.00250 0.00276 0.00277 2.75 2.88 3.07 3.16 347.93 412.8 455.25 524.57 440.39 464.74 470.61 476.74 0.46 0.47 0.5 0.5 1925 1925 1925 1925 50 100 200 500 518 630 741 888 141.16 141.16 141.16 141.16 145.54 145.67 145.85 146 145.52 145.66 145.85 146 146.11 146.25 0.00335 0.00362 0.00300 0.00291 3.08 3.29 3.09 3.13 311.89 370.33 456.17 528.14 448.72 468.82 474.87 477.65 0.54 0.56 0.52 0.51 1854 1854 1854 1854 50 100 200 500 518 630 741 888 140.66 140.66 140.66 140.66 145.3 145.41 145.45 145.57 145.30 145.41 145.45 145.57 145.6 145.72 145.83 145.97 0.00379 0.00406 0.00507 0.00535 3.25 3.43 3.86 4.06 315.08 362.93 378.53 434.95 416.1 450.67 463.06 471.64 0.57 0.59 0.67 0.69 145.75 145.82 145.90 146.01 Bridge Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1643 1643 1643 1643 50 100 200 500 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1609 1609 1609 1609 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu Fluminimannu hl 518 630 741 888 C 50 100 200 500 # 1673 1673 1673 1673 de FM_03 FM_03 FM_03 FM_03 th Fluminimannu Fluminimannu Fluminimannu Fluminimannu ou Fr 140.83 140.83 140.83 140.83 (m2) id W 518 630 741 888 p 50 100 200 500 To 1719 1719 1719 1719 (m/s) a re A FM_03 FM_03 FM_03 FM_03 l Fluminimannu Fluminimannu Fluminimannu Fluminimannu 144.82 144.92 145.02 145.10 ow Fl 144.83 144.96 145.08 145.22 hn 140.78 140.78 140.78 140.78 (m/m) lC Ve 518 630 741 888 e 50 100 200 500 (m) p lo 1783 1783 1783 1783 .S G E. FM_03 FM_03 FM_03 FM_03 v le . .S El (m) Fluminimannu Fluminimannu Fluminimannu Fluminimannu .E G E. W rit h (m) C C l ta To (m) v le .E .S in Q ile of Pr ta ch ea er iv S er iv W M R R R (m3/s) (m) 145.14 145.25 145.36 145.5 0.00530 0.00505 0.00486 0.00475 3.42 3.44 3.47 3.54 292.55 348.92 402.3 471.93 415.03 440.97 470.45 493.95 0.66 0.65 0.64 0.64 144.68 144.81 144.93 145.08 144.82 144.96 145.08 145.23 0.00327 0.00314 0.00305 0.00293 2.5 2.53 2.57 2.61 377.48 438.17 492.89 563.08 462.19 469.15 472.2 489.68 0.51 0.5 0.5 0.49 140.76 140.76 140.76 140.76 144.57 144.69 144.82 144.97 144.68 144.82 144.94 145.1 0.00277 0.00281 0.00270 0.00256 2.29 2.38 2.41 2.43 401.76 463.51 522.52 597.87 472.89 484.71 489.88 494.21 0.46 0.47 0.46 0.46 518 630 741 888 140.66 140.66 140.66 140.66 144.45 144.59 144.72 144.88 144.59 144.73 144.86 145.02 0.00327 0.00300 0.00282 0.00261 2.53 2.52 2.52 2.52 381.77 449.9 511.75 590.94 469.43 479.37 485.61 491.91 0.51 0.49 0.48 0.47 50 100 200 500 518 630 741 888 140.88 140.88 140.88 140.88 144.36 144.5 144.63 144.8 144.48 144.63 144.76 144.93 0.00287 0.00272 0.00261 0.00244 2.44 2.46 2.49 2.5 392.14 458.72 519.87 599.44 444.6 460.37 470.85 481.3 0.48 0.47 0.47 0.46 1605.10* 1605.10* 1605.10* 1605.10* 50 100 200 500 518 630 741 888 140.87 140.87 140.87 140.87 144.34 144.49 144.62 144.79 144.47 144.62 144.75 144.92 0.00287 0.00271 0.00261 0.00248 2.47 2.48 2.51 2.54 389.37 455.5 516.01 594.83 441 454.04 464.62 479.43 0.48 0.47 0.47 0.46 FM_03 FM_03 FM_03 FM_03 1590 1590 1590 1590 50 100 200 500 518 630 741 888 140.82 140.82 140.82 140.82 144.29 144.43 144.57 144.74 144.43 144.57 144.71 144.88 0.00268 0.00267 0.00258 0.00248 2.48 2.56 2.59 2.63 384.99 447 507.74 586.34 422.9 