ENERmanagement 2011 F d i Ri Federico Rizza Regional Energy Consumption Specialist Tenaris: Global Industrial System Serving the world’s energy industry and other industrial applications • Annual manufacturing capacity of six million tons of steel pipes - 3.4 million tons of seamless pipes - 2.7 million tons of welded pipes • 4 electric steel shops • 16 seamless rolling mills • 32 welded tube mills • 52 heat treatment lines (28 in hot rolling mills ) • 78 premium threading lines • One Health, Health Safety and Environment Management System MSTE - ENMA Tenaris Worldwide Operations 17 June 2011 2 TenarisDalmine Plants Sabbio Bergamasco Products: Cylinders/Large cylinders, Accumulators Turnover: € 1,6 billion People: 2500 Dalmine Products: Mechanical tubing, OCTG, Line pipe, Tubes for petrochemical plants, Pipe for high-temperature service, Hollow bars, Structural tubing. Arcore Products: Mechanical tubing, Structural tubing, Hollow bars Piombino Products: Butt welded steel pipe for plumbing MSTE - ENMA Tenaris Costa Volpino Products: Seamless cold drawn tubes for hydraulic y circuits and cylinders, y , Tube for automotive, Heat-exchanger tubes. 17 June 2011 3 TenarisDalmine Plants Totale energia consumata 180.000 TEP BDG 10/11 MSTE - ENMA Tenaris 17 June 2011 4 Tenaris Energy Saving plan Tenaris and Tenaris Dalmine’s steps for energy efficiency efficiency. • 2006: − An A Energy E S Savings i Pl Plan was launched. l h d Objectives Obj ti off 7% and d 6% on specific ifi consumption reduction in natural gas and electricity. − Planed activities were: Metering, Controlling, Training & Communication, Standardization, Investment plans and Waste reduction plans. • 2007: − A 120 MWe high efficiency Combined Cycle Power Plant started the operation to self-produce electricity electricity, steam and hot water both inside and outside the plant (district heating). •2008: • The first High Efficiency Combustion System has been installed in a reheating furnace (in collaboration with R&D CSM). •2009: − A Global Energy Efficiency Plan was launched. Objectives of 15% and 10% in specific consumption reduction in natural gas and electricity. − And R&D department for Energy Efficiency has been created. MSTE - ENMA Tenaris 17 June 2011 5 Tenaris Energy Saving plan Tenaris and Tenaris Dalmine’s steps for energy efficiency efficiency. • 2009: − The Energy Efficiency plan was awarded the UE recognition “Motor Challenge Programme” •2010: −10.000 “Titoli di Efficienza Energetica TEE” (1 TEE= 1 ton of oil saved) was awarded by y the Italian authorities for the most important p high g technology gy investment programs. MSTE - ENMA Tenaris 17 June 2011 6 Tenaris Energy Saving plan Tenaris Dalmine: EN 16001 Certification •2010: − Tenaris Dalmine and its power plant were certified with the EN UNI 16.001 16 001 “Energy Management System” MSTE - ENMA Tenaris 17 June 2011 17 June 7 Energy Management O Organization i i OPER - IT EnMS MSTE OPERATION ENMA Focus on energy aspects People involved: • 3 Tenaris: T i - Energy E M Manager: Rondi R di Maurizio M i i - Eneregy Consumption Regional Specialist: Rizza Federico - Energy Consumption Regional Analyst: Fumagalli Davide • Yousave (ESCo Company, results focused contract): 5 people. MSTE - ENMA Tenaris 17 June 2011 17 June 8 Energy Management Gl b l aspects Global Reduce environment impact