SNAM RETE GAS Transportation capacities at the ENTRY Points Update to 28/02/2014 of the available capacities for booking for the Thermal Year Thermal Year 2013/2014 (Values in Sm³/day - 15° C; 1,01325 bar) Note: for the Thermal Years 2014/2015 and 2015/2016, except for Cavarzere Entry Point, transportation capacity values in the table are valid, while booked capacity values are equal to zero as the Network Code makes provisions for booking for the first Thermal Year only; Cavarzere Entry Point data are included in the transportation capacity multiannual area. ENTRY Points interconnected with LNG terminals ENTRY Point Minimum contractual pressure [barg] Month Transportation capacity (a) Booked capacity (b) Reserved capacity (#) (c) Available capacity (a-b-c) Connected to Snam Rete Gas network Connected to Edison Stoccaggio network October November 21 041 096 December 5 358 904 January February 50081701 Cavarzere March 70 April 26 400 000 May 24 415 825 June X 1 984 175 July August September October November December 15 000 000 January - February 50102201 Livorno March 80 April 15 000 000 X May June - 15 000 000 11 000 000 2 000 000 July August September October November December January February 35717701 Panigaglia March 70 April 13 000 000 X 6 800 000 May 6 200 000 June July August September Notes: (#) Reserved capacity to the operator in compliance with art. 6.3 of delibera 168/06 issued by the Autorità per l'energia elettrica e il gas ENTRY Points interconnected with storages ENTRY Points Minimum contractual pressure [barg] Transportation capacity (a) Booked capacity (b) Available capacity (a-b) Connected to Snam Rete Gas network STENI_WTH Stogit (1) 222 400 000 122 249 206 (#) 100 150 794 X STEDG_WTH Edison Stoccaggio (2) 6 255 668 5 343 832 (#) 911 836 X Connected to S.G.I. network X Notes: (1) Delivery point from storage of Fiume Treste (San Salvo): Minimum contractual pressure 75 barg; delivery points from storages of Bordolano,Cortemaggiore, Minerbio, Ripalta, Sabbioncello and Settala: Minimum contractual pressure 70 barg; delivery point from storage of Sergnano: Minimum contractual pressure 65 barg; delivery point from storage of Brugherio: Minimum contractual pressure 24 barg (2) Delivery points from storages of Cellino and Collalto on the S.G.I. network : Minimum contractual pressure 70 barg Delivery point from storage of Collalto on the Snam Rete Gas network : Minimum contractual pressure 70 barg Delivery point from storage of Castel Bolognese on the Snam Rete Gas network : Minimum contractual pressure 70 barg (#) Capacity booked until 31st March 2014 Page 1 of 4 SNAM RETE GAS Transportation capacities at the ENTRY Points Update to 28/02/2014 of the available capacities for booking for the Thermal Year Thermal Year 2013/2014 (Values in Sm³/day - 15° C; 1,01325 bar) ENTRY Points interconnected with national productions ENTRY Point Physical Delivery Point Minimum contractual pressure [barg] Transportation capacity (a) Booked capacity (b) Available capacity (a-b) Connected to Snam Rete Gas network Connected to S.G.I. network 35730101 Bronte 70 300 000 280 000 20 000 X 35729901 Calderasi/Monteverdese 70 10 000 1 150 8 850 X 35724901 Candela 64 500 000 500 000 - X 50108301 Capparuccia 70 800 000 165 000 635 000 X 35725001 Carassai 70 65 000 28 000 37 000 X 35720301 Casalborsetti 70 3 154 500 3 154 500 - X 35720401 Casteggio 24 18 000 6 000 12 000 X 35723401 Caviaga 24 26 300 20 000 6 300 X 35725101 Cellino 70 162 500 63 150 99 350 X 50081801 Collalto 70 17 000 12 000 5 000 X 50081901 Comiso 12 32 000 30 000 2 000 X 35725201 Crotone 70 1 900 000 1 750 000 150 000 X 35725401 Falconara 70 6 060 000 4 650 000 1 410 000 X 35725601 Fano 70 5 080 000 4 700 000 380 000 X 50013201 Fonte Filippo 60 4 070 - 4 070 X 35724301 Fornovo 64 120 000 92 500 