440.25 455.49 473.08 0.47 0.48 0.47 0.47 FM_03 FM_03 FM_03 FM_03 1566.68* 1566.68* 1566.68* 1566.68* 50 100 200 500 518 630 741 888 140.85 140.85 140.85 140.85 144.24 144.39 144.53 144.7 144.36 144.51 144.65 144.82 0.00267 0.00250 0.00236 0.00218 2.39 2.4 2.41 2.41 401.57 471.04 537.09 621.83 456.3 470.3 481.05 497.08 0.47 0.46 0.45 0.44 # hl th C id W (m2) de p a re A l (m/s) ou Fr To ow Fl hn (m/m) lC Ve e (m) p lo v le . .S El (m) .S G E. .E G E. W rit h (m) C C l ta To (m) v le .E .S in Q ile of Pr ta ch ea er iv S er iv W M R R R (m3/s) (m) Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1541 1541 1541 1541 50 100 200 500 518 630 741 888 140.89 140.89 140.89 140.89 144.19 144.35 144.49 144.66 144.29 144.44 144.59 144.77 0.00220 0.00204 0.00191 0.00178 2.12 2.12 2.12 2.13 439.8 514.81 585.89 676.94 484.64 495 509.87 519.86 0.42 0.41 0.4 0.39 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1494 1494 1494 1494 50 100 200 500 518 630 741 888 140.73 140.73 140.73 140.73 144.15 144.3 144.44 144.62 144.21 144.36 144.51 144.69 0.00110 0.00112 0.00112 0.00109 1.58 1.65 1.7 1.74 543.87 619.89 693.29 787.17 495.66 511.14 521.49 531.94 0.31 0.31 0.31 0.31 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1404 1404 1404 1404 50 100 200 500 573 697 820 988 140.87 140.87 140.87 140.87 143.98 144.13 144.27 144.44 144.07 144.22 144.37 144.56 0.00221 0.00209 0.00203 0.00200 1.92 1.95 2 2.08 464.99 537.31 604.73 691.59 470.57 476.04 486.53 501.33 0.42 0.41 0.41 0.41 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1265 1265 1265 1265 50 100 200 500 573 697 820 988 139.02 139.02 139.02 139.02 143.65 143.8 143.94 144.1 143.76 143.92 144.07 144.26 0.00224 0.00225 0.00227 0.00233 2.01 2.09 2.18 2.3 423.52 478.72 528.1 587.06 359.31 360.6 361.22 361.65 0.41 0.42 0.42 0.43 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1008 1008 1008 1008 50 100 200 500 573 697 820 988 137.97 137.97 137.97 137.97 142.28 142.37 142.46 142.6 142.64 142.78 142.92 143.09 0.01089 0.01145 0.01178 0.01137 3.53 3.75 3.93 4.05 240 269 296.79 339.25 309.01 310.56 312.6 317.94 0.87 0.9 0.92 0.92 River Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl 142.28 142.37 142.46 142.60 LEGENDA corpo idrico tratto esaminato l’identificativo della sezione tempo di ritorno il valore della portata al colmo la quota di fondo alveo il livello della corrente; il livello della corrente critica il livello energetico; perdita di carico totale la velocità nel canale; l’area della sezione bagnata; la larghezza sul pelo libero della sezione; il numero di Froude RS = 2048.7 .04 .04 .04 180 Legend WS 500 WS 200 175 WS 100 WS 50 170 0.6 m/s 0.8 m/s 1.0 m/s 165 Elevation (m) 1.2 m/s 1.4 m/s 160 1.6 m/s Ground Bank Sta 155 150 145 140 0 100 200 300 400 500 600 700 Station (m) RS = 2018.7 .04 .04 .04 180 Legend WS 500 WS 200 175 WS 100 WS 50 170 0.6 m/s 0.8 m/s 1.0 m/s 165 Elevation (m) 1.2 m/s 1.4 m/s 160 1.6 m/s 1.8 m/s Ground 155 Bank Sta 150 145 140 0 100 200 300 400 Station (m) 500 600 700 RS = 1975.5 .04 .04 .04 175 Legend WS 500 WS 200 170 WS 100 WS 50 0.6 m/s 165 0.8 m/s Elevation (m) 1.0 m/s 1.2 m/s 160 1.4 m/s 1.6 m/s 1.8 m/s 155 Ground Bank Sta 150 145 