Reduce energy request Reduce product cost Energy saving Management Cultu ural chan nge Save futures ineffectiveness and prevent wastes Engineering Purchasing Operations Investm ments Industrial energy efficiency Correct ineffectiveness of the past Maintenance Energy consumptions audit MSTE - ENMA Tenaris 17 June 2011 9 Combustion system - Regenerative Burners Objective: evaluation of the energy saving introduced by the revamping of a standard combustion system with regenerative burners. Operating principle: Burners made by a ceramic matrix (Al2O3) work in an intermittent way to pre-heat combustion air. Revamping of FTM RHF New regenerative burners MSTE - ENMA Tenaris 17 June 2011 10 Combustion system – FTM RHF example Results: • Decrease in specific energy consumption [Nm3/ton]: from 49.8 to 40 Nm3/ton (this data are related to the more significant product of the MPM). Æ 2.6 MN3/year • High thermal efficiency: from 45% to 62% (comparison pre-post revamping) • Decrease in gas consumption during stanb-by Specific S ifi gas consumption ti for f mostt important i t t classes l (25%-35% of improvement) MSTE - ENMA Tenaris Classes Production [ton/day] 1 1-500 2 501-1000 3 1001-1500 4 1501-2000 5 2001-2500 6 2501-3000 7 >3000 P d ti Production classes l 17 June 2011 11 New air compressor – Nitrogen/air conversion i 0.2 0.19 0.18 Specific consumption comparison: old-new compressor OLD compressor NEW compressor [0.12 – 0.104 kWh/Nm3] 0.12 0.11 0.1 0.09 0.08 Energy saving: 23 kUSD/y 0.07 0.06 0.05 0.04 0.03 New asset with two operating compressors: Pressure: 5.5 bar Previous situation: Air flow < 8000 Nm3/h Pressure: 4.5 bar MSTE - ENMA [N Nm3/h] Air flow: ~10,000 Nm3/h 11000 10500 10000 9500 9000 8500 8000 7500 7000 6500 6000 5500 5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0 61 59 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 9 11 7 5 3 1 0.02 0.01 0 Performance of the new compressor 5.65 5 55 5.55 5.45 5.35 5.25 [bar] [kWh/Nm3] 0.17 0.16 0.15 0.14 0.13 5.15 5.05 average air flow Power [kW] average pressure 4.95 4.85 4.75 Tenaris 17 June 2011 12 MSTE - ENMA Average consumption PRE: Nitrogen consumption ~600 Nm3/h Average consumption POST: ~300 Nm3/h Tenaris PRE 12/1/201 11 8h 17 June 2011 27/2/201 11 4h 25/2/201 11 2h 23/2/201 11 0h 20/2/2011 1 22h 18/2/2011 1 20h 16/2/2011 1 18h 14/2/2011 1 16h 12/2/2011 1 14h 10/2/2011 1 12h 8/2/2011 1 10h 6/2/201 11 8h 4/2/201 11 6h 2/2/201 11 4h 31/1/201 11 2h 29/1/201 11 0h 26/1/2011 1 22h 24/1/2011 1 20h 22/1/2011 1 18h 20/1/2011 1 16h 18/1/2011 1 14h 16/1/2011 1 12h 2000 14/1/2011 1 10h 2100 10/1/201 11 6h 2200 8/1/201 11 4h 6/1/201 11 2h 4/1/201 11 0h 1/1/2011 1 22h 30/12/2010 0 20h 28/12/2010 0 18h 26/12/2010 0 16h 24/12/2010 0 14h 22/12/2010 0 12h 20/12/2010 0 10h 18/12/201 10 8h 16/12/201 10 6h 14/12/201 10 4h 2400 12/12/201 10 2h 10/12/201 10 0h 7/12/2010 0 22h 5/12/2010 0 20h 3/12/2010 0 18h 1/12/2010 0 16h 29/11/2010 0 14h 27/11/2010 0 12h 25/11/2010 0 10h 23/11/201 10 8h 21/11/201 10 6h 19/11/201 10 4h 17/11/201 10 2h 15/11/201 10 0h [Nm3 3/h] Example of Nitrogen/air conversion Consumption during hot rolling process 2300 Stop of hot rolling process: EXP furnace consumption 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 400 500 300 200 100 0 POST Expander furnace Nitrogen/air conversion: gas consumption during hot rolling stop Saving: ~140 140 kUSD/y (@ 0.0516 €/Nm3) 13 Maintenance & Energy Saving Li h system revamping Light i – ESCo ESC contract 2009 vs 2010 consumptions: Comparazione consumi illuminazione FAS anno 09‐10 12.000 10 000 10.000 k kWh 8.000 6 000 6.000 4.000 2 000 2.000 ‐ 15‐mar 14‐apr 14‐mag 13‐giu 13‐lug Totale 2009 12‐ago 11‐set 11‐ott 10‐nov 10‐dic Totale 2010 • Savings 2010 vs 2009:48% 9 Raw data without normalisation on planned shift 2010 MSTE - ENMA Tenaris 17 June 2011 14 Maintenance & Energy Saving Li h system revamping. Light i Confronto consumi 2010 “vecchio impianto” vs “nuovo impianto”: Confronto normalizzato consumi PRE e POST intervento 250 200 MWh 150 100 50 0 Aprile Maggio Giugno Luglio Agosto Settembre Ottobre Novembre Previsione consumo vecchio impianto con automatismo di spegnimento Previsione saving ottenibile con automatismo sul vecchio impianto Consumo misurato nuovo impianto • Saving 2010 “new light system” vs “old light system”: Dicembre 63% (conv.65%) 9 old system” consumption calculated on shifts 2010 MSTE - ENMA Tenaris 17 June 2011 15 Maintenance & Energy Saving Ai compressed Air d wastes reduction d i • Service leakage (5 mm hole= 5 kWh = 3.5 k€/y). • Pressure Reduction(1 bar less = - 10% energy = 80 k€/y). • Wrong energy utilisation(nozzle = 40% flow reduction). reduction) • Service automatisation (saving during stand-by period and during working cycles). • Operative practice to switch off the equipments. Potenza impegnata media dal 2007 al 2009 per utenze di servizio (Consumi non legati alle tonnellate prodotte) 16 14 Pot enza [MW] 12 rex 10 natale 8 6 4 2 0 2005 2006 2007 2008 2009 [anni] MSTE - ENMA Tenaris 17 June 2011 16 Maintenance & Energy Saving C i Continuous IImprovement G Groups Saving [k€/anno] GMC Leader Reparti Stato Anno Bdg Risparmio energia centrali oleoelettriche servizi Rizza Federico FTMF Chiuso 09/10 60 Acque industriali Curti Stefano Sito Dalmine Chiuso 09/10 80 Risparmio energia consume Merati Paolo FASI Chiuso 08/09 150 Gerbelli Cristian CELE Chiuso 08/09 20 Rannucchi Andrea FTMC Chiuso 08/09 160 P l Palmeri iC Costantino i ACC Chi Chiuso 08/09 230 TOT. 700 Riduzione consumi illuminazione esterna Risparmio energia consume Risparmio aria compressa e azoto MSTE - ENMA Tenaris 17 June 2011 17 Maintenance & Energy Saving A di & IInspection Audit i example l MSTE - ENMA Tenaris 17 June 2011 18 Maintenance & Energy Saving A di & IInspection Audit i results l VALORIZZAZIONE RIPARAZIONI PERDITE IN LINEA CON GLI AUDIT data linea 28/05/2009 29/05/2009 04/06/2009 18/06/2009 30/06/2009 totale per vettore AGG OCTG FIN LP FIN‐LP AGG OCTG2 €/gg K€/anno aria compressa aria compressa €/gg 49,5 79,5 44 5 44,5 54 13 240,5 87,8 azoto €/gg 8,5 acqua €/gg metano €/gg 1 10 8,5 3,1 1 0,4 10 3,7 totale per linea totale per linea €/gg K€/anno 59 21,5 79,5 29,0 44 5 44,5 16 2 16,2 64 23,4 13 4,7 260 94,9 ISPEZIONE AGOSTO 2010 / Week 36 ‐ Azoto e Gas Tecnici linea AZOTO €/gg 35 12 7 ACC FAP FAS Cabina O2 €/gg totale per vettore €/anno MSTE - ENMA ARIA COMPRESSA ARIA COMPRESSA €/gg ELETTRICITA ELETTRICITA' €/gg O2 €/gg 4 17 4 1460 Tenaris 17 6205 20 20 7300 totale per linea totale per linea €/gg €/anno 35 12775 16 5840 24 8760 20 7300 95 34,7 17 June 2011 19 Maintenance & Energy Saving O Operative i Practice P i &P Procedure d FTMF Example – Layout for procedure application & verification