Riunione dei Responsabili e Senior INFN
Some news on Pixel Upgrade
• Pixel TDR
- Good progress in write up
- Timeline (see next slide): first version to be sent to LHCC referee in June
- INFN Gruppo I presentation on Pixel TDR planned on 16-17 July
• Preliminary Money Matrix with draft contribution from agencies presented to
last October RRB. Update April 2012 RRB.
Pixel Project covered
- INFN Pixel contribution 1.4 MCHF
• Sharing of Pixel Upgrade Responsibilities
- Discussion well advanced with the Pixel Management Board
April will be crucial with several key technical and managerial
discussions to take place with a final internal Review 25th of April.
G.M. Bilei
2
CMS Upgrade Money Matrix
Detector‐wide items
Common Fund
Austria
Belgium‐FNRS
Belgium‐FWO
Brazil
Bulgaria
CERN
China
Colombia
Croatia
Cyprus
Egypt
Estonia
Finland
France‐CEA
France‐IN2P3
Germany‐BMBF
Germany‐DESY
Greece
Hungary
India
Iran
Ireland
Italy
Korea
Mexico
New Zealand
Pakistan
Poland
Portugal
RDMS ‐ DMS
RDMS ‐ Russia
Serbia
Spain
Switzerland (ETHZ,PSI,UNIV)*
Taipei
Turkey
United Kingdom
USA (DOE‐HEP, NSF)
USA (DOE‐NP)
Grand Total
22
16
16
17
8
80
10
3
7
5
3
4
14
15
53
62
39
15
10
29
6
173
21
11
2
2
15
7
21
61
3
49
38
15
18
56
440
22
1388
1.6%
1.2%
1.2%
1.2%
0.6%
5.8%
0.7%
0.2%
0.5%
0.4%
0.2%
0.3%
1.0%
1.1%
3.8%
4.5%
2.8%
1.1%
0.7%
2.1%
0.4%
0.0%
12.5%
1.5%
0.8%
0.1%
0.1%
1.1%
0.5%
1.5%
4.4%
0.2%
3.5%
2.7%
1.1%
1.3%
4.0%
31.7%
1.6%
100.0%
Muon DT
Muon RPC
Beam Instrumentation
DAQ
Trigger
Magnet power and cryo
Infrastructure
Test Beam Facilities Upgrade
Safety systems upgrade
Electronics Integration
Engineering Integration
5,817,000
1,990,000
5,570,000
2,200,000
4,220,000
1,540,000
6,700,000
4,600,000
1,330,000
6,315,000
610,000
964,000
1,575,000
3,666,000
68,846
592,797
2,814,673
271,885
429,667
701,997
1,633,981
1,200,000
236,000
270,000
3,000,000
500,000
500,000
10,000
200,000
500,000
3,500,000
1,500,000
500,000
1,000,000
200,000
11,500
11,500
150,000
167,153
420,000
130,000
600,000
1,600,000
1,200,000 XXXXXXX
35,000
350,000
600,000
100,000
100,000
612,000
XXXXXX
XXXXXXX
495,000
XXXXXXX
XXXXXX
720,000
XXXXXXX
1,400,000
1,000,000
350,000
400,000
345,000
800,000
500,000
400,000
1,400,000
500,000
1,300,000
264,000
3,800,000
1,000,000
XXXXXXX
100,000
500,000
4,500,000
5,817,000
2,000,000
5,570,000
18,100,346
8,112,000
2,100,000
7,570,000
2,043,153
3,611,000
500,000
250,000
700,000
1,500,000
3,000,000
5,000,000
6,811,500
126,000
592,797
5,240,673
126,000
406,885
929,667
927,997
2,633,981
G.M. Bilei
1,268,846
236,000
270,000
0
0
10,500,000
700,000
10,000
200,000
23,000
150,000
167,153
585,000
0
1,750,000
2,212,000
1,200,000
0
0
1,215,000
0
0
2,750,000
400,000
0
0
1,145,000
0
500,000
900,000
2,700,000
0
264,000
3,800,000
1,000,000
100,000
2,502,000
21,587,000
0
58,134,999
Total Upgrade Due (incl. CF)
Muon CSC
17,350,000
Common Fund (CF)
HF ‐ Phototubes
PhD # PhD %
HCAL
Institute FA
Common Fund (CF) Items
Pixel Tracker
Beam/DAQ/Trigger
Total expected (projects)
Subdetector‐specific Upgrades
6,445,000
102,154 1,021,494
74,294
742,905
74,294
742,905
78,937
789,336
37,147
371,452
371,470 3,714,524
46,434
464,316
13,930
139,295
32,504
325,021
23,217
232,158
13,930
139,295
18,573
185,726
65,007
650,042
69,651
696,473
246,099 2,460,872
287,889 2,878,756
181,091 1,810,831
69,651
696,473
46,434
464,316
134,658 1,346,515
27,860
278,589
0
0
803,303 8,032,659
97,511
975,063
51,077
510,747
9,287
92,863
9,287
92,863
69,651
696,473
32,504
325,021
97,511
975,063
283,246 2,832,325
13,930
139,295
227,525 2,275,146
176,448 1,764,398
69,651
696,473
83,581
835,768
260,029 2,600,167
2,046,032 20,459,365
102,302 1,022,968
6,445,000 64,447,000
3
Pixel TDR timeline
Month Action
Mar
• Target presentation of final document to
LHCC in September 2012
– with draft sent 1-2 months earlier.