140 0 100 200 300 400 500 600 Station (m) RS = 1956.2 .04 .04 .04 175 Legend WS 500 WS 200 170 WS 100 WS 50 0.6 m/s 165 0.8 m/s Elevation (m) 1.0 m/s 1.2 m/s 160 1.4 m/s 1.6 m/s 1.8 m/s 155 2.0 m/s 2.2 m/s Ground 150 Bank Sta 145 140 0 100 200 300 Station (m) 400 500 600 RS = 1941 .04 BR .04 .04 175 Legend WS 500 WS 200 170 WS 100 WS 50 0.5 m/s 165 1.0 m/s Elevation (m) 1.5 m/s 2.0 m/s 160 2.5 m/s 3.0 m/s 3.5 m/s 155 Ground Bank Sta 150 145 140 0 100 200 300 400 500 600 Station (m) RS = 1941 .04 .04 BR .04 170 Legend WS 500 WS 200 WS 100 165 WS 50 0.0 m/s 0.5 m/s 160 1.0 m/s Elevation (m) 1.5 m/s 2.0 m/s 155 2.5 m/s 3.0 m/s 3.5 m/s Ground 150 Bank Sta 145 140 0 100 200 300 Station (m) 400 500 600 RS = 1931.1 .04 .04 .04 170 Legend WS 500 WS 200 WS 100 165 WS 50 0.5 m/s 1.0 m/s 160 1.5 m/s Elevation (m) 2.0 m/s 2.5 m/s 155 3.0 m/s Ground Bank Sta 150 145 140 0 100 200 300 400 500 600 Station (m) RS = 1924.5 .04 .04 .04 165 Legend WS 500 WS 200 WS 100 160 WS 50 0.5 m/s 1.0 m/s 1.5 m/s 155 Elevation (m) 2.0 m/s 2.5 m/s 3.0 m/s 3.5 m/s 150 Ground Bank Sta 145 140 0 100 200 300 Station (m) 400 500 600 RS = 1853.8 .04 .04 .04 160 Legend WS 500 WS 200 WS 100 WS 50 155 1.0 m/s 1.5 m/s 2.0 m/s Elevation (m) 2.5 m/s 3.0 m/s 150 3.5 m/s Ground Bank Sta 145 140 0 100 200 300 400 500 600 Station (m) RS = 1782.5 .04 .04 .04 154 Legend WS 500 WS 200 152 WS 100 WS 50 1.0 m/s 150 1.5 m/s Elevation (m) 2.0 m/s 2.5 m/s 148 3.0 m/s 3.5 m/s Ground 146 Bank Sta 144 142 140 0 100 200 300 Station (m) 400 500 600 RS = 1718.6 .04 .04 .04 150 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.5 m/s 2.0 m/s 146 Elevation (m) 2.5 m/s Ground Bank Sta 144 142 140 0 100 200 300 400 500 600 Station (m) RS = 1673.1 .04 .04 .04 150 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 146 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s 2.2 m/s 144 2.4 m/s Ground Bank Sta 142 140 0 100 200 300 Station (m) 400 500 600 RS = 1643 .04 . 0 4 152 .04 Legend WS 500 WS 200 WS 100 150 WS 50 1.0 m/s 1.2 m/s 148 1.4 m/s Elevation (m) 1.6 m/s 1.8 m/s 146 2.0 m/s 2.2 m/s 2.4 m/s 2.6 m/s 144 Ground Bank Sta 142 140 0 100 200 300 400 500 600 700 Station (m) RS = 1609.1 .04 . 0 4 150 .04 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 146 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s 2.2 m/s 144 2.4 m/s 2.6 m/s Ground Bank Sta 142 140 0 100 200 300 Station (m) 400 500 600 RS = 1605.10* .04 . 0 4 150 .04 Legend WS 500 WS 200 WS 100 148 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 146 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s 2.2 m/s 144 2.4 m/s 2.6 m/s Ground Bank Sta 142 140 0 100 200 300 400 500 600 700 Station (m) RS = 1589.5 .04 . 0 4 152 .04 Legend WS 500 WS 200 WS 100 150 WS 50 1.0 m/s 1.2 m/s 148 1.4 m/s Elevation (m) 1.6 m/s 1.8 m/s 146 2.0 m/s 2.2 m/s 2.4 m/s 2.6 m/s 144 Ground Bank Sta 142 140 0 100 200 300 400 Station (m) 500 600 700 RS = 1566.68* .04 . 0 4 156 .04 Legend WS 500 WS 200 154 WS 100 WS 50 152 1.0 m/s 1.2 m/s 1.4 m/s 150 Elevation (m) 1.6 m/s 1.8 m/s 148 2.0 m/s 2.2 m/s 2.4 m/s 146 Ground Bank Sta 144 142 140 0 100 200 300 400 500 600 700 Station (m) RS = 1540.7 .04 . 