SNAM RETE GAS
Transportation capacities at the ENTRY Points
Update to 28/02/2014 of the available capacities for booking for the Thermal Year
Thermal Year 2013/2014
(Values in Sm³/day - 15° C; 1,01325 bar)
Note: for the Thermal Years 2014/2015 and 2015/2016, except for Cavarzere Entry Point, transportation capacity values in the table are valid, while booked capacity values are
equal to zero as the Network Code makes provisions for booking for the first Thermal Year only; Cavarzere Entry Point data are included in the transportation capacity multiannual area.
ENTRY Points interconnected with LNG terminals
ENTRY Point
Minimum
contractual
pressure
[barg]
Month
Transportation
capacity
(a)
Booked
capacity
(b)
Reserved
capacity (#)
(c)
Available
capacity
(a-b-c)
Connected to
Snam Rete Gas
network
Connected to
Edison Stoccaggio
network
October
November
21 041 096
December
5 358 904
January
February
50081701
Cavarzere
March
70
April
26 400 000
May
24 415 825
June
X
1 984 175
July
August
September
October
November
December
15 000 000
January
-
February
50102201
Livorno
March
80
April
15 000 000
X
May
June
-
15 000 000
11 000 000
2 000 000
July
August
September
October
November
December
January
February
35717701
Panigaglia
March
70
April
13 000 000
X
6 800 000
May
6 200 000
June
July
August
September
Notes:
(#) Reserved capacity to the operator in compliance with art. 6.3 of delibera 168/06 issued by the Autorità per l'energia elettrica e il gas
ENTRY Points interconnected with storages
ENTRY Points
Minimum
contractual
pressure
[barg]
Transportation
capacity
(a)
Booked
capacity
(b)
Available
capacity
(a-b)
Connected to
Snam Rete Gas
network
STENI_WTH
Stogit
(1)
222 400 000
122 249 206 (#)
100 150 794
X
STEDG_WTH
Edison Stoccaggio
(2)
6 255 668
5 343 832 (#)
911 836
X
Connected to
S.G.I.
network
X
Notes:
(1) Delivery point from storage of Fiume Treste (San Salvo): Minimum contractual pressure 75 barg;
delivery points from storages of Bordolano,Cortemaggiore, Minerbio, Ripalta, Sabbioncello and Settala: Minimum contractual pressure 70 barg;
delivery point from storage of Sergnano: Minimum contractual pressure 65 barg;
delivery point from storage of Brugherio: Minimum contractual pressure 24 barg
(2) Delivery points from storages of Cellino and Collalto on the S.G.I. network : Minimum contractual pressure 70 barg
Delivery point from storage of Collalto on the Snam Rete Gas network : Minimum contractual pressure 70 barg
Delivery point from storage of Castel Bolognese on the Snam Rete Gas network : Minimum contractual pressure 70 barg
(#) Capacity booked until 31st March 2014
Page 1 of 4
SNAM RETE GAS
Transportation capacities at the ENTRY Points
Update to 28/02/2014 of the available capacities for booking for the Thermal Year
Thermal Year 2013/2014
(Values in Sm³/day - 15° C; 1,01325 bar)
ENTRY Points interconnected with national productions
ENTRY Point
Physical Delivery Point
Minimum
contractual
pressure
[barg]
Transportation
capacity
(a)
Booked
capacity
(b)
Available
capacity
(a-b)
Connected to
Snam Rete Gas
network
Connected to
S.G.I.
