Tier1-CNAF DC04 Activities and Status TISB - Pisa - P. Capiluppi 23-01-04 Tier1-CNAF 2003-04 As of end November 2003 requests Note: [obtained/requested] or [new req/old req] Dettaglio Tier1 July August September October November December January February March April May June July August September October November December TISB - Pisa - P. Capiluppi Netw Mbps 15/15 15/15 20/20 35/35 25/25 25/25 45/45 45/150 150/20 150 45 45 45 45 45 45 150 150 Boxes # 40/70 45/70 45/70 45/70 45/20 45/20 70/20 45/20 70/20 70 70 70 120 120 120 120 120 120 CPUs eq. # 160/210 180/210 180/210 180/210 180/50 180/50 210/50 180/50 210/50 210 210 210 410 410 410 410 410 410 Disk TB 3/11 4/15 8/20 8/30 8/30 8/30 11/20 11/20 40/20 50 50 50 61 61 61 61 61 61 Tapes TB 1/10 1/20 2.3/30 2.3/40 5/50 5/50 11/100 11/100 50/100 55 60 65 150 150 150 150 150 150 Change or new req (STILL 8 TB disk!) 2 23-01-04 Infrastrutture Sala Macchine completata: Gruppo Elettrogeno ed UPS in funzione. Cabina Elettrica con nuovi quadri. Gruppo Frigorifero e UTA in fase di collaudo. Trasmissione Dati in funzione. Attestazione Fibre Ottiche PoP GARR in corso. 10 Racks con power switch a controllo remoto della APC pronti. Collaudo effettivo entro l’8 Gennaio 2004. ??? 3 TISB - Pisa - P. Capiluppi 23-01-04 Personale Personale di ruolo: Pietro Matteuzzi: (Responsabile Servizi di Calcolo del CNAF) Luca Dell’Agnello: Sistemi Linux, File Systems, Sicurezza, Rete. Stefano Zani: Storage e Rete Massimo Cinque: Servizi Generali ed Approvigionamento. Personale a Contratto: Daniele Bonaccorsi (A.R.) Supporto SW Esp. (CMS) Andrea Chierici: (Art.23) LCFG, Sistemistica, Site Man. GRID. Donato De Girolamo (Art.2222) Sistemistica, Allarmistica e Sicurezze. Giuseppe Lo Re (A.R.) Supporto SW Esp. (ALICE)/CASTOR Barbara Martelli (Borsa) Sviluppo SW, DB e GRID (RLS). Guido Negri (A.R.) Supporto SW Esp. (ATLAS) Pier Paolo Ricci: (Art.23) CASTOR, Storage, Robotica, GRID (RLS). Felice Rosso: (Art. 15) Monitoring Sistemistica ed LCFG. 4 TISB - Pisa - P. Capiluppi 23-01-04 Personale (2) Altro personale su attività collegate: Alessandro Italiano: (Art.15) Robotica e Libreria, VideoConferenze, Site Manager GRID. Massimo Donatelli: (Art.15) Sistemistica, AFS, NFS, KERBEROS. Nuovo Personale 3 Assegni di Ricerca (1 – 2003 + 2 - 2004). Tecnologo di ruolo (concorso espletato). Tecnico (CTER) di ruolo (concorso espletato) Tecnologo di ruolo (concorso in espletamento). 1 Posto Tecnologo ancora da bandire (2004). 5 TISB - Pisa - P. Capiluppi 23-01-04 Risorse HW attuali Tipo Farm Descrizione Capacità 14 biproc. 800Mhz 10K SPECint2000 55 biproc. 1000 MHz 55K SPECint2000 70 biproc. 1400Mhz 100K SPECint2000 20 biproc. 2200 MHz 44K SPECint2000 5 biproc. 3000 MHz 15K SPECint2000 160 biproc 2400 384K SPECint2000 NAS Procom 17 TB Raw RAID5 NAS EIDE 5 TB Raw RAID5 Dischi SCSI 2 TB Raw RAID5 Dischi FC 10.5 TB Raw RAID5 Dischi FC/ATA (STK) 12 TB Raw RAID5 NAS 35 TB Raw RAID5 Robot L180 STK 3.6 TB / 8 TB (comp.) Drives LTO 15 TB / 30 TB (comp.) Robot L5500 STK 100 TB / 200 TB (comp.) 14 Switch 1/2U 48 FE UTP + 2 GE FO 2 Switch 1.5 U 24 GE UTP + 4 GE FO 1 Core Switch 32 GE FO 1 Core Switch 64 GE FO 608 KSI2K Dischi Nastri Rete TISB - Pisa - P. Capiluppi + 48 KSI2K CDF + 30 KSI2K LHCb +70 KSI2K Babar 46.5 TB + 35 TB 115/230 TB 672 FE UTP 48 GE UTP 132 GE FO 6 23-01-04 Esperimenti ATLAS Ha fatto produzioni su circa 20-50 CPU, 5 TB disco. ALICE Produzioni con 12 – 20 CPU, 4 TB disco. CMS pre-DC04 in corso 2.5 Mev. 90 CPU 8 TB disco. LHCb produzioni ed analisi 70-80 CPU 2TB disco. VIRGO produzioni su 12-20 CPU 6TB disco. CDF Analisi su 12 CPU + Farm Simulazione di 24 CPU in corso di installazione + 72 CPU in corso di acquisto , 1 TB disco + 7 TB installati BaBar E’ stata trasferita al CNAF la facility del CASPUR, è stata consegnata la farm nuova da 23 macchine in corso di installazione. AMS Tests Archiviazione 0.5 TB. 7 TISB - Pisa - P. Capiluppi 23-01-04 Nuove Risorse (Aprile 2004) Avviata Gare per: CPU 700 KSI2K (350 macchine biproc. Pentium Xeon 3GHz, 4 GB memoria. Disco 150 TB tecnologia FC/ATA Rete: Core Switch 128 porte Gb + 2 porte 10Gb. Da avviare gara per 500 cassette (100 TB). 8 TISB - Pisa - P. Capiluppi 23-01-04 TIER1 - FASE II (2004-2008) Descrizione Unità Quantità Costo FARM KSPECint2000 10,000 € 6,542,000 DISCHI TBytes 1,500 € 5,469,000 ROBOTICA TBytes 7,000 € 2,975,000 RETE € 3,400,000 ALTRO € 3,539,900 Gran Totale € 21,925,900 9 TISB - Pisa - P. Capiluppi 23-01-04 Conclusioni ~ 200 CPUs nuove saranno su LCG (2) Accessibili in modo “ibrido” (Locale e Grid) Lo spazio Disco e’ il problema ! Ad oggi abbiamo solo 8 TB (forse 12-13 TB se va bene) Ce ne servono da 25 a 40 TB per il DC04 de Marzo Anche a Legnaro la gara per I 15 TB disco aggiuntivi LCG e’ “ritardata” Non ci saranno per il DC04, quindi solo 18 TB a LNL Anche per i Nastri non sono “rose” Nella libreria vecchia abbiamo 46 cassette (4.6 TB) piene, e non ce ne sono piu’ Acquisto urgente (chiesto a inizio Dicembre, non ancora fatto!) di 100 cassette LTO1 La libreria nuova non e’ ancora in funzione… Debug per quanto tempo? ( e le cassette LTO2 hanno la label capovolta!?) E poi c’e’ il “trasloco” della sala macchine vecchia… TISB - Pisa - P. Capiluppi 23-01-04 10