0 4 160 .04 Legend WS 500 WS 200 WS 100 WS 50 155 0.8 m/s 1.0 m/s 1.2 m/s Elevation (m) 1.4 m/s 1.6 m/s 150 1.8 m/s 2.0 m/s 2.2 m/s Ground Bank Sta 145 140 0 100 200 300 400 Station (m) 500 600 700 RS = 1493.5 .04 .04 .04 158 Legend WS 500 156 WS 200 WS 100 WS 50 154 0.6 m/s 0.8 m/s 152 1.0 m/s Elevation (m) 1.2 m/s 150 1.4 m/s 1.6 m/s Ground 148 Bank Sta 146 144 142 140 0 100 200 300 400 500 600 Station (m) RS = 1403.8 .04 .04 .04 165 Legend WS 500 WS 200 WS 100 160 WS 50 1.0 m/s 1.2 m/s 1.4 m/s 155 Elevation (m) 1.6 m/s 1.8 m/s 2.0 m/s Ground 150 Bank Sta 145 140 0 100 200 300 Station (m) 400 500 600 RS = 1265.1 .04 .04 .04 156 Legend WS 500 154 WS 200 WS 100 WS 50 152 1.2 m/s 1.4 m/s 150 1.6 m/s Elevation (m) 1.8 m/s 148 2.0 m/s 2.2 m/s Ground 146 Bank Sta 144 142 140 138 0 100 200 300 400 500 Station (m) RS = 1008.1 .04 .04 .04 160 Legend WS 500 WS 200 WS 100 155 WS 50 1.5 m/s 2.0 m/s 2.5 m/s 150 Elevation (m) 3.0 m/s 3.5 m/s 4.0 m/s Ground 145 Bank Sta 140 135 0 100 200 300 Station (m) 400 500 hl C th id (m2) # W a re A (m/s) de ou Fr p To ow Fl l hn (m/m) C v (m) pe lo le (m) l Ve .S .E . (m) G E. G E. .S v El le W .E h C l ta To e fil a St ch (m) r it C in .S W M Q er o Pr iv R ea R er iv R (m3/s) (m) Analisi effettuata nello studio già presentato con le portate corrette in assenza di ostruzioni Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1590 1590 1590 1590 50 100 200 500 514.02 625.16 735.31 881.18 140.82 140.82 140.82 140.82 144.23 144.36 144.48 144.64 144.39 144.53 144.66 144.82 0.00317 0.00318 0.00319 0.00309 2.66 2.74 2.82 2.87 361.52 416.72 470.02 540.3 415.89 432.1 448.72 464.09 0.51 0.52 0.52 0.52 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1404 1404 1404 1404 50 100 200 500 514.02 625.16 735.31 881.18 140.87 140.87 140.87 140.87 143.87 144.01 144.13 144.3 143.97 144.11 144.24 144.42 0.00245 0.00240 0.00228 0.00215 1.95 2.01 2.04 2.08 417.61 479.47 540.59 621.83 462.99 472.21 476.18 490.17 0.44 0.44 0.43 0.42 Analisi effettuata con le portate del PSFF in presenza di ostruzioni che simulano il cimitero Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1590 1590 1590 1590 50 100 200 500 518 630 741 888 140.82 140.82 140.82 140.82 144.29 144.43 144.57 144.73 144.42 144.57 144.71 144.89 0.00265 0.00264 0.00254 0.00243 2.46 2.54 2.57 2.6 380.49 439.34 495.3 566.03 404.17 413.56 417.08 421.4 0.47 0.47 0.47 0.46 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1404 1404 1404 1404 50 100 200 500 573 697 820 988 140.87 140.87 140.87 140.87 143.98 144.13 144.27 144.44 144.07 144.22 144.37 144.56 0.00221 0.00209 0.00203 0.00200 1.92 1.95 2 2.08 464.99 537.31 604.73 691.59 470.57 476.04 486.53 501.33 0.42 0.41 0.41 0.41 Analisi effettuata con le portate del PSFF in assenza di ostruzioni che simulano il cimitero Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1590 1590 1590 1590 50 100 200 500 518 630 741 888 140.82 140.82 140.82 140.82 144.29 144.43 144.57 144.74 144.43 144.57 144.71 144.88 0.00268 0.00267 0.00258 0.00248 2.48 2.56 2.59 2.63 384.99 447 507.74 586.34 422.9 440.25 455.49 473.08 0.47 0.48 0.47 0.47 Fluminimannu Fluminimannu Fluminimannu Fluminimannu FM_03 FM_03 FM_03 FM_03 1404 1404 1404 1404 50 100 