network
35730101 Bronte
70
300 000
280 000
20 000
X
35729901 Calderasi/Monteverdese
70
10 000
1 150
8 850
X
35724901 Candela
64
500 000
500 000
-
X
50108301 Capparuccia
70
800 000
165 000
635 000
X
35725001 Carassai
70
65 000
28 000
37 000
X
35720301 Casalborsetti
70
3 154 500
3 154 500
-
X
35720401 Casteggio
24
18 000
6 000
12 000
X
35723401 Caviaga
24
26 300
20 000
6 300
X
35725101 Cellino
70
162 500
63 150
99 350
X
50081801 Collalto
70
17 000
12 000
5 000
X
50081901 Comiso
12
32 000
30 000
2 000
X
35725201 Crotone
70
1 900 000
1 750 000
150 000
X
35725401 Falconara
70
6 060 000
4 650 000
1 410 000
X
35725601 Fano
70
5 080 000
4 700 000
380 000
X
50013201 Fonte Filippo
60
4 070
-
4 070
X
35724301 Fornovo
64
120 000
92 500
27 500
X
35730201 Gagliano
75
500 000
450 000
50 000
X
166 300
55 000
111 300
35726000 Grottammare
Daily flow rate for each physical
35726010
Grottammare
70
100 000
delivery point:
35726001
Grottammare
54
66 300
70
600 000
550 000
50 000
116 300
50 000
66 300
35726101 Hera Lacinia
35167700 Larino
Daily flow rate for each physical
35167701
Larino
60
100 000
delivery point:
35727601
Sinarca
64
16 300
35730301 Mazara/Lippone
50071201
20
Medicina (from 1st November to 31st March)
Medicina (from 1st October to 31st October and from 1st April to 30th September)
24
X
X
X
X
X
20 000
20 000
-
X
110 000
80 000
30 000
X
88 000
80 000
8 000
X
35728601 Metaponto
60
38 250
38 250
-
X
35852201 Monte Alpi
75
3 290 000
3 290 000
-
X
35728501 Montecosaro
54
4 070
-
4 070
X
35724101 Montenevoso
24
35801601
Muzza (from 1st November to 31st March)
Muzza (from 1st October to 31st October and from 1st April to 30th September)
12
6 000
6 000
-
X
120 000
100 000
20 000
X
96 000
96 000
-
X
50001301 Noto
75
9 160
-
9 160
X
50045101 Ortona
70
250 000
-
250 000
X
20 000
20 000
-
X
X
35721401 Ovanengo
58 (#)
35721601 Piadena Ovest
24
35726700 Pineto
8 140
-
8 140
1 715 000
1 165 000
550 000
Daily flow rate for each physical
50003701
Pineto
70
700 000
delivery point:
35726701
Pineto
54
1 015 000
35728400 Pisticci A.P./B.P.
343 000
Daily flow rate for each physical
35728401
Pisticci alta pressione
60
261 000
delivery point:
35726801
Pisticci bassa pressione
X
X
140 000
203 000
X
24
82 000
35728901 Poggiofiorito
60
25 000
15 000
10 000
X
35721701 Pontetidone
12
7 200
2 000
5 200
X
50013101 Quarto
12
15 600
12 000
3 600
X
35721901 Ravenna Mare
70
2 670 000
2 670 000
-
X
500 000
400 000
100 000
X
400 000
400 000
-
X
88 660
55 800
32 860
50086901
Ravenna Mare Lido Adriano (from 1st November to 31st March)
Ravenna Mare Lido Adriano (from 1st October to 31st October and from 1st April to 30th September)
24
35727100 Reggente
X
Daily flow rate for each physical
35727110
Reggente
70
79 500
delivery point:
35727101
Reggente
64
9 160
50070201 Rivolta d'Adda
24
70 000
10 000
60 000
X
35727201 Roseto/T.Vulgano
64
390 000
335 000
55 000
X
35722201 Rubicone
70
1 520 000
1 330 000
190 000
X
35727301 San Benedetto T.
54
14 000
14 000
-
X
255 500
80 000
175 500
35728100 S. Giorgio M.
X
X
Daily flow rate for each physical
35728110
S. Giorgio M.
70
230 000
delivery point:
35728101
S. Giorgio M.
54
25 500
65
12 500
10 500
2 000
X
160 000
160 000
-
X
35728001 S. Stefano M.
35722401
Santerno (from 1st November to 31st March)
X
54 700
54 700
-
X
35729801 Settefinestre/Passatempo
70
55 000
55 000
-
X
35729701 Sinni (Policoro)
50
45 000
30 000
15 000
X
35722801 Soresina
24
36 000
35 000
1 000
X
192 000
160 000
32 000
X
153 000
153 000
-
X
35722901
Santerno (from 1st October to 31st October and from 1st April to 30th September)
24
X
Spilamberto B.P. (from 1st November to 31st March)
Spilamberto B.P. (from 1st October to 31st October and from 1st April to 30th September)
12
35727701 Torrente Tona
64
2 610
-
2 610
X
35723701 Trecate
55
72 000
45 000
27 000
X
3 000
3 000
-
X
35814801 Vittorio V. (S. Antonio) (§)
5
Notes:
(§) Transportation service on interruptible basis, conditionated upon the presence of a physical outflow from the Snam Rete Gas network to the redelivery point of Vittorio Veneto (code 34569001)
(#) The delivery pressure will become 75 barg when a new network configuration will be completed
Page 2 of 4
SNAM RETE GAS
Transportation capacities at the ENTRY Points
Update to 28/02/2014 of the available capacities for booking for the Thermal Year
Thermal Year 2013/2014
(Values in Nm3/day - 0° C; 1,01325 bar - 1 Sm3=0,94794378 Nm3) (*)
Note: for the Thermal Years 2014/2015 and 2015/2016, except for Cavarzere Entry Point, transportation capacity values in the table are valid, while booked capacity values
are equal to zero as the Network Code makes provisions for booking for the first Thermal Year only; Cavarzere Entry Point data are included in the transportation capacity
multi-annual area.
