LAV front-end board test Francesco Gonnella, Mauro Raggi Photo Veto Working Group 1 April 2014 Francesco Gonnella - Laboratori Nazionali di Frascati 1 LAV front-end electronics LAV electronics channel working principle to analog sum LVDS Low threshold Split Amp 6x Compare To TDC High threshold LVDS Clamp To TDC Split the input signal into two copies: 1 copy to comparator + 1 copy to analog sums Clamp the signal preserving its width, wide dynamical range is expected (MIP 70 MeV ~ 10 mV, high energy γ ~ 1V) Amplify the signal and compare with 2 thresholds Each threshold is independently adjustable up to 250 mV Produce an LVDS signal and send the signal to the digital read out board Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 2 Test setup Hardware setup Hardware layout x2 x 16 32 ch 32 ch x 16 TDC CAEN V1190B VME VME Bridge V1718 Linux PC GPIB programming Software flaw chart repeat n times Repeat n’ times repeat n times Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 3 Efficiency step-plot Threshold = 10 dac unit Threshold = 20 dac unit Threshold = 30 dac unit Threshold = 50 dac unit Threshold = 100 dac unit Threshold = 350 dac unit Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 4 Problems in some step-plots Threshold = 10 dac unit Threshold = 20 dac unit Threshold = 30 dac unit Threshold = 50 dac unit Threshold = 100 dac unit Threshold = 350 dac unit Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 5 Calibration test From every step-plot the 95% efficiency value is extrapolated obtaining a calibration line, like this: Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 6 Calibration slope Slope very stable in “good” channels Channel with different slope (i.e. amplification) were discarded (wrong resistor value) Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 7 Time resolution G=3, 26 boards G=6, 67 boards Noisy channels Time resolution has improved thanks to low-noise power supply. Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 8 Threshold offset G=3, 26 boards G=6, 67 boards Threshold offset are all below 7 mV, below 6 with a smart choice of high and low threshold Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 9 Conclusions We have successfully tested 67/90 LAV-FEE boards Faulty mezzanines and motherboards sent to repair 65 boards for stations A1-A10 delivered to ECN3 this morning The first 8 stations will be equipped and tested with cosmic rays during the next two weeks Tests will make use of the complete NA62 trigger chain with trigger-primitive generated by LAV itself Francesco Gonnella - Laboratori Nazionali di Frascati 1 April 2014 10 Thank you for your attention [email protected] 1 April 2014 11