200 500 573 697 820 988 140.87 140.87 140.87 140.87 143.98 144.13 144.27 144.44 144.07 144.22 144.37 144.56 0.00221 0.00209 0.00203 0.00200 1.92 1.95 2 2.08 464.99 537.31 604.73 691.59 470.57 476.04 486.53 501.33 0.42 0.41 0.41 0.41 573 697 820 139.15 139.15 139.15 143.59 143.79 143.96 143.93 144.06 144.2 3.33 3.21 3.11 339 423 502 436 445 450 0.55 0.51 0.49 Tiranti idrici contenuti nel PSFF in assenza di ostruzioni 97 97 97 50 100 200 Confronto Si noti per confronto col PSFF che nella sezione 1404 si rilevano tiranti idrici maggiori che nella sezione 07_MN_059 (97) pur essendo le aree a pericolosità meno estese. 6 Compatibilità In sintesi e per quanto espresso, le opere in oggetto sono tutte funzionali a definire un nuovo complesso cimiteriale, non delocalizzabile, con un nuovo ingresso meno vulnerabile, meno esposto alle inondazioni. A) adeguamento del cimitero storico B) nel completamento dell’ampliamento con la realizzazione di quattro corpi di fabbrica contenenti i loculi e gli ambienti per l’esercizio delle attività, C) nell’adeguamento della viabilità esterna (sistemazione viabilità esistente e parcheggi con nuovo accesso al cimitero) D) nell’adeguamento degli impianti tecnologici (rete idrica, fognaria, elettrica) Si ritiene opportuno dover valutare le opere in progetto prese nel loro insieme ai sensi dell’art. 27 comma 3 lettera i. In caso contario solo le opere B) previste in ampiamento all’interno del muro di cinta sarebbero soggette a studio di compatibilità idraulica come risulta dalle seguenti associazioni tra opere di cui al precedente elenco e N.A. del PAI: A) (opere sul cimitero storico) in area Hi4 sono ammissibili ai sensi dell’art. 27 comma 2 lettera d, comma 3 lettera b) e non soggette a studio di compatibilità idraulica B) (ampliamento cimitero) in area Hi4 sono ammissibili ai sensi dell’art. 27 comma 3 lettera i ; B) (impianti tecnologici e di depurazione ) in area Hi4 sono ammissibili ai sensi dell’art. 27 comma 2 lettera f e non soggetti a studio di compatibilità idraulica; C) (sistemazione viabilità esistente posta al lato del cimitero esterna all’area di cinta) in area Hi4 è ammissibile in quanto rientrano tra quelle previste nell’art. 27 comma 3 lettera b e non soggetto a studio di compatibilità idraulica; C) (parcheggi e viabilità con nuovo accesso) si tratta di nuove opere esterne all’area di cinta che risultano in area Hi2: in quanto siti nella pertinenza dell’area cimiteriale risultano ammissibili ai sensi dell’art. 29 comma 2 lettera g. Inoltre sempre se trattate singolarmente, viste le normative in materia di edilizia cimiteriale, troverebbe attuazione l’art. 27 comma 3 lettera g. D) (impianti tecnologici) esterne all’area di cinta e in area Hi2 o minori sono ammissibili e non soggette a studio di compatibilità idraulica. Le opere inoltre non modificano i parametri idrologici ed idraulici di cui alla modellazione riportata nel PSFF; risultano essere compatibile ovvero tale da non aggravare la situazione di pericolosità e di rischio esistente nell’area in oggetto ai sensi dell’art.23 comma 9 delle N.A. del PAI, ovvero 17 rispettano le prescrizioi di cui alle lettere a, b, c, d, I, o; non