CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS COMITATO NAZIONALE ITALIANO 41ma Sessione Generale Cigre Parigi, 27 agosto – 1 settembre 2006 Comitato di studio C4 System Technical Performance A. Ardito (CESI) Membro italiano C.A. Nucci (Univ. di Bologna) Chairman of SC C4 Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Sintesi della ‘Technical Session’ dello SC C4 • Partecipanti: oltre il centinaio • Osservazioni generali: due ‘special reporter’ S. Pack e S. Maruvada, ognuno con due ‘preferential subject’. • Pack (PS1 e PS2) – 11 lavori con 27 domande • PS1: 9 lavori, 20 domande – 17 ‘contributions’ a 14 domande, nessun ‘contribution’ a 6 domande – 14 ‘spontaneous contributions’, • PS2: 2 lavori, 7 domande – 8 ‘contributions’ a 7 domande, nessun ‘contribution’ a 1 domanda – 9 ‘spontaneous contributions’ • Maruvada (PS3 e PS4) – 13 lavori con 31 domande • PS3: 6 lavori con 15 domande – 11 ‘contributions’ a 10 domande, nessun ‘contribution’ a 5 domande – some ‘spontaneous contributions’ • PS4: 7 lavori con 16 domande – 24 ‘contributions’ a 15 domande, nessun ‘contribution’ a 1 domanda –some ‘spontaneous contributions’ Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Sintesi della ‘Technical Session’ dello SC C4 PS1 - Performance of Power Systems against LightningOriginated Disturbances – Main Conclusions Flashover rate of transmission lines risultati di calcolo vanno interpretati con cautela. In certi casi anche i risultati del campo richiedono attenzione Lightning data (Ng, Ipeak etc,.) indispensabili per gli studi relativi alla ‘lightning performance’. Le loro distribuzioni dipendono dalle tecnologie di misura (torri di rilevamento, LLS, CFC, etc.), dal periodo di osservazione, dalla zona in cui vengono rilevati: uso ragionato e da parte di esperti. Per la risposta dei sistemi di distribuzione la discussione ha riguardato essenzialmente il trasformatore ed i modelli relativi in regime transiorio. Non è disponibile un modello generalmente accettato, e si auspica una maggiore collaborazione tra gruppi di ricerca e costruttori. Esigenza di studi più accurati per pervenire al migliore coordinamento dell’isolamento delle linee di distribuzione, soprattutto per quanto concerne la loro risposta alle fulminazioni. Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Sintesi della ‘Technical Session’ dello SC C4 PS2 - Impact of Monitoring and Diagnostics on Insulation Coordination – Main Conclusions Sono argomento di interesse crescente in tutte le parti del mondo e per tutti i componenti dei sistemi di potenza I risultati dipendono fortemente dalla adeguatezza del M+D system (MDS). E’ necessaria la definizione chiara delle interfacce tra i MDS e i componenti monitorati, così come tra i MDS dei vari costruttori/fornitori. La durata dell’osservazione è un punto critico Il coordinamento dell’isolamento può essere migliorato/ottimizzato solo in seguito lunghi periodi di osservazione. Oggi sono ancora applicati fattori di sicurezza. E’ auspicabile una nuova classificazione della severità dell’inquinamento in modo da renderla più utilizzabile e confrontabile su base internazionale. Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Sintesi della ‘Technical Session’ dello SC C4 PS3 - EMC and EMF Assessment and Mitigation of Associated Problems – Main Conclusions La caratterizzazione delle interferenze elettromagnetiche (EMI) radiate da sottostazioni con isolamento in aria (AIS) e isolate in gas (GIS) mediante misure adeguate è un passo fondamentale al fine di garantirne la compatibità elettromagnetica con i circuiti secondari e con i sistemi digitali a relé. Le tecniche di schermatura dei campi elettromagnetici prodotti dai cavi di potenza interrati EMF e dai trasformatori delle sottostazioni sono tra i punti più importanti da tenere in considerazione nella messa a punto degli standard Europei. Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Sintesi della ‘Technical Session’ dello SC C4 PS4 - Coordination of Power Quality Levels Between Customers and Various Players– Main Conclusions Qualche difficoltà nell’applicazione di IEC Standards per il coordinamento dei livelli armonici tra utility e customer nei sistemi di potenza di ampia estensione. Il monitoraggio e la valutazione degli indici di qualità per la PQ, così come definiti dal CIGRÉ WG C4.07, sono utili strumenti per migliorare l’affidabilità e la continuità del servizio delle reti di potenza Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Riunione del comitato di studio C4 • Punti essenziali discussi Partecipanti circa 40 fra Membri Esperti ed invitati. Per l’Italia erano presenti: Paola Bresesti – CESI Ricerca – Nuovo SC Secretary Sandro Corsi – CESI Carlo Alberto Nucci – Università di Bologna – Nuovo SC Chairman Il past SC Chairman P. Kundur ha menzionato quanto riportato da A. Bolza (past Chairman del TC) all’ultima riunione del TC a Interlaken: difficoltà dei NC ad allocare gli esperti nello SC C4 paper su Electra by P. Kundur e C.A. Nucci per chiarire gli scopi dello SC C4 E’ stata incoraggiata la presenza di “young experts” in Cigre activities Sono state discusse le attività dello SC, degli AG, dei WG, delle TF. Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Present CIGRE SC C4 Organization System Technical Performance Convenor : C.A. Nucci (Italy)) Secretary P. Bresesti (Itlay) Advisory Group C4.5 (set up 2002) Organisation and liaison with TGs T. Correia de Barros (Portugal) Advisory Group C4.1 (set up 2002) Power Quality R. Koch (South Africa) Advisory Group C4.2 (set up 2002) EMC J. Hoeffelman (Belgium) Advisory Group C4.3 (set up 2002) Insulation Coordination C. Neumann (Germany) Advisory Group C4.4 (set up 2002) Lightning M. Ishii (Japan) Advisory Group C4.6 (set up 2004) Power Security Assessment K. Uhlen (Norway) JWG C4.101 (1999-2006) Power Quality General Aspects Convenor : E. Gunther (USA) Joint CIRED - CIGRE WG WG C4.201 (2004-2007) EMC in HV substations and Generating Stations Convener: P. Pretorius (South Africa) WG C4.301 (2005-2007) Procedures for station and OHL insulation coordination Convenor : A. Xemard (France) WG C4.401 Lightning Convenor : C.A. Nucci (Italy) WG C4.601 (2004-2008) Power System Security Assessment Convenor : P. Pourbeik (USA) TF C4.102 (2003-2006) Voltage dips prediction tools Convenor : J.M. Velasco (Spain) JWG C4.202 (2004-2007) EMC with communication circuits LV systems and metallic structures Convenor : L.E. Juhlin (Sweden) WG C4.302 Dielectric withstand characteristics of electrical insulation Convenor : G. Gela (USA) JWG C4.402 Protection of MV and LV networks against lightning Convenor : F. Rachidi (CH) TF C4.602 Coordinated Voltage Control in Transmission Networks Convenor : N. Martins (Brazil) JWG C4.103 (2003-2006) Emission limits for disturbing loads Convenor : G. Beaulieu (Canada) Joint CIRED-CIGRE WG TF C4.203 (2001-2005) ELF field measurement and modelling Convenor : F. Deschamps (France) WG C4.303 Pollution and Environmental Influence on Electrical Performance Convener: C. Engelbrecht (NL) TF C4.403 Lightning induced overvoltages Convenor : C.A. Nucci (Italy) JWG C4.105 (2005-2008) Benchmarking of Power Quality Performances in Transmission systems: Convenor : Mark McGranaghan (US) TF C4.204 (2001-2004) Magnetic field mitigation techniques Convenor : E. Salinas (Sweden) TF C4.404 Lightning location system data Convenor : G. Diendorfer (Austria) and H. Torres (Columbia) JWG C4.106 (2005-2007) Instrument Test Protocols Convenor : Erich Gunther (US) TF C4.205 (2004-2006) Characterization of Magnetic Fields Levels Convenor : J. Hoeffelman (Belgium) TF C4.405 Lightning interception Convenor : V. Cooray (Sweden) and Takatoshi Shindo (Japan) JWG C4.107 (2005-2008) Economic Framework for Voltage Q Convenor : JL. Gutierrez Iglesias (Spain) TF C4.108 (2005-2007) Review