CTA & ASTRI @ SAIt CTA/ASTRI: stato, problemi, opportunità Giovanni Pareschi INAF - Osservatorio Astronomico di Brera on behalf of the ASTRI Collaboration * Giovanni Pareschi – Bologna 8 maggio 2013 1 CTA & ASTRI @ SAIt The current VHE status VERITAS (4x12m) MAGIC (2x17m) Giovanni Pareschi – Bologna 8 maggio 2013 4 CTA & ASTRI @ SAIt The MAGIC telescopes Mirror diam. 17 m Coll. Area 240 m2 Focal length 17.5 m FOV about 3 deg Ang res. (d90) < 3‘ Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt TeV Sources Hinton & Hofmann, 2009 Hinton & Hofmann, 2009 (a) The current catalog of VHE g-ray sources plotted on the sky in Galactic coordinates. (b) The H.E.S.S. survey of the Galactic plane. Giovanni Pareschi – Bologna 8 maggio 2013 6 CTA & ASTRI @ SAIt INAF Production Sequence for Mirrors Glass Gluing Panel Preparation Slumping & Curing Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt Succesfully implemented in MAGIC II ! After 4 years still in very good conditions Being implemented also for MAGIC I Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt Severe environmental conditions! Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt CTA main goals CTA will consist of two arrays of Cherenkov telescopes, which aim to: • increase sensitivity by 1 order of magnitude @ 1 TeV; • boost significantly the detection area • improve the angular resolution • provide uniform energy coverage from some tens of GeV to beyond 100 TeV; • enhance the sky survey capability, monitoring capability and flexibility of operation. Giovanni Pareschi – Bologna 8 maggio 2013 10 CTA & ASTRI @ SAIt The CTA Concept Hofmann & Martinez, 2011, Exp. Astr., 32, 193 CTA plans the construction of about 100 telescopes divided in 3 kinds of configurations, in order to cover the energy range from a tens of GeV (Large Size Telescope, LST), to a tens of TeV (Medium Size Telescope, MST), and up to 100 TeV (Small Size Telescope, SST). Giovanni Pareschi – Bologna 8 maggio 2013 11 CTA & ASTRI @ SAIt CTA for the European Union: the Preparatory Phase Construction cost [M€] Operations cost [M€] Timescale CTA 150 10 2013 E-ELT 950 30 2018 ELI 400 50 2015 FAIR 1187 120 2016 KM3NeT 200 5 2016 PRINS 1400 300 2009-2015 SKA (GLOBAL) 1500 100-150 2016 SPIRAL2 196 6.6 2014 Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt CTA sensitivity M. Martinez, Zeuthen 2010 ASTRI Giovanni Pareschi – Bologna 8 maggio 2013 16 CTA & ASTRI @ SAIt CTA data rights Hofmann & Martinez, 2011, Exp. Astr., 32, 193 Operated as an ‘‘open’’ Observatory. Peer-reviewed process on submitted proposal. Observations performed by Consortium experts. Foreseen ‘‘legacy’’ data (Galactic Plane, full-sky survey, ...). Giovanni Pareschi – Bologna 8 maggio 2013 18 CTA & ASTRI @ SAIt The CTA Consortium >25 Countries >132 Institutes >1000 Persons > 220 FTEs • ITALY: 178 • INAF: 127 • Others (INFN + Univer.): 51 Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt CTA organization for the implementation phase • • • • An interim legal entity for CTA will take over the consortium organization for 2 years with 2 M€ of central funds to administer It is required for site negotiations and site agreements, for In Kind Contributions agreements, and a variety of other steps site preparation and installation of first telescopes ASTRI mini-array European Research Infrastructure Consortium (ERIC) organized for the final implementation after the first 2 years INAF aims to participate leading the implementation of the 70 SST array, delivering the mirrors for MST and hosting the CTA HQ Giovanni Pareschi – Bologna 8 maggio 2013 20 CTA & ASTRI @ SAIt The ASTRI Project The ASTRI Program is an Italian “Progetto Bandiera” funded by MIUR 8 M€ . The main goal is the production, within the CTA framework and following its requirements, of both an end-to-end prototype of the CTA SST to be tested under field conditions in 2014, and a SST mini-array to be placed at the chosen