Stato dell’esperimento MEG •Stato dell’esperimento (LXe, T.C., Trigger a parte) • Schedule • Budget • MoU • Richieste finanziarie A. Baldini 23 sett CSN I Lecce 1 Detector overview “espulsione” dei positroni FWHM resolutions • Liquid Xe e.m. calorimeter • Magnetic spectrometer • Timing counter A. Baldini 23 sett CSN I Lecce ( Eγ , pγ / Eγ , t γ ) pe ( pe / Ee , te ) 2 Ee E γ eγ t eγ 4 π 0.7 0.9% 4% 17 20.5 mrad 150 ps 9% La collaborazione INFN & Genova University S. Dussoni, F. Gatti, P. Ottonello, D. Pergolesi, R. Valle INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, G. Palama’, M. Panareo INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo’, M. Rossella INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, M.Grassi, F. Morsani, D. Nicolo’, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli INFN Roma I D. Zanello ICEPP, University of Tokyo T. Mashimo, S. Mihara, T. Mitsuhashi, T. Mori, H. Nishiguchi, W. Ootani, K. Ozone, T. Saeki, R. Sawada, S. Yamashita KEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. Yoshimura Osaka University Y. Kuno Waseda University T. Doke, J. Kikuchi, H. Okada, S. Suzuki, K. Terasawa, M. Yamashita, T. Yoshimura PSI, Villigen J. Egger, P. Kettle, H. Molte, S. Ritt Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov A. Baldini 23 sett CSN I Lecce 3 Magnet: Construction finished! • Construction was finished! • Excitation test has started on June. Superconducting coil in cryostat Potentiometer A. Baldini 23 sett Support frame CSN I Lecce 4 Compensation coils Jan 2002: COBRA Magnet schedule 2002 Design Winding & Cryo. 2003 Ass. 2004 2005 Test Platform Deliv. Test PSI Field Measurement Jan A. 2003: Baldini 23 sett CSN I Lecce Design Manufactoring 5 Assembly Test Milestone Platform design status (June 24th) A. Baldini 23 sett CSN I Lecce 6 Area Layout Trigger & DAQ optional wall electronics HV small rail LXe storage A. Baldini 23 sett CSN I Lecce compressor 7 “Z-Branch” Measurements April/May2003 Measurements: Phase B – post Triplet 2 & Collimator Phase C – post Solenoid Several unexpected problems encountered & Solved !!! A. Baldini 23 sett CSN I Lecce 8 Phase C Post Solenoid Trip. µ++ e 1 WIEN Colli. Triplet 2 µ+ Solenoid e+ Filter Remember !!! PSC only a Test Solenoid PSC-Solenoid 20cm Bore Beam Line 32 cm Bore Single Node SNM Integrated Rate After Solenoid 4cm Tg.E @ 1800µA Nµ~6.1·107 µ+/s (1.1·108 µ+/s 6cm Tg.) Beam Spot: Double Node DNM Previous Excitation Curve DNM confirmed DNM focus Z0 14.53 A Previous U-Branch 14.56 A A. Baldini 23 sett CSN I Lecce σX ~ 5.3 mm σY~ 6.5 mm Transmission Factor Solenoid TSol= 71 % With larger Bore i.e. BTS T>71% 9 Degrader & Stopping Distribution Measurements Target Thickness vs. NaI Rate Michel Range Curve using NaI: e+ Foils CH2 at focus µ+ Solenoid AIR VAC CH2 Tg Fix Degrader Var. Tg R ~ 870 µ CH2 Degrader Target Target 88% stopped in 400µ CH2 Tg. Measurement Simulation Fix Degrader 600 µ Geant say 580µ Nearly all Stopped in 400µ A. Baldini 23 sett CSN I Lecce Gives RMean = 1150µ Equiv GEANT + TRIM 88% STOP in 400µ Tg !!! 