of Flicker Objectives for HV MV and LV systems Convenor : Arlt Detmar (Germany) JTF C4.109 (2005-2007) Emission Assesment Techniques Convenor : E. De Jaeger (Belgium) JWG C4.110 (2005-2007) Equipment voltage dip immunity used in customer installations: Convenor : Math Bollen (Sweden) TF C4.406 Performance of grounding electrodes for lightning currents Convenor : S. Visacro (Brazil) Riunione del comitato di studio C4 • Advisory Group Reports AG C4.1: Power Quality (R. Koch) AG C4.2: EMC (J. Hoeffelman) AG C4.3: Insulation Coordination (C. Neumann) AG C4.4: Lightning (M. Ishii) AG C4.5: Organization and Liaison with TGs (M.T. C.de Barros) AG C4.6: Power System Security Assessment (Kjetil Uhlen) • “Feedback” dal WS on PS Stability & Control, Paris, Aug 25, 2006. • Presentazione del “TF C4.602 Final Report: Coordinated Voltage Control in Transmission Networks” (convenors: N. Martins e S. Corsi) • Programma preliminare del 2007 Symposium in Zagreb: April 18-20 “Transient Phenomena in Large Electric Power Systems, che sarà preceduto da Tutorials Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Riunione del comitato di studio C4 AG C4.1: Power Quality – Work in progress Number Title Convenor JWG C4.101 Power Quality General Aspects Erich Gunther TF C4.102 Voltage Dip Evaluation and Prediction Tools Juan Martinez JWG C4.103 Emission Assessment Techniques Germain Beaulieu JWG C4.105 Benchmarking PQ Performance: Transmission Systems Mark McGranaghan JWG C4.106 PQ Instrument Test Protocol Erich Gunther JWG C4.107 Economic Framework for Voltage Quality J. Gutierrez Iglesias TF C4.108 Flicker Objectives for HV, MV, LV Systems D. Alrt ->(Mark Hapin) JTF C4.109 Emission Assessment Techniques Emmanuel de Jaeger JWG C4.110 Voltage Dip Immunity of Equipment Used in Installations Math Bollen New Nearing completion To be terminated Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Comitato di studio C4: pubblicazioni AG 4.2: Electromagnetic Compatibility Reports published in 2005 and 2006 JWG C4.202 "EMC with communication circuits, LV systems and metallic structures“ – Convener: Lars-Erik Juhlin -TB 290: Guide for ac corrosion on metallic pipelines due to influence from ac power lines. (Electra - April 2006) -TB 266: Protection Measures for Radio Base Stations sited on Power Liner Towers (Electra - February 2005) - TB 275: Methods for measuring the earth of transmission towers equipped with earth wires (Electra - June 2005). Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Comitato di studio C4: pubblicazioni(2) AG 4.4. Lightning Reports published in 2005 and 2006 TF C4.401 “Lightning Induced Overvoltages (LIOV)” – Convener: Carlo Alberto Nucci - CIGRE report : "Lightning-induced voltages on overhead power lines. Part III: Sensitivity Analysis" on the SC C4 website - Extended summary published on Electra No. 222, pp.27-30, October 2005. CIGRE-CIRED JWG C4.402 “Protection of MV and LV Networks against Lightning” – Convener: Farhad Rachidi - Technical Brochure No. 287 "Protection of MV and LV networks against lightning. Part 1: "Common topics" in press. - Summary on Electra No. 224, pp.47-51, February 2006. Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006 Comitato di studio C4: soggetti preferenziali per il 2008 Soggetto preferenziale 1 PS 1 - How can system technical performance be specified, evaluated, and improved by considering: New techniques, tools, and application experiences related to electromagnetic compatibility, insulation coordination, lightning protection, power quality and power system security. System technical performance indices and their impact on customers, asset owners and regulators. The influence of environmental stresses (such as lightning and pollution). The interaction of electrical equipment and customer installations with the power system. Giornata di diffusione dei risultati della sessione Cigre 2006 – Milano, 30 ottobre 2006