27 500 X 35730201 Gagliano 75 500 000 450 000 50 000 X 166 300 55 000 111 300 35726000 Grottammare Daily flow rate for each physical 35726010 Grottammare 70 100 000 delivery point: 35726001 Grottammare 54 66 300 70 600 000 550 000 50 000 116 300 50 000 66 300 35726101 Hera Lacinia 35167700 Larino Daily flow rate for each physical 35167701 Larino 60 100 000 delivery point: 35727601 Sinarca 64 16 300 35730301 Mazara/Lippone 50071201 20 Medicina (from 1st November to 31st March) Medicina (from 1st October to 31st October and from 1st April to 30th September) 24 X X X X X 20 000 20 000 - X 110 000 80 000 30 000 X 88 000 80 000 8 000 X 35728601 Metaponto 60 38 250 38 250 - X 35852201 Monte Alpi 75 3 290 000 3 290 000 - X 35728501 Montecosaro 54 4 070 - 4 070 X 35724101 Montenevoso 24 35801601 Muzza (from 1st November to 31st March) Muzza (from 1st October to 31st October and from 1st April to 30th September) 12 6 000 6 000 - X 120 000 100 000 20 000 X 96 000 96 000 - X 50001301 Noto 75 9 160 - 9 160 X 50045101 Ortona 70 250 000 - 250 000 X 20 000 20 000 - X X 35721401 Ovanengo 58 (#) 35721601 Piadena Ovest 24 35726700 Pineto 8 140 - 8 140 1 715 000 1 165 000 550 000 Daily flow rate for each physical 50003701 Pineto 70 700 000 delivery point: 35726701 Pineto 54 1 015 000 35728400 Pisticci A.P./B.P. 343 000 Daily flow rate for each physical 35728401 Pisticci alta pressione 60 261 000 delivery point: 35726801 Pisticci bassa pressione X X 140 000 203 000 X 24 82 000 35728901 Poggiofiorito 60 25 000 15 000 10 000 X 35721701 Pontetidone 12 7 200 2 000 5 200 X 50013101 Quarto 12 15 600 12 000 3 600 X 35721901 Ravenna Mare 70 2 670 000 2 670 000 - X 500 000 400 000 100 000 X 400 000 400 000 - X 88 660 55 800 32 860 50086901 Ravenna Mare Lido Adriano (from 1st November to 31st March) Ravenna Mare Lido Adriano (from 1st October to 31st October and from 1st April to 30th September) 24 35727100 Reggente X Daily flow rate for each physical 35727110 Reggente 70 79 500 delivery point: 35727101 Reggente 64 9 160 50070201 Rivolta d'Adda 24 70 000 10 000 60 000 X 35727201 Roseto/T.Vulgano 64 390 000 335 000 55 000 X 35722201 Rubicone 70 1 520 000 1 330 000 190 000 X 35727301 San Benedetto T. 54 14 000 14 000 - X 255 500 80 000 175 500 35728100 S. Giorgio M. X X Daily flow rate for each physical 35728110 S. Giorgio M. 70 230 000 delivery point: 35728101 S. Giorgio M. 54 25 500 65 12 500 10 500 2 000 X 160 000 160 000 - X 35728001 S. Stefano M. 35722401 Santerno (from 1st November to 31st March) X 54 700 54 700 - X 35729801 Settefinestre/Passatempo 70 55 000 55 000 - X 35729701 Sinni (Policoro) 50 45 000 30 000 15 000 X 35722801 Soresina 24 36 000 35 000 1 000 X 192 000 160 000 32 000 X 153 000 153 000 - X 35722901 Santerno (from 1st October to 31st October and from 1st April to 30th September) 24 X Spilamberto B.P. (from 1st November to 31st March) Spilamberto B.P. (from 1st October to 31st October and from 1st April to 30th September) 12 35727701 Torrente Tona 64 2 610 - 2 610 X 35723701 Trecate 55 72 000 45 000 27 000 X 3 000 3 000 - X 35814801 Vittorio V. (S. Antonio) (§) 5 Notes: (§) Transportation service on interruptible basis, conditionated upon the presence of a physical outflow from the Snam Rete Gas network to the redelivery point of Vittorio Veneto (code 34569001) (#) The delivery pressure will become 75 barg when a new network configuration will be completed Page 2 of 4 SNAM RETE GAS Transportation capacities at the ENTRY Points Update to 28/02/2014 of the available capacities for booking for the Thermal Year Thermal Year 2013/2014 (Values in Nm3/day - 0° C; 1,01325 bar - 1 Sm3=0,94794378 Nm3) (*) Note: for the Thermal Years 2014/2015 and 2015/2016, except for Cavarzere Entry Point, transportation capacity values in the table are valid, while booked capacity