LCG Service Challenge at INFN Tier1 Brief site report. T.Ferrari, L.d.Agnello, G.Lore, S.Zani INFN CNAF LCG Network WAN • Wan Access available now up to 2 Gb/s (Via GARR) • End of March 10 Gb/s (GARR roadmap) • End of ’05 Dark Fiber 10Gb/s or more (GARR roadmap) LAN • Extreme Summit 400 (48xGE+2x10GE) dedicated to Service Challenge. Servers 1Gb CERN 2->10Gb GARR Summit 400 GARR Roadmap GARR-G Fase 3 Mar 2005 CERN CERN GARR-G Fase 4 Dec 2005 CO CO MI MI 4MI MI1 2 PV 3 TO Frank furt Zuric h PD TS PD TS VE BO GE BO GE TO VE Ljubljana MI1 MI 4MI MI 2 PV 3 INFN Tier1 INFN Tier1 FI FI PI PI AN AN PG PG RM 2 RM 2 AQ RM 1 FR A BA AQ RM 1 FR A BA NA MT NA LE MT LE CA CS CA CS GigaPOP Mega POP 2.5Gbps SDH/WL 10Gbps SDH/WL Dark Fibre/DWDM PA GigaPOP Mega POP 2.5Gbps SDH/WL ME CT EumedConnect 10Gbps SDH/WL Dark Fibre/DWDM PA ME CT EumedConnect LCG Servers and storage Servers • Imminent delivery of 11 SUN Fire V20 Dual Opteron (2,2 Ghz) – 2x 73 GB U320 SCSI HD (10.000 RPM) – 2x Gbit Ethernet interfaces – 2x PCI-X Slots Storage • For the very first tests we plan to use the internal disks. • We can also provide different kinds of Fiber Channel SAN attached devices (Infortrend Enstor, IBM FastT900,..).