NNfC monthly admin committee meeting Dry Etch and Thin films bay Oct, 7th, 2014 Tool issues • DRIE update: • September 11th-18th extensive process work done (~45 samples) to re-qualify the tool for the 4-inch chuck. • SPTS does not have much experience with 4-inch escchuck machines (all 4-inch tools use a mechanical clamp). • All five base recipes were significantly modified. • Continue to have profile issue with high etch rate recipe (>25um/min). Need to replace the coil RF feed through (damaged in June ‘14). High etch rate recipe requires high coil power … currently limited to 3500W due to damaged part … to be replaced during AMC. 2 September 17th, 2014 Process B HF (>25um/min recipe) profile needs improvement – Pressure sensor samples Center edge edge edge Uniformity optimization – Sept 18th, 2014 Process A HF 6-7um/min @ 30C 1 3min30sec 2 3 Etch depth =27.7/29.37/29.7/29.3/27.55um Mean=28.7um Etch rate=8.2um/min (>300um feature) Unif. = 3.74% 4 5 Process A LF 3-4um/min 1:1@30C 1 2 3 4 5 Etch time = 6 mins Etch depth =23.3/25.9/26.5/25.3/23.1 um Mean= 24.8um Etch rate=4.95 um/min (>300um feature) Unif. = 6.8% Tool issues • eBeam deposition: • Both guns no operational. Most of the depositions qualified on 15cc crucible. • Gold consumption continues to be a challenge ... starting September we will be charging users for precious metal usage – Au, Pd, Pt, Ag e.g. 200nm gold consumes ~ 3.5g of gold !! • Changing policy for depositions >150nm need approval (Twiki updated). • Sputter tools: • No issues in September. 5 25 E-BEAM EVAPORATION Au USAGE CHART AS OF 30th Sep 2014. Weight in grams. 20 15 10 5 0 Feb: Mar: Apr: May: Jun: Jul: Aug: Sep: Oct: Nov: Dec: Jan: Feb: Mar: Apr: May: Jun: July: Aug: Sep: 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 Borrowed from RD (g) 15.12419.994 Given to RD (g) Used for depositions (g) 1.05 1.797 5.183 1.6 2.24 1.2 16.03814.876 5.001 0.181 0 6.885 1.483 1.901 8.244 7.959 6.134 7.614 7.605 3.195 17.82319.792 9.1 23.721 Equipment Utilization Chart- Office hours 200 Sputter Coater1 Sputter Coater2 E-beam Evaporator Anelva Sputter Thermal Evap. PECVD DRIE RIE-Fl RIE-Cl JunJulyAugSep JunJulyAugSep JunJulyAugSep JunJulyAugSep JunJulyAugSep JunJulyAugSep JunJulyAugSep JunJulyAugSep JunJulyAugSep 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Unavailable 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Downtime 1 4 0 0 83 27 72 54 6 0 0 0 0 4 0 12 0 0 0 16 40 14 16 0 0 12 52 0 0 0 0 0 0 0 0 0 Not Used 99 86 13 78 50 12 93 63 13 12 12 11 12 12 14 11 37 0 7 29 10 11 11 11 28 12 28 16 16 8 4 24 48 32 28 36 Used 80 90 44 10 47 30 15 63 37 58 58 70 58 50 35 56 14 18 17 13 31 21 51 62 15 15 10 16 16 17 17 15 13 14 15 14 180 160 Total hrs 140 120 100 80 60 40 20 0 Total Equipment Utilization Chart- September 2014 600 500 Total hrs 400 300 200 100 0 Total pecvdpecvdnon office office hrs hrs DrieDrienon office office hrs hrs rie flrie flnon office office hrs hrs rie clrie clnon office office hrs hrs sputtersputter 1- 1- non office office hrs hrs sputtersputter 2- 2 - non office office hrs hrs E-beam E-beam evptrevptrnonoffice office hrs hrs 180 540 180 540 180 540 180 540 180 540 180 540 180 540 RFAnelvaEquip Sputteri1- non ng- office office hrs hrs Therma Therma l l Evapor Evapor atoratornon office office hrs hrs 180 540 180 540 Unavailable 0 180 0 180 0 180 0 180 0 180 0 180 0 180 0 180 0 180 Downtime 0 0 54 0 0 0 12 0 16 80 0 0 0 0 0 0 0 0 Not Used 78 348 63 345 110 354 112 348 29 167 118 345 16 336 24 346 36 342 Used 102 12 63 15 70 56 135 113 62 164 24 156 14 144 18 6 12 15 MTRDC project progress • Unit process development started in Aug. – Key challenges in eChannel RIE, Au-seed layer, gold plating, wafer bonding and dicing. • Direct write one one wafer to start structural learning. Sadanand Deshpande, NNFC 9 Thank you !