values are equal to zero as the Network Code makes provisions for booking for the first Thermal Year only; Cavarzere Entry Point data are included in the transportation capacity multi-annual area. ENTRY Points interconnected with LNG terminals ENTRY Point Minimum contractual pressure [barg] Month Transportation capacity (a) Booked capacity (b) Reserved capacity (#) (c) Available capacity (a-b-c) Connected to Snam Rete Gas network Connected to Edison Stoccaggio network October November 19 945 776 December 5 079 940 January February 50081701 Cavarzere March 70 April 25 025 716 May 23 144 829 June X 1 880 886 July August September October November December 14 219 157 January - February 50102201 Livorno March 80 April 14 219 157 X May June - 14 219 157 10 427 382 1 895 888 July August September October November December January February 35717701 Panigaglia March 70 April 12 323 269 X 6 446 018 May 5 877 251 June July August September Notes: (#) Reserved capacity to the operator in compliance with art. 6.3 of delibera 168/06 issued by the Autorità per l'energia elettrica e il gas ENTRY Points interconnected with storages ENTRY Points STENI_WTH Stogit STEDG_WTH Edison Stoccaggio Minimum contractual pressure [barg] Transportation capacity (a) Booked capacity (b) Available capacity (a-b) Connected to Snam Rete Gas network (1) 210 822 697 115 885 374 (#) 94 937 322 X (2) 5 930 022 5 065 652 (#) 864 369 X Connected to S.G.I. network X Notes: (1) Delivery point from storage of Fiume Treste (San Salvo): Minimum contractual pressure 75 barg; delivery points from storages of Bordolano,Cortemaggiore, Minerbio, Ripalta, Sabbioncello and Settala: Minimum contractual pressure 70 barg; delivery point from storage of Sergnano: Minimum contractual pressure 65 barg; delivery point from storage of Brugherio: Minimum contractual pressure 24 barg (2) Delivery points from storages of Cellino and Collalto on the S.G.I. network : Minimum contractual pressure 70 barg Delivery point from storage of Collalto on the Snam Rete Gas network : Minimum contractual pressure 70 barg Delivery point from storage of Castel Bolognese on the Snam Rete Gas network : Minimum contractual pressure 70 barg (**) The figure includes the booked capacity and the capacity used by Snam Rete Gas for transportation service. (#) Capacity booked until 31st March 2014 (*) The provision of information in units different from those set forth in Network code is carried out in compliance with the provisions of Regulation No. 715/2009. In case of any inconsistency, of whatever nature, related to the usage of such units, the units indicated in the Network code shall prevail. Page 3 of 4 SNAM RETE GAS Transportation capacities at the ENTRY Points Update to 28/02/2014 of the available capacities for booking for the Thermal Year Thermal Year 2013/2014 (Values in Nm3/day - 0° C; 1,01325 bar - 1 Sm3=0,94794378 Nm3) (*) ENTRY Points interconnected with national productions ENTRY Point Physical Delivery Point Minimum contractual pressure [barg] Transportation capacity (a) Booked capacity (b) Available capacity (a-b) Connected to Snam Rete Gas network Connected to S.G.I. network 35730101 Bronte 70 284 383 265 424 18 959 X 35729901 Calderasi/Monteverdese 70 9 479 1 090 8 389 X 35724901 Candela 64 473 972 473 972 - X 50108301 Capparuccia 70 758 355 156 411 601 944 X 35725001 Carassai 70 61 616 26 542 35 074 X 35720301 Casalborsetti 70 2 990 289 2 990 289 - X 35720401 Casteggio 24 17 063 5 688 11 375 X 35723401 Caviaga 24 24 931 18 959 5 972 X 35725101 Cellino 70 154 041 59 863 94 178 X 50081801 Collalto 70 16 115 11 375 4 740 X 50081901 Comiso 12 30 334 28 438 1 896 X 35725201 Crotone 70 1 801 093 1 658 902 142 192 X 35725401 Falconara 70 5 744 539 4 407 939 1 336 601 X 35725601 Fano 70 4 815 554 4 455 336 360 219 X 