ENTRY Points interconnected with LNG terminals
ENTRY Point
Minimum
contractual
pressure
[barg]
Month
Transportation
capacity
(a)
Booked
capacity
(b)
Reserved
capacity (#)
(c)
Available
capacity
(a-b-c)
Connected to
Snam Rete Gas
network
Connected to
Edison Stoccaggio
network
October
November
19 945 776
December
5 079 940
January
February
50081701
Cavarzere
March
70
April
25 025 716
May
23 144 829
June
X
1 880 886
July
August
September
October
November
December
14 219 157
January
-
February
50102201
Livorno
March
80
April
14 219 157
X
May
June
-
14 219 157
10 427 382
1 895 888
July
August
September
October
November
December
January
February
35717701
Panigaglia
March
70
April
12 323 269
X
6 446 018
May
5 877 251
June
July
August
September
Notes:
(#) Reserved capacity to the operator in compliance with art. 6.3 of delibera 168/06 issued by the Autorità per l'energia elettrica e il gas
ENTRY Points interconnected with storages
ENTRY Points
STENI_WTH
Stogit
STEDG_WTH Edison Stoccaggio
Minimum
contractual
pressure
[barg]
Transportation
capacity
(a)
Booked
capacity
(b)
Available
capacity
(a-b)
Connected to
Snam Rete Gas
network
(1)
210 822 697
115 885 374 (#)
94 937 322
X
(2)
5 930 022
5 065 652 (#)
864 369
X
Connected to
S.G.I.
network
X
Notes:
(1) Delivery point from storage of Fiume Treste (San Salvo): Minimum contractual pressure 75 barg;
delivery points from storages of Bordolano,Cortemaggiore, Minerbio, Ripalta, Sabbioncello and Settala: Minimum contractual pressure 70 barg;
delivery point from storage of Sergnano: Minimum contractual pressure 65 barg;
delivery point from storage of Brugherio: Minimum contractual pressure 24 barg
(2) Delivery points from storages of Cellino and Collalto on the S.G.I. network : Minimum contractual pressure 70 barg
Delivery point from storage of Collalto on the Snam Rete Gas network : Minimum contractual pressure 70 barg
Delivery point from storage of Castel Bolognese on the Snam Rete Gas network : Minimum contractual pressure 70 barg
(**) The figure includes the booked capacity and the capacity used by Snam Rete Gas for transportation service.
(#) Capacity booked until 31st March 2014
(*) The provision of information in units different from those set forth in Network code is carried out in compliance with the provisions of Regulation No. 715/2009. In case of any
inconsistency, of whatever nature, related to the usage of such units, the units indicated in the Network code shall prevail.
Page 3 of 4
SNAM RETE GAS
Transportation capacities at the ENTRY Points
Update to 28/02/2014 of the available capacities for booking for the Thermal Year
Thermal Year 2013/2014
(Values in Nm3/day - 0° C; 1,01325 bar - 1 Sm3=0,94794378 Nm3) (*)
ENTRY Points interconnected with national productions
ENTRY Point
Physical Delivery Point
Minimum
contractual
pressure
[barg]
Transportation
capacity
(a)
Booked
capacity
(b)
Available
capacity
(a-b)
Connected to
Snam Rete Gas
network
Connected to
S.G.I.