CTA Southern Site during 2016. Also the development of the mirrors for the MST telescopes is an important goal. INAF is in charge of the design and production of the mirrors and the camera, the development of the end-to-end software, MC simulations and other related activities. INAF contributes with more than 21 FTE/year (end 2012) to the project (76 staff members) + 21 FTE/year (100%) of young researchers hired within the contract . The Project is subject to annual reviews by MIUR in order to review the status and allocate the budget according to the following scheme: 2011 (3 M€), 2012 (2 M€), 2013 (1.5 M€), and 2014 (1.3 M€). Giovanni Pareschi – Bologna 8 maggio 2013 21 CTA & ASTRI @ SAIt The ASTRI Project ASTRI SST-2M concept: a large (9.6o) field of view dual-mirror (Schwarschild-Couder) telescope; Principal Investigator G. Pareschi a light (~50 kg) and compact (~50x50x50 cm3) camera based on Hamamatsu SiPMTs. Co-PIs O. Catalano & S. Vercellone Program Manager M. Fiorini System Engineer L. Stringhetti INAF/CTA Responsible P. Caraveo INAF Institutions IASF Milano, IASF Bologna, IASF Palermo INAF HQ Roma, OA Brera, OA Torino, OA Padova, OA Bologna, OA Arcetri, OA Roma, OA Capodimonte, OA Catania University Partners Univer. of Padova, Univer. of Perugia Giovanni Pareschi – Bologna 8 maggio 2013 25 CTA & ASTRI @ SAIt The ASTRI Prototype Mirrors Mirrors’ main characteristics: Primary Mirror diameter: 4.3 m (tessellated) Secondary Mirror diameter: 1.8 m (monolithic) f/0.5 Equivalent focal length: 2150 mm Corrected FoV diameter: 9.6o Giovanni Pareschi – Bologna 8 maggio 2013 26 CTA & ASTRI @ SAIt The Prototype Primary Mirror (M1) • off-axis aspherical profile obtained with the glass Cold-Shaping technology • Physical Vapor Deposition of a multilayer of pure dielectric materials Triangle with mounting pins, 2 actuators, 1 fixed point, 1 tangential restrain, and the alignment system. Giovanni Pareschi – Bologna 8 maggio 2013 27 CTA & ASTRI @ SAIt The ASTRI Prototype Camera Camera’ main characteristics: Detector type: monolithic MPPC array (SiPMs) Logical Pixel size: 6.2 mm x 6.2 mm [0.17o] Plate scale: 37.5 mm/o Number of Pixels : 7936 • Number of channels : 1984 (grouping 2 x 2 pixels) Giovanni Pareschi – Bologna 8 maggio 2013 29 CTA & ASTRI @ SAIt The ASTRI Prototype Camera 1 ASTRI Focal Surface 37 PDMs FoV diameter = 9.6o Size imposed by the manufacturer 1 Photon Detection Modul (PDM) = 4x4 Units 1 Unit 4x4 pixel 1px = 3mm x 3mm Giovanni Pareschi – Bologna 8 maggio 2013 30 CTA & ASTRI @ SAIt The ASTRI Prototype Camera Mechanical housing drawing and 37 Photon Detection Modules mounted on the mechanical housing. SiPM 4x4 Board n.1 Photon Detection Module - Board n.2 Mock-up of the mechanical housing + PDMs and sketch of the ASTRI Camera with the Camera-Telescope I/F. First prototype of a 4x4 PDMs Mosaic with 3 SiPMs already mounted Giovanni Pareschi – Bologna 8 maggio 2013 31 play.py?confId=303 CTA & ASTRI @ SAIt ■ Visited site on ETNAThe at which ASTRI SST-2M Prototype Site ASTRI prototype can be tested INAF - Catania Astrophysical Observatory The "M. G. Fracastoro" Mountain Station - Serra La Nave (Mt. Etna) Altitude: 1735 m a.s.l. Longitude: +14o 58’.4; Latitude +37o 41’.5 Fully operative INAF Observatory High-speed internet connection Mechanical & Electronics Labs ASTRI SST-2M Prototype 61cm Dome Domes Main entrance 91cm Dome Guests House, Offices and Labs An importan outreach program will be carried out by INAF in collaboration with the Etna Park Giovanni Pareschi – Bologna 8 maggio 2013 32 CTA & ASTRI @ SAIt ASTRI Prototype Major Milestones ASTRI SST-2M Prototype April 2013 ➔ call for tenders on 4 ASTRI SST-2M structures [1 for the prototype and 3 for the mini-array phase 1] June 2014 ➔ ASTRI SST-2M Prototype in situ for scientific evaluation Giovanni Pareschi – Bologna 8 maggio 2013 33 CTA & ASTRI @ SAIt The ASTRI mini-array test concept Our goal is the