N.Bondar Report before Christmas 18.12.2008 Marathon modification • According request of the VIENER we modified all LV power supplies by installing additional diode into the Primary Rectifier for muon detector. Total number of modules -19 pc. M1 ECS cables measurement • To measure ECS cable we are using a special tool based on the pulse reflectometer idea. • Accuracy of this tool ~10cm 5 ns. • The table of the results is in the E-Log. Special tools was designed and made by Sasha Granik Pincers for plugging ground tail Special tools was designed and made by Sasha Granik Pincers for unplug connectors Comments to results Situazione cavi M1C 31/10/08 SB Num. 126 Lunghezza effettiva cavi Retested with the pulse reflectometer delta (ns) @20cm/ns delta (ns) @19.76cm/ns measured delay (ns) -0.01 -0.05 -0.05 73 14.48 -0.03 -0.15 -0.15 73 14.40 14.43 -0.03 -0.15 -0.15 73 3 14.38 14.43 -0.05 -0.25 -0.25 73 1 4 14.53 14.43 0.10 0.50 0.51 73 EC-M1C-15A2-2 1 5 14.40 14.43 -0.03 -0.15 -0.15 73 EC-M1C-15A2-3 1 6 14.38 14.43 -0.05 -0.25 -0.25 73 EC-M1C-15A2-4 1 7 14.36 14.43 -0.07 -0.35 -0.35 73 EC-M1C-16A2-1 1 8 14.51 14.53 -0.02 -0.10 -0.10 74 EC-M1C-16A2-2 1 9 14.47 14.33 0.14 0.70 0.71 73 EC-M1C-16A2-3 1 10 14.40 14.38 0.02 0.10 0.10 73 EC-M1C-16A2-4 1 11 14.39 14.33 0.06 0.30 0.30 73 cavo SB slot I2c Chan len (m) length (m) EC-M1C-15A1-1 1 0 14.47 14.48 EC-M1C-15A1-2 1 1 14.45 EC-M1C-15A1-3 1 2 EC-M1C-15A1-4 1 EC-M1C-15A2-1 delta (m) Some results have a very good agreement with Valerio’s table SB Num. 120 Lunghezza effettiva cavi Retested with the pulse reflectometer Cable SB slot I2c Chan Len ( meters ) lungh (m) Len. (m) delta (m) EC-M1A-17A2-1 2 0 19 16.68 16.26 0.42 82 2.1 2.13 EC-M1A-17A2-2 2 1 19 16.71 16.41 0.30 83 1.5 1.52 EC-M1A-17A2-3 2 2 19 16.10 15.82 0.28 80 1.4 1.42 EC-M1A-17A2-4 2 3 19 16.69 16.36 0.33 83 1.65 1.67 EC-M1A-18A1-1 2 4 20 17.07 16.76 0.31 85 1.55 1.57 EC-M1A-18A1-2 2 5 20 16.99 16.71 0.28 85 1.4 1.42 EC-M1A-18A1-3 2 6 20 16.96 16.71 0.25 85 1.25 1.27 EC-M1A-18A1-4 2 7 20 17.08 16.76 0.32 85 1.6 1.62 EC-M1A-18A2-1 2 8 19 15.97 15.67 0.30 79 1.5 1.52 EC-M1A-18A2-2 2 9 19 15.92 15.67 0.25 79 1.25 1.27 EC-M1A-18A2-3 2 10 19 15.94 15.52 0.42 79 2.1 2.13 EC-M1A-18A2-4 2 11 19 15.73 15.47 0.26 78 1.3 1.32 Some results have offset about 1.5 ns delay (ns) delta (ns) @20cm/ns delta (ns) @19.76cm/ns SB Num. 026 Lunghezza effettiva cavi Retested with the pulse reflectometer Cable SB slot I2c Chan Len ( meters ) lungh (m) Len. (m) delta (m) delay (ns) EC-M1A-30A 19 0 27 23.04 22.1 0.94 112 4.7 4.76 EC-M1A-30B 19 1 26 21.99 21.21 0.78 107 3.9 3.95 EC-M1A-30C 19 2 25 20.71 19.87 0.84 101 4.2 4.25 EC-M1A-30D 19 3 24 20.22 18.98 1.24 96 6.2 6.28 EC-M1A-31A 19 4 27 22.60 21.61 0.99 99 4.95 5.01 EC-M1A-31B 19 5 26 21.84 20.91 0.93 106 4.65 4.71 EC-M1A-31C 19 6 25 20.95 20.02 0.93 101 4.65 4.71 EC-M1A-31D 19 7 24 19.75 19.23 0.52 97 2.6 2.63 EC-M1A-32A 19 8 27 23.06 22 1.06 111 5.3 5.36 EC-M1A-32B 19 9 26 22.02 20.96 1.06 106 5.3 5.36 EC-M1A-32C 19 10 25 20.99 20.07 0.92 102 4.6 4.66 EC-M1A-32D 19 11 24 20.55 19.18 1.37 97 6.85 6.93 Some results have very large disagreement >5 ns Also found 3 failure connectors delta (ns) @20cm/ns delta (ns) @19.76cm/ns