MULTIDISCIPLINARY
ENGINEERING
SERVICES
1
CONSORZIO SIM OVERVIEW
With the purpose to provide our Clients
for a complete range of engineering
services, in 1997 N° 4 specialized
Engineering Companies joined together
allowing the born of Consorzio SIM.

In 2005 a fifth company joined to original
four and as of today Consorzio SIM is a
Multidiscipline Engineering organization
accounting of about 68 qualified persons
(including administrative personnel).

2
CONSORZIO SIM OVERVIEW

In 2000 the company has been certified according to UNI-ENISO 9001 (1994)

In 2003 the company renewed the certification according to
UNI-EN-ISO 9001 (2000)

In 2005 another firm was added into Consorzio SIM (now there
are 5 firms and 4 departments)

In 2007 an agreement of collaboaration has been signed
between Consorzio SIM and Technip Italy
3
ORGANIZATION CHART
Directorate General
Chairmanship
Administrative Office
Quality Management System
Procurement Unit
Engineering Unit
Technical Office
Piping Dpt.
Business Unit
Information Systems
Civil Dpt.
Instrument & Automation Dpt
Electrical Dpt.
Project Manager
Piping Project Leader
Civil Project Leader
I&A Project Leader
Electrical Project Leader
Senior Designer
Structural Engineer
Senior Designer
Senior Designer
Junior Designer
Senior Designer
Junior Designer
Junior Designer
4
Junior Designer
CONSORZIO SIM OVERVIEW

Our designers staff
Mechanical Dpt.
Piping
Stress
Engineers
Civil
Dpt.
I. & A.
Dpt.
Electrical
Dpt.
2
4
3
5
Specialist
8
PDS Designers
9
7 (2 for U/G)
2
2
CAD Designers
5
2
3
3
16
9
8
Total
8
30
5
CONSORZIO SIM OVERVIEW

Our staff
Potenzial
(h/y)
Mech.
Dpt.
Civil
Dpt.
I. & A.
Dpt.
Electr.
Dpt.
Total
58.000
30.000
17.000
15.000
120.000
SIM's Potenzial
Electr. Dpt
I.&A. Dpt.
Mech. Dpt
Civil Dpt.
I.&A. Dpt.
Electr. Dpt
Civil Dpt.
Mech. Dpt
6
CONSORZIO SIM OVERVIEW

Our experience in engineering activities
Over 20
years
From 10 to
20 years
From 5 to
10 years
Less 5
years
10%
60%
20%
10%
Less 5 years;
10%
Over 20 years;
10%
Over 20 years
From 10 to 20 years
From 5 to 10 years
From 5 to 10
years; 20%
From 10 to 20
years; 60%
Less 5 years
7
CONSORZIO SIM OVERVIEW

TECHNICAL CAPABILITIES

Feasability studies

Front-end engineering

Detailed engineering


Procurement, expediting and inspection
(for I. & A. Dpt)
Site Survey
8
CONSORZIO SIM OVERVIEW

APPLICATION FIELDS
Petroleum first treating plants and
transportation

Petroleum Refinery Plants

Petrochemical Plants

Chemical and Pharmaceutical Plant


Electrical Power generation,
transportation and distribution
9
CONSORZIO SIM OVERVIEW

Hardware & Software Design Tools
 Hardware:
 N° 4 Servers (N° 2 for PDS projects)
 N° 60 Workstations (N° 24 for PDS)
 N° 1 Workstation for Smart Plant Review
 N° 5 plotters
 Software:
 Intergraph PDS, Microstation, AutoCad
 Caesar II, Triflex (Stress Analysis), Puma (Piping
MTO)
 Civil & Structural Design: STAAD PRO, SAP 2000
 Instrumentation calculation tools
 Electrical cable calculation, lighting calculation,
electrical system calculation tools
10
CONSORZIO SIM OVERVIEW

REFERENCE LIST (Main customers)

TECHNIP

Technip-KTI

SNAM (Gas & Liquid Petroleum Product Transportation)

SNAM PROGETTI (Engineering)

API (Refinery)

AGIP (Refinery And Distribution)

ENEL (Electrical Generation, Transportation And
Distribution)

RAFFINERIA DI ROMA (Refinery)

ABB S.p.A.
11
CONSORZIO SIM OVERVIEW

PROJECTS LIST
•
•
•
•
•
•
•
•
•
EXPORT REFINERY PROJECT (FEED
CONTRACT)
- JUBAIL (2007) - TECHNIP ITALY S.p.A.
YANBU ETHYLENE PLANT – YANSAB –
SABIC (2005-2006) - TECHNIP ITALY
S.p.A.
CNRL –HORIZON OIL SANDS PROJECT –
PRIMARY UPGRADE – CANADA (20052006)
TECHNIP ITALY S.p.A.
GTL ORYX – QATAR (2003-2004)
TECHNIP ITALY S.p.A.
ACETIC ACID PLANT – SABIC (20022003)
TECHNIP ITALY S.p.A.
PHU MY FERTILIZER PROJECT (2002)
TECHNIP ITALY S.p.A.
NUOVO PTA # 1 – ZHUHAI
(2001/2002)
TECHNIP ITALY S.p.A.
CAPCO - # 6 PTA PROJECT
(2001/2002)
TECHNIP ITALY S.p.A.
CENTRALE A BIOMASSE DI CUTRO
(2001/2002)
ENELPOWER S.p.A.
• ISLA REFINERY UPGRADING
PROJECT –
SRU UNIT – UNITS 300/700 (2001) - KTI S.p.A.
• DESOLFORAZIONE GASOLIO FASE 2 –
RAFFINERIA DI MILAZZO (2000/2001)
TECHNIP ITALY S.p.A.
• QVC VINYL PROJECT – QATAR (1999/2000)
TECHNIP ITALY S.p.A.
• IMPIANTO PRIMARY PACLITAXEL –
INDENA (1999) - TECHNIP ITALY S.p.A.
• MIDOR REFINERY – UNIT 02-03-04 (1999)
TECHNIP ITALY S.p.A.
• FIELD INTEGRATION – NAPHTA REFORMER
COMPLEX – APC – EGYPT (1998/1999)
TECHNIP ITALY S.p.A.
• NAPHTHA REFORMER COMPLEX – APC –
ALEXANDRIA – EGYPT (1998/1999) –
TECHNIP ITALY S.p.A.
• CONDENSATE PROCESSING PLANT – DUBAI
– TANKAGE AREA (1998) - TECHNIPETROL
S.p.A.
12
PROJECT MODEL
13
PROJECT MODEL
14
PROJECT MODEL
15
Scarica

COMPANY INTRODUCTION