deployment and the operation of a mini-array composed of a few SST-2M telescopes at the final CTA southern site. An ancient concept... Giovanni Pareschi – Bologna 8 maggio 2013 34 CTA & ASTRI @ SAIt Major Milestones ASTRI SST-2M mini-array CTA Southern site should be decided within the current milestone 2014 - 2015 ➔ ASTRI mini-array re-assessment study 2015 - 2016 ➔ Extension of the ASTRI mini-array [phase 2], and mini-array deployment phase. Giovanni Pareschi – Bologna 8 maggio 2013 35 CTA & ASTRI @ SAIt Namibia – Aar Argentina – San Antonio de los Cobres Chile – Cerro Armazones (Antofagasta) Giovanni Pareschi – Bologna 8 maggio 2013 36 CTA & ASTRI @ SAIt Institutes and organizations participating in the miniarray • • • • ASTRI consortium University of the Witwatersrand, Johannesburg , South Africa 300 kEuro already approved Brasil 1500 kEuro requested to the San Paulo local funding agency CHEC (Cherenkov High Energy Camera) – UK consortium in kind contribution on cameras • GATE SST group - Observatoire de Paris in kind contribution on structures • • • University of Amsterdam pending proposal for in kind contribution CNEA, Argentina in kind contribution (international agreement Italia/Argentina) DESY (MST) MOU under finalization Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt INAF TRIO Giovanni Pareschi – Bologna 8 maggio 2013 38 CTA & ASTRI @ SAIt INAF TRIO Giovanni Pareschi – Bologna 8 maggio 2013 South Africa 39 CTA & ASTRI @ SAIt INAF TRIO BRASILIAN TRIO South Africa Giovanni Pareschi – Bologna 8 maggio 2013 40 CTA & ASTRI @ SAIt ASTRI miniarry expected performance ASTRI Energy resolution: ~ 10 % @10 TeV (vs. 20 % di HAWC) Angular Resolution: 0.06-0.07 deg @10 TeV (improving with the energy) vs. 0.2 Exploration of degEHE of regime HAWC the Crab MINI-ARRAY of galactic sources 10% Crab Possibility of very long integrations on a sample of selected source 1% Crab Great improvement at low energies if also two or more MST are implemented! Not only a technology pathfinder but also very good science is possible when FERMI and SWIFT will be in operation! Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt Southern Hemisphere Hinton & Vercellone, 2012 • Vela X ➔ 30x10-12 • RX J1713 ➔ 10 •Vela Junior ➔ 10 •HESS J1616 ➔ 6 •HESS J1837 ➔ 4 •HESS J1813 ➔3 •HESS J1825 ➔ 3 •HESS J1745/GC ➔ 2 •HESS J1702 ➔ 2 •HESS J1804 ➔ 2 HESS J1303 ➔ 2 •HESS J1718 ➔ 2 •LS 5039 ➔ 0.5-2 A few observable in pairs with ~9 degree FoV. Opportunity for serendipitous detections of new hard spectrum Galactic sources. Giovanni Pareschi – Bologna 8 maggio 2013 43 CTA & ASTRI @ SAIt Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt 5 SSTs + 2 MSTs = CTA seed Coupling the SSTs miniarray with 2 MSTs would constitute the first real CTA precursor. Dramatic boosting in performance. MST Team at DESY already contacted and willing to tighten the collaboration. Giovanni Pareschi – Bologna 8 maggio 2013 45 CTA & ASTRI @ SAIt Next Steps Courtesy of R. Canestrari HMMM.... Giovanni Pareschi – Bologna 8 maggio 2013 46 CTA & ASTRI @ SAIt Next Steps Courtesy of R. Canestrari SST & MST Giovanni Pareschi – Bologna 8 maggio 2013 47 CTA & ASTRI @ SAIt Giovanni Pareschi – Bologna 8 maggio 2013 CTA & ASTRI @ SAIt Summary We plan to start the ASTRI SST-2M Prototype activities at Serra La Nave during Spring 2014. The ASTRI Prototype will allow us to test the main innovative components: the optical dual-mirror design and the SiPM-based focal plane. We are fully compliant w.r.t. the CTA requirements and we work on a day-by-day basis in collaboration with the CTA technical management. The SST mini-array will be a quantum-leap w.r.t. the ASTRI SST2M prototype performance, allowing us to validate several CTA array properties. Giovanni Pareschi – Bologna 8 maggio 2013 49 CTA & ASTRI @ SAIt For more information: • http://www.brera.inaf.it/astri/ • http://www.cta-observatory.org Giovanni Pareschi – Bologna 8 maggio 2013 51