risultano cogenti le prescrizioni contenute nelle lettere e,f,g,h,i trattandosi di un intervento puntuale; non si ritiene si possano assumere misure di compensazione puntuali ai sensi della lettera m dato che non si prevede un aumento della pericolosità; occorre che in fase di esecuzione dei lavori il cantiere sia organizzato e le attività programmate in modo da rispettare le prescrizioni di cui alla lettera n; Per comodità nel seguito si riporta il comma 9 dell’art.23 18 7 Sintesi in merito alle integrazioni richieste Lo studio di compatibilità idraulica è redatto in base al progetto preliminare, questo deve essere considerato parte integrante dello studio di compatibilità idraulica. Il progetto definitivo esecutivo non introduce novità rispetto alle categorie di interventi previsti nel progetto preliminare, non muta le caratteristiche dell’intervento. Poiché l’opera è da valutare alla luce di norme improntate alla pianificazione quali N.A. del PAI e le medesime norme in materia cimiteriale, si è per quanto detto ritenuto opportuno trattare l’impianto cimiteriale nel suo complesso. Al riguardo si rileva altresì che l’impianto non appare comunque delocalizzabile, per cui andrebbe comunque realizzato dove si trova. Le N.A. del PAI consentono di attuare gli interventi previsti. Per quanto riguarda i parametri idrologici e idraulici di cui al PSFF: sono stati utilizzati tali parametri nonostante sia possibile appurare la presenza di errori obiettivi sul PSFF medesimo. Al riguardo si rileva come nessuna norma imponga l’uso pedissequo dei dati del PSFF, in quanto questi vanno valutati opportunamente almeno con la normale diligenza, non vigendo obbligo di utilizzare unicamente le sezioni del PSFF. Si rileva ancora che utilizzare i valori di portata del PSFF in riferimento al caso e alle sezioni in esame equivale a interpretare in modo irrealistico il comportamento dei corpi idrici minori alla confluenza col rio Fluminimannu. L’entità delle portate (ricavate in base al coefficiente udometrico di cui al PSFF) non incide sull’ammissibilità dell’intervento: i valori di portata sono stati utilizzati ai fini di valutare provvedimenti atti a ridurre la vulnerabilità delle strutture; questo è un obiettivo non previsto dalle norme PAI in cui il rischio è stato determinato ponendo la vulnerabilità pari a 1. Ai fini della pericolosità l’intervento è stato ritenuto tutto in area Hi4 ad eccezione dei parcheggi e degli allacci alle reti tecnologiche. Ai fini della pericolosità l’intervento è stato ritenuto tutto in area Hi4 ad eccezione dei parcheggi e degli allacci alle reti tecnologiche. Allo stato delle N.A. del PAI lo scopo dello studio di compatibilità idraulica è valutare la coerenza con le finalità indicate nell’articolo 23, comma 6, e nell’articolo 25 delle norme di attuazione del PAI e che l’intervento sottoposto all’approvazione sia stato progettato rispettando il vincolo di non aumentare il livello di pericolosità e di rischio esistente - fatto salvo quello eventuale intrinsecamente connesso all’intervento ammissibile - e di non precludere la possibilità di eliminare o ridurre le condizioni di pericolosità e rischio. 19