MSTE - ENMA Tenaris 17 June 2011 20 Maintenance & Energy Saving O Operative i Practice P i &P Procedure d Id L3 L4 L3 Campata area Campata C1 2° quarto: prima metà L3‐5 Campata C1 2° quarto: seconda metà L3‐6 Campata C1 3° quarto: prima metà L3‐11 Campata C1 3° quarto: seconda metà L3‐12 Campata C1 4° quarto: prima metà L4‐5 Campata C1 4° quarto: seconda metà L4‐6 Campata C1 4 quarto: seconda metà L4 6 Campata C2 3° quarto: prima metà L3‐9 Campata C2 3° quarto: seconda metà L3‐10 Campata C3 3° quarto: prima metà L3‐7 Campata C3 3° quarto: seconda metà L3‐8 responsabilità ese man altri stalli tubi, colonna W72 carico e scarico in campata 1 colonna W80 colonna W72 cabina operatori tagliatubi Bronx 1 L4 ubicazione interruttore AGG1 interno cabina cabina operatori tagliatubi Bronx 2 cabina operatori tagliatubi Bronx 2 interno cabina interno cabina cabina operatori CND interno cabina postazione controllo e riparazione dopo CND postazioni controllo estremità tubi Campata C2 4° quarto: prima metà L4‐3 Campata C2 4° quarto: seconda metà L4‐4 Campata C3 4° quarto: prima metà L4‐1 Campata C3 4 quarto: prima metà L4 1 Campata C3 4° quarto: seconda metà L4‐2 locale locale colonna W80 cabina operatori tagliatubi Bronx 3 interno cabina cabina operatori tagliatubi Bronx 4 interno cabina AGG2 cabina operatori CND postazione controllo e riparazione dopo CND postazione controllo e riparazione dopo CND postazioni controllo estremità tubi interno cabina locale locale cabina operatori provatubi INNSE e verniciatrice interno cabina zona interna provatubi INNSE cabina opereatori scarico all'esterno (lato Mariano) scantinato pompe e autoclave provatubi INNSE uffici locali AGG MSTE - ENMA interno cabina AGG1‐2 Tenaris interno uffici 17 June 2011 21 Maintenance & Energy Saving O Operative i Practice P i &P Procedure d FTMF Example – Procedure application GMC FTM FREDDO ‐ RIEPILOGO SCHEDE ANALISI yousave innowatio Gruppo vettore energetico linea AGG 2 AGG 1‐2 AGG 1‐2 AGG 2 OCTG OCTG OCTG aria compressa OCTG OCTG FIN FIN FIN FIN FIN ID breve descrizione azione costo intervento (k€) risparmio risparmio annuo totale 1° anno ottenibile costi (k€) netto (k€) netto (k€) (k€) ID‐FTMF_001 Pulizia rulli raddizzatubi Bronx Utilizzare ugelli alta efficienza; automatizzare erogazione 0.45 3.80 1 ID‐FTMF_004 Evacquazione contaminanti postazioni CET ( ) Automazione erogazione; utilizzo ugelli ad alta efficienza 0.80 7.10 1 ID‐FTMF_005 Soffiaggio zona taglio tagliatubi Bronx ( ) Purga aria per pulizia ugelli marcatrice a fine ID‐FTMF_006 utilizzo ID‐FTMF_007 Asciugatura tubo in uscita DAPCO Utilizzo di ugelli ad alta efficienza 0.30 0.25 1.00 0.60 1.35 1.20 0.90 7.30 ID‐FTMF_010 Raffreddamento corpo pompe centrale olio ID‐FTMF_012 Soffiaggio tubo dopo ciclo prova idraulica Automatizzare erogazione Automatizzare erogazione A Automazione erogazione; utilizzo ugelli ad alta i i ili lli d l efficienza Automazione erogazione; utilizzo ugelli ad alta efficienza Utilizzo di ugello ad alta efficienza 1.70 0.35 18.90 0.50 ID‐FTMF_013 Soffiaggio estremità tubo dopo filettatura ID‐FTMF_015 Soffiaggio tubo dopo ciclo prova idraulica ID‐FTMF_019 Atomizzazione lubrificante calibratrice Utilizzo di pistola erogatrice ad alta efficienza Utilizzo di ugello ad alta efficienza Modifica automazione erogazione 0.60 0.35 0.30 0.30 2.80 0.50 ID‐FTMF_021 