10 Beam Jan 2002 2002 2003 2004 2005 Studies Quadrupoles Solenoid Target Jan A. 2003: Baldini 23 sett CSN I Lecce Design Manufactoring 11 Assembly Test Milestone Drift chambers •Prototypes of cathodes supporting structure •Print foils meeting the experimental requirements found •Tests at M1: drift time measurements and cathodes readout •First studies on pattern recognition (Pisa + Lecce) A. Baldini 23 sett CSN I Lecce 12 Example of reconstructed tracks A. Baldini 23 sett CSN I Lecce 13 Algorithm performances Michel positrons in the solid angle covered by the spectrometer or isotropically over the whole detector; no significant differences; positron momentum > 30 MeV; # of correctly reconstructed tracks Efficiency = ——————————————— # of generated tracks Mixing Mean number of Efficiency on Efficiency on mixed tracks first turn second turn 1 5 5 10 10 98.2 95 95.8 91 92.1 98.5 98.4 98.1 97.5 97.5 None Poisson Fixed Poisson Fixed A. Baldini 23 sett CSN I Lecce 14 Jan 2002: Positron Tracker 2002 2003 2004 2005 Medium Prototype Charge division & Cosmics Full Prototype FP FP Full Detector (18 DC) A. Baldini 23 sett CSN I Lecce Design Manufactoring 15 Assembly Test Milestone Timing Counter Jan 2002: 2002 2003 2004 PMT Evaluation 2005 PMT Design •Tests of fine mesh PMTs (even in magnetic fields) and of counter prototypes (M1) going on •Good solution for transverse detector: scintillating fibers + APDs A. Baldini 23 sett CSN I Lecce Design Manufactoring 16 Assembly Test Milestone Photon Detector schedule 2002 Large Prototype 2003 Beam Test 2004 Beam Test 2005 Engineering runs Vessel Design Manufactoring PMT Delivery + Testing Refrigerator Manufactoring Assembly & Test Assembly Test Assembly Liq. Purification A. Baldini 23 sett CSN I Lecce Design Manufactoring 17 Assembly Test Milestone Electronics •Need of at least two prototypes (both for the trigger and the DRS) •First trigger prototype is being tested •Second DRS design is being designed A. Baldini 23 sett CSN I Lecce 18 Trigger Jan 2002 2002 2003 2004 2005 Prototype Board 2nd Prototype Full System A. Baldini 23 sett CSN I Lecce Design Manufactoring 19 Assembly Test Milestone DRS (DAQ) Jan 2002 2002 1st Prototype 2003 2004 2005 Tests 2nd Prototype Boards & Chip A. Baldini 23 sett CSN I Lecce Design Manufactoring 20 Assembly Test Test Milestone Jan 2002: Complete Detector 2002 2003 2004 2005 Platform Engineering Runs Detector Integration •Start of the experiment in 2006 •All possible engineering runs in 2005 A. Baldini 23 sett CSN I Lecce Design Manufactoring 21 Assembly Test Milestone Calorimeter PMT Lxe Vessel Various items Xe system Cobra Magnet 1756 845 400 271 369 1175 Timing counter Trigger 700 400 Drift Chambers Muon transport DAQ Electronics Detector HV 149 184 405 172 39 Budget (K€) 6865 Japan Italy PSI 2529 2200 1299 Approved in april Approved in may MoU 6028 Running costs - 2008 1303 2003-2005 Deficit per 350 PMT A. Baldini 23 sett CSN I Lecce 22 Stime di costo aggiornate LXenon Trigger • PMT(300) 550 K€ • Secondo prototipo 20 K€ • Criostato 400 K€ • Sistema completo 430 K€ Timing counter Splitters • APD + fibre (interno) 160 K€ • PMT (100: esterno) 315 K€ • Sistema completo TOTALE 115 K€ 2190 K€ • Scintillatore 50 K€ • Calibrazione 100 K€ 1095 K€ 50 K€ 545 K€ 675 K€ 550 K€ • Meccanica A. Baldini 23 sett CSN I Lecce 23 Preventivo globale A. Baldini 23 sett CSN I Lecce 24 Preventivo 2004 Tot 38 315 66 Settembre 2003 • PMT LXe 20 261 • APD 80 K€ Prima meta’ 2004 • Scint T.C. 50 K€ • PMT T.C. • fibre • Criostato • Splitters 1 315 K€ 80 K€ Seconda meta’ 2004 400 K€ • Trigger 1 50 K€ • Calibr. T.C. 845 K€ • Mecc. T.C. 215 K€ 100 K€ 65 K€ 380 K€ A. Baldini 23 sett CSN I Lecce 2536 Proposta ... 550 K€ 680 K€ 1836 25 2005 • Trigger 2 • Splitters 1 215 K€ 50 K€ 265 K€ Milestones 2004 A. Baldini 23 sett CSN I Lecce 26