Tier1-CNAF
DC04 Activities and Status
TISB - Pisa - P. Capiluppi
23-01-04
Tier1-CNAF 2003-04
As of end November 2003 requests
Note: [obtained/requested] or [new req/old req]
Dettaglio
Tier1
July
August
September
October
November
December
January
February
March
April
May
June
July
August
September
October
November
December
TISB - Pisa - P. Capiluppi
Netw
Mbps
15/15
15/15
20/20
35/35
25/25
25/25
45/45
45/150
150/20
150
45
45
45
45
45
45
150
150
Boxes
#
40/70
45/70
45/70
45/70
45/20
45/20
70/20
45/20
70/20
70
70
70
120
120
120
120
120
120
CPUs eq.
#
160/210
180/210
180/210
180/210
180/50
180/50
210/50
180/50
210/50
210
210
210
410
410
410
410
410
410
Disk
TB
3/11
4/15
8/20
8/30
8/30
8/30
11/20
11/20
40/20
50
50
50
61
61
61
61
61
61
Tapes
TB
1/10
1/20
2.3/30
2.3/40
5/50
5/50
11/100
11/100
50/100
55
60
65
150
150
150
150
150
150
Change or new req
(STILL 8 TB disk!)
2
23-01-04
Infrastrutture
Sala Macchine completata:
 Gruppo Elettrogeno ed UPS in funzione.
 Cabina Elettrica con nuovi quadri.
 Gruppo Frigorifero e UTA in fase di collaudo.
 Trasmissione Dati in funzione.
 Attestazione Fibre Ottiche PoP GARR in corso.
 10 Racks con power switch a controllo remoto della APC
pronti.
 Collaudo effettivo entro l’8 Gennaio 2004. ???
3
TISB - Pisa - P. Capiluppi
23-01-04
Personale
 Personale di ruolo:




Pietro Matteuzzi: (Responsabile Servizi di Calcolo del CNAF)
Luca Dell’Agnello: Sistemi Linux, File Systems, Sicurezza, Rete.
Stefano Zani: Storage e Rete
Massimo Cinque: Servizi Generali ed Approvigionamento.
 Personale a Contratto:








Daniele Bonaccorsi (A.R.) Supporto SW Esp. (CMS)
Andrea Chierici: (Art.23) LCFG, Sistemistica, Site Man. GRID.
Donato De Girolamo (Art.2222) Sistemistica, Allarmistica e Sicurezze.
Giuseppe Lo Re (A.R.) Supporto SW Esp. (ALICE)/CASTOR
Barbara Martelli (Borsa) Sviluppo SW, DB e GRID (RLS).
Guido Negri (A.R.) Supporto SW Esp. (ATLAS)
Pier Paolo Ricci: (Art.23) CASTOR, Storage, Robotica, GRID (RLS).
Felice Rosso: (Art. 15) Monitoring Sistemistica ed LCFG.
4
TISB - Pisa - P. Capiluppi
23-01-04
Personale (2)
 Altro personale su attività collegate:
 Alessandro Italiano: (Art.15) Robotica e Libreria,
VideoConferenze, Site Manager GRID.
 Massimo Donatelli: (Art.15) Sistemistica, AFS, NFS,
KERBEROS.
 Nuovo Personale