50013201 Fonte Filippo 60 3 858 - 3 858 X 35724301 Fornovo 64 113 753 87 685 26 068 X 35730201 Gagliano 75 473 972 426 575 47 397 X 157 643 52 137 105 506 35726000 Grottammare Daily flow rate for each physical 35726010 Grottammare 70 94 794 - delivery point: 35726001 Grottammare 54 62 849 - 70 568 766 521 369 47 397 110 246 47 397 62 849 35726101 Hera Lacinia 35167700 Larino Daily flow rate for each physical 35167701 Larino 60 94 794 - delivery point: 35727601 Sinarca 64 15 451 - 35730301 Mazara/Lippone 50071201 20 Medicina (from 1st November to 31st March) Medicina (from 1st October to 31st October and from 1st April to 30th September) 24 X X X X X 18 959 18 959 - X 104 274 75 836 28 438 X 83 419 75 836 7 584 X 35728601 Metaponto 60 36 259 36 259 - X 35852201 Monte Alpi 75 3 118 735 3 118 735 - X 35728501 Montecosaro 54 3 858 - 3 858 X 35724101 Montenevoso 24 35801601 Muzza (from 1st November to 31st March) Muzza (from 1st October to 31st October and from 1st April to 30th September) 12 5 688 5 688 - X 113 753 94 794 18 959 X 91 003 91 003 - X 50001301 Noto 75 8 683 - 8 683 X 50045101 Ortona 70 236 986 - 236 986 X 18 959 18 959 - X X 35721401 Ovanengo 58 (#) 35721601 Piadena Ovest 24 35726700 Pineto 7 716 - 7 716 1 625 724 1 104 355 521 369 Daily flow rate for each physical 50003701 Pineto 70 663 561 - delivery point: 35726701 Pineto 54 962 163 - 325 145 132 712 - 35728400 Pisticci A.P./B.P. Daily flow rate for each physical 35728401 Pisticci alta pressione 60 247 413 delivery point: 35726801 Pisticci bassa pressione X X 192 433 X 24 77 731 - 35728901 Poggiofiorito 60 23 699 14 219 9 479 X 35721701 Pontetidone 12 6 825 1 896 4 929 X 50013101 Quarto 12 14 788 11 375 3 413 X 35721901 Ravenna Mare 70 2 531 010 2 531 010 - X 473 972 379 178 94 794 X 379 178 379 178 - X 31 149 50086901 Ravenna Mare Lido Adriano (from 1st November to 31st March) Ravenna Mare Lido Adriano (from 1st October to 31st October and from 1st April to 30th September) 24 35727100 Reggente X 84 045 52 895 Daily flow rate for each physical 35727110 Reggente 70 75 362 - delivery point: 35727101 Reggente 64 8 683 - 50070201 Rivolta d'Adda 24 66 356 9 479 56 877 X 35727201 Roseto/T.Vulgano 64 369 698 317 561 52 137 X 35722201 Rubicone 70 1 440 875 1 260 765 180 109 X 35727301 San Benedetto T. 54 X 35728100 S. Giorgio M. X X 13 271 13 271 - 242 200 75 836 166 364 Daily flow rate for each physical 35728110 S. Giorgio M. 70 218 027 - delivery point: 35728101 S. Giorgio M. 54 24 173 - 65 11 849 9 953 1 896 X 151 671 151 671 - X 35728001 S. Stefano M. 35722401 Santerno (from 1st November to 31st March) X 51 853 51 853 - X 35729801 Settefinestre/Passatempo 70 52 137 52 137 - X 35729701 Sinni (Policoro) 50 42 657 28 438 14 219 X 35722801 Soresina 24 34 126 33 178 948 X 182 005 151 671 30 334 X 145 035 145 035 - X 35722901 Santerno (from 1st October to 31st October and from 1st April to 30th September) 24 X Spilamberto B.P. (from 1st November to 31st March) Spilamberto B.P. (from 1st October to 31st October and from 1st April to 30th September) 12 35727701 Torrente Tona 64 2 474 - 2 474 X 35723701 Trecate 55 68 252 42 657 25 594 X 2 844 2 844 - X 35814801 Vittorio V. (S. Antonio) (§) 5 Notes: (§) Transportation service on interruptible basis, conditionated upon the presence of a physical outflow from the Snam Rete Gas network to the redelivery point of Vittorio Veneto (code 34569001) (#) The delivery pressure will become 75 barg when a new network configuration will be completed (*) The provision of information in units different from those set forth in Network code is carried out in compliance with the provisions of Regulation No. 715/2009. In case of any inconsistency, of whatever nature, related to the usage of such units, the units indicated in the Network code shall prevail. Page 4 of 4