Soffiaggio nelle operazioni manuali di molatura (2) Utilizzo di ugello ad alta efficienza Purga aria per pulizia ugelli marcadifetti US Modifica automazione erogazione ID‐FTMF_022 Olimpus Soffiaggio nelle operazioni di asciugatura estremità ID‐FTMF_023 Utilizzo di pistola erogatrice ad alta efficienza tubi in uscita da US Olimpus (3) 0.14 0.00 0.80 0.40 0.50 0.00 0.15 0.00 ID‐FTMF_008 Barriera antivapore FIN ID‐FTMF_024 FIN ID‐FTMF_025 elettricità AGG 2 ID‐FTMF_003 metano OCTG1‐2 ID‐FTMF_14 Soffiaggio per pulizia macchina (4) Utilizzo di pistola erogatrice ad alta efficienza Mescolatore miscela polveri magnetiche p g Pompe riempimento autoclave e impianto prova idraulica Modifica automazione utilizzo mescolatore 0.15 1.20 Adozione di inverter (5) 0.00 0.00 Riscaldo fusti grasso per filetti (6) Utilizzo di fasce riscaldanti 0.80 0.40 9.09 36.51 0.00 20.06 0.80 ‐0.40 (1) applicabile a ciascuna delle 4 postazioni (2) risparmio non calcolabile, non conoscendo il numero di tubi da molare: con ugello ad alta efficienza si risparmiano 0,60 € per ogni ora di utilizzo totali 9.89 56.17 (3) risparmio non calcolabile, non conoscendo il numero di tubi da riparare: con pistola ad alta efficienza si risparmiano 2,75 € per ogni ora di utilizzo (4) risparmio non calcolabile, non conoscendo il numero delle operazioni di attrezzaggio: con pistola ad alta efficienza si risparmiano 2,00 € per ogni ora di utilizzo (5) le misurazioni effettuate indicano in ca 14k€ il risparmio annuo di energia elettrica. Argomento passato in carico a DITE. Vale per le tre provatubi. (6) per ogni postazione MSTE - ENMA Tenaris 17 June 2011 22 Maintenance & Energy Saving E Example: l reduction d i plan l results l 09/10 • Operactive Practices • Procedure & Operactive Practices formalisation on IDM System j Objective: • Fix consumptions reduction (plant switched off) Winter plant stop example: Confronto 01/01/10 vs storico '08 e '09 Consumi fermata '09/'10 vs. storico '08/'09 14.0 Consumo 01/01/08 13.0 12.0 Consumo 01/01/09 M MWh 11.0 3,500 3,000 10.0 2,500 forecast 01/01/10 9.0 883 2,000 8.0 Consumo 01/01/10 7.0 MWh 1,500 1,000 6.0 5.0 02/01 02/01 01/01 01/01 01/01 01/01 01/01 31/12 MSTE - ENMA Minimo teorico 01/01 Tenaris 500 0 2,613 Risparmio totale vs 08‐09 reale 09‐10 17 June 2011 23 TEE & Investements: how to obtain SAVINGS MWh Consumption reduction Investments % TEE ESCo manages TEE request for Dalmine yousave innowatio Gruppo ESCo requires TEE to Gas and Electrical Energy Authority AEEG GME TEE MSTE - ENMA Tenaris 17 June 2011 24 TenarisDalmine & TEE: a quick overview MOV attesi ottenuti attesi ottenuti TEE TIPO 1 TIPO 1 Electrical Energy TIPO 1 Natural Gas TOT 2009 2791 2916 5707 2010 2011 2012 2013 2014 2015 3656 828 428 328 328 9575 9575 9575 1275 1275 13230 10402 52485 10002 1602 1602 1283 4176 5459 − TEE obtained till now more than 10.000 − Expectations for next 5 years: more than 40.000 − Working Group: Energy Management team (Tenaris) + Yousave (ESCo) (3 persons) TEE are entirely obtained by the Energy Service Company Company. Tenaris receives a percentage according to the contract. MSTE - ENMA Tenaris 17 June 2011 25 Thank you!!! Federico Rizza Regional Energy Consumption Specialist Piazza Caduti 6 luglio 1944, 1 24044 – Dalmine (BG) 0039 - 035 / 5602644 0039- 329 83 16 772 [email protected] MSTE - ENMA Tenaris 17 June 2011 26