First draft.
Not for circulation
outside CMS
Apr
CMS Upgrade
Project Conceptual
Design Review.
• Presently we have first draft 70% complete
May
• Some strategic points to be worked into the
document.
Second draft.
Not for circulation
outside CMS
Jun
Physics case
conclusion.
Jul
Final draft of
document.
(Send to LHCC.)
Aug
Final checks and
signoff in Ph1 MB
Sep
Final signoff and
presentation to
LHCC.
4
• In April will internally review all strategic
and technical points of the project going in
the TDR as part of CMS Conceptual Design
Review (Apr. 25th)
• Gruppo I discussion in July
G.M. Bilei
INFN Draft Contribution profile
G.M. Bilei
Phase1b proposed preliminary breakdown
G.M. Bilei
6
INFN Pixel Upgrade TDR list
Pixel TDR will have two separate lists
1. CMS author list
2. Pixel Upgrade participants intending to
contribute to the project (not only
Construction, but also simulations,
software on & off line, DCS etc.)
This list includes Technicians, Engineers,
Physicists.
Here the list I have got from you.
I will provide it to Salvatore.
If you have comments or changes let
me know.
G.M. Bilei
7
Genova Totem
Alcuni membri del gruppo INFN TOTEM Genova hanno contattato Nadia
per ingresso in CMS.
Interesse in Fisica, Elettronica ed Hardware.
In particolare sono interessati al progetto di Upgrade dei Pixel.
E. Robutti, M. Lovetere, P. Musico ed altri.
Totale ~ 5 FTE
Abbiamo parlato con Nadia ed entrambi concordiamo ci sembri una buona
novità e che questa interesse debba essere incoraggiato.
Opinioni?
G.M. Bilei
8
Selex Offerta Bumb Bonding
Richiesta di sblocco SJ di 25 Ke su
Pisa inviata ai referee.
Domani meeting con Nadia ed i referee.
Nadia mi ha detto che ha parlato con i referee
e non dovrebbero esserci problemi.
Urgente capire con Selex i costi di produzione
finale. Una offerta inviata fine dello scorso
anno non sembrava essere soddisfacente.
Sono in corso contatti /negoziazioni per
avere condizioni migliori.
G.M. Bilei
9
Test Beam Frascati
Prossimo possibile periodo:
30 Aprile - 4 Maggio 2012
Interesse ad organizzare una attivita`
comune di test modulo pixel su fascio?
In caso positivo, organizzare un piccolo
sforzo e definire programma di lavoro.
http://www.lnf.infn.it/acceleratori/btf/
G.M. Bilei
10
Some points to follow up
Pixel Upgrade
• ROC wafer from Roland and testing in PSI (first) and Padova (later)
This is the only element we don’t have control yet.
Roland promised the wafers several time, need to follow up with him.
• Pixel Simulation: increase INFN contribution. 1 post-doc available
Operation/DPG/POG
• Define Technical/Engineering support for 2013 LS1 from Tracker and INFN
In particular in order to define funding request for 2013, by June we should
define the support that we could provide compatibly with other activities.
• Possibly increase INFN contribution in the area of Radiation Damage
studies and simulation.
• Possibly improve the way we contribute to Operation, DPG, POG tasks
and get toward an organized contribution from INFN.
Tracker Upgrade
• INFN R&D funding to support activities for the preparation the proposal for
Tracker Upgrade
• INFN Support Track Trigger Simulations and better integrate them with Trigger
Hardware activities
G.M. Bilei
11
Next Tracker Meetings
Next meetings
Molti MB Pixel Upgrade meeting previsti prossimo mese
• Tracker week 23-27 Apr.
Conceptual Design Review 25 Apr
• CMS Upgrade week 21-25 May
• Pixel Upgrade Grindelwald (CH) 28-31 Aug.
Fatemi sapere numero stimato dei partecipanti.
Tuesday 28 am Workshop registration
Tuesday 28 pm Working Group parallel session (e.g. Cooling in parallel with Test beam)
Wednesday 29 am Working Group parallel sessions (e.g. Simulations in parallel with BPIX module production)
Wednesday 29 pm Plenary Phase 1 meeting - Part 1
Thursday 30 am Plenary Phase 1 meeting - Part 2
Thursday 30 pm Off-site visit (e.g. mountain location).
Friday 31 am Phase 1 Management Board (restricted) in parallel with Informal Working meetings.
Friday 31 2pm Close of meeting.
G.M. Bilei
12
INFN Next meeting?
• If useful we might consider to have a second INFN workshop someplace else
(autumn?)
• Continue to hold short (2 two hours) INFN meetings at CERN during Tracker
weeks to touch down most important topics with short presentations.
• Continue to hold about 1.5 hour meeting bi-weekly or when urgently needed.
Grazie agli speakers ed a tutti i partecipanti
G.M. Bilei