3 Assegni di Ricerca (1 – 2003 + 2 - 2004).
Tecnologo di ruolo (concorso espletato).
Tecnico (CTER) di ruolo (concorso espletato)
Tecnologo di ruolo (concorso in espletamento).
1 Posto Tecnologo ancora da bandire (2004).
5
TISB - Pisa - P. Capiluppi
23-01-04
Risorse HW attuali
Tipo
Farm
Descrizione
Capacità
14 biproc. 800Mhz
10K SPECint2000
55 biproc. 1000 MHz
55K SPECint2000
70 biproc. 1400Mhz
100K SPECint2000
20 biproc. 2200 MHz
44K SPECint2000
5 biproc. 3000 MHz
15K SPECint2000
160 biproc 2400
384K SPECint2000
NAS Procom
17 TB Raw RAID5
NAS EIDE
5 TB Raw RAID5
Dischi SCSI
2 TB Raw RAID5
Dischi FC
10.5 TB Raw RAID5
Dischi FC/ATA (STK)
12 TB Raw RAID5
NAS
35 TB Raw RAID5
Robot L180 STK
3.6 TB / 8 TB (comp.)
Drives LTO
15 TB / 30 TB (comp.)
Robot L5500 STK
100 TB / 200 TB (comp.)
14 Switch 1/2U
48 FE UTP + 2 GE FO
2 Switch 1.5 U
24 GE UTP + 4 GE FO
1 Core Switch
32 GE FO
1 Core Switch
64 GE FO
608 KSI2K
Dischi
Nastri
Rete
TISB - Pisa - P. Capiluppi
+ 48 KSI2K CDF
+ 30 KSI2K LHCb
+70 KSI2K Babar
46.5 TB
+ 35 TB
115/230 TB
672 FE UTP 48 GE
UTP 132 GE FO
6
23-01-04
Esperimenti
 ATLAS
Ha fatto produzioni su circa 20-50 CPU, 5 TB disco.
 ALICE
Produzioni con 12 – 20 CPU, 4 TB disco.
 CMS
pre-DC04 in corso 2.5 Mev. 90 CPU 8 TB disco.
 LHCb
produzioni ed analisi 70-80 CPU 2TB disco.
 VIRGO
produzioni su 12-20 CPU 6TB disco.
 CDF
Analisi su 12 CPU + Farm Simulazione di 24 CPU in
corso di installazione + 72 CPU in corso di acquisto , 1
TB disco + 7 TB installati
 BaBar
E’ stata trasferita al CNAF la facility del
CASPUR, è stata consegnata la farm nuova da
23 macchine in corso di installazione.
 AMS
Tests Archiviazione 0.5 TB.
7
TISB - Pisa - P. Capiluppi
23-01-04
Nuove Risorse (Aprile 2004)
Avviata Gare per:
CPU 700 KSI2K (350 macchine biproc. Pentium Xeon 3GHz, 4
GB memoria.
Disco 150 TB tecnologia FC/ATA
Rete: Core Switch 128 porte Gb + 2 porte 10Gb.
Da avviare gara per 500 cassette (100 TB).
8
TISB - Pisa - P. Capiluppi
23-01-04
TIER1 - FASE II (2004-2008)
Descrizione
Unità
Quantità
Costo
FARM
KSPECint2000
10,000
€ 6,542,000
DISCHI
TBytes
1,500
€ 5,469,000
ROBOTICA
TBytes
7,000
€ 2,975,000
RETE
€ 3,400,000
ALTRO
€ 3,539,900
Gran Totale
€ 21,925,900
9
TISB - Pisa - P. Capiluppi
23-01-04
Conclusioni
~ 200 CPUs nuove saranno su LCG (2)
 Accessibili in modo “ibrido” (Locale e Grid)
Lo spazio Disco e’ il problema !
 Ad oggi abbiamo solo 8 TB (forse 12-13 TB se va bene)
 Ce
ne servono da 25 a 40 TB per il DC04 de Marzo
 Anche a Legnaro la gara per I 15 TB disco aggiuntivi LCG e’
“ritardata”
 Non
ci saranno per il DC04, quindi solo 18 TB a LNL
Anche per i Nastri non sono “rose”
 Nella libreria vecchia abbiamo 46 cassette (4.6 TB) piene, e non
ce ne sono piu’
 Acquisto
urgente (chiesto a inizio Dicembre, non ancora fatto!) di 100
cassette LTO1
 La libreria nuova non e’ ancora in funzione…
 Debug
per quanto tempo? ( e le cassette LTO2 hanno la label
capovolta!?)
E poi c’e’ il “trasloco” della sala macchine vecchia…
TISB - Pisa - P. Capiluppi
23-01-04
10