network
35730101 Bronte
70
284 383
265 424
18 959
X
35729901 Calderasi/Monteverdese
70
9 479
1 090
8 389
X
35724901 Candela
64
473 972
473 972
-
X
50108301 Capparuccia
70
758 355
156 411
601 944
X
35725001 Carassai
70
61 616
26 542
35 074
X
35720301 Casalborsetti
70
2 990 289
2 990 289
-
X
35720401 Casteggio
24
17 063
5 688
11 375
X
35723401 Caviaga
24
24 931
18 959
5 972
X
35725101 Cellino
70
154 041
59 863
94 178
X
50081801 Collalto
70
16 115
11 375
4 740
X
50081901 Comiso
12
30 334
28 438
1 896
X
35725201 Crotone
70
1 801 093
1 658 902
142 192
X
35725401 Falconara
70
5 744 539
4 407 939
1 336 601
X
35725601 Fano
70
4 815 554
4 455 336
360 219
X
50013201 Fonte Filippo
60
3 858
-
3 858
X
35724301 Fornovo
64
113 753
87 685
26 068
X
35730201 Gagliano
75
473 972
426 575
47 397
X
157 643
52 137
105 506
35726000 Grottammare
Daily flow rate for each physical
35726010
Grottammare
70
94 794
-
delivery point:
35726001
Grottammare
54
62 849
-
70
568 766
521 369
47 397
110 246
47 397
62 849
35726101 Hera Lacinia
35167700 Larino
Daily flow rate for each physical
35167701
Larino
60
94 794
-
delivery point:
35727601
Sinarca
64
15 451
-
35730301 Mazara/Lippone
50071201
20
Medicina (from 1st November to 31st March)
Medicina (from 1st October to 31st October and from 1st April to 30th September)
24
X
X
X
X
X
18 959
18 959
-
X
104 274
75 836
28 438
X
83 419
75 836
7 584
X
35728601 Metaponto
60
36 259
36 259
-
X
35852201 Monte Alpi
75
3 118 735
3 118 735
-
X
35728501 Montecosaro
54
3 858
-
3 858
X
35724101 Montenevoso
24
35801601
Muzza (from 1st November to 31st March)
Muzza (from 1st October to 31st October and from 1st April to 30th September)
12
5 688
5 688
-
X
113 753
94 794
18 959
X
91 003
91 003
-
X
50001301 Noto
75
8 683
-
8 683
X
50045101 Ortona
70
236 986
-
236 986
X
18 959
18 959
-
X
X
35721401 Ovanengo
58 (#)
35721601 Piadena Ovest
24
35726700 Pineto
7 716
-
7 716
1 625 724
1 104 355
521 369
Daily flow rate for each physical
50003701
Pineto
70
663 561
-
delivery point:
35726701
Pineto
54
962 163
-
325 145
132 712
-
35728400 Pisticci A.P./B.P.
Daily flow rate for each physical
35728401
Pisticci alta pressione
60
247 413
delivery point:
35726801
Pisticci bassa pressione
X
X
192 433
X
24
77 731
-
35728901 Poggiofiorito
60
23 699
14 219
9 479
X
35721701 Pontetidone
12
6 825
1 896
4 929
X
50013101 Quarto
12
14 788
11 375
3 413
X
35721901 Ravenna Mare
70
2 531 010
2 531 010
-
X
473 972
379 178
94 794
X
379 178
379 178
-
X
31 149
50086901
Ravenna Mare Lido Adriano (from 1st November to 31st March)
Ravenna Mare Lido Adriano (from 1st October to 31st October and from 1st April to 30th September)
24
35727100 Reggente
X
84 045
52 895
Daily flow rate for each physical
35727110
Reggente
70
75 362
-
delivery point:
35727101
Reggente
64
8 683
-
50070201 Rivolta d'Adda
24
66 356
9 479
56 877
X
35727201 Roseto/T.Vulgano
64
369 698
317 561
52 137
X
35722201 Rubicone
70
1 440 875
1 260 765
180 109
X
35727301 San Benedetto T.
54
X
35728100 S. Giorgio M.
X
X
13 271
13 271
-
242 200
75 836
166 364
Daily flow rate for each physical
35728110
S. Giorgio M.
70
218 027
-
delivery point:
35728101
S. Giorgio M.
54
24 173
-
65
11 849
9 953
1 896
X
151 671
151 671
-
X
35728001 S. Stefano M.
35722401
Santerno (from 1st November to 31st March)
X
51 853
51 853
-
X
35729801 Settefinestre/Passatempo
70
52 137
52 137
-
X
35729701 Sinni (Policoro)
50
42 657
28 438
14 219
X
35722801 Soresina
24
34 126
33 178
948
X
182 005
151 671
30 334
X
145 035
145 035
-
X
35722901
Santerno (from 1st October to 31st October and from 1st April to 30th September)
24
X
Spilamberto B.P. (from 1st November to 31st March)
Spilamberto B.P. (from 1st October to 31st October and from 1st April to 30th September)
12
35727701 Torrente Tona
64
2 474
-
2 474
X
35723701 Trecate
55
68 252
42 657
25 594
X
2 844
2 844
-
X
35814801 Vittorio V. (S. Antonio) (§)
5
Notes:
(§) Transportation service on interruptible basis, conditionated upon the presence of a physical outflow from the Snam Rete Gas network to the redelivery point of Vittorio Veneto (code 34569001)
(#) The delivery pressure will become 75 barg when a new network configuration will be completed
(*) The provision of information in units different from those set forth in Network code is carried out in compliance with the provisions of Regulation No. 715/2009. In case of any inconsistency, of whatever nature, related to the usage of
such units, the units indicated in the Network code shall prevail.
Page 4 of 4