W245
Jelly Bean
Girls Accessory Set
Using 220 paints
Designed By
Laura Farson
Jelly Bean Ruffly Leggies or Armies
Dress your “Pink Princess” in this ruffled set. They can be used to cover little arms or legs, just
adjust the length in the center.
Skill Level: Intermediate
Size: Child
Finished measurements: 8” x 10”
Materials: 1 skein Cascade 220 Paints (100% wool, 220 yards, 100gm) color #9860
Note: Two skeins will make all three projects
Two 16” Size US #8 circular needles
Blunt sewing needle
Gauge: 5 sts and 6 rnds = 1" rib st
Ribbing – Lengthen or shorten in this section
Cast on 40 sts with German Twisted Cast on, place marker and join taking care not to twist sts.
Rnds 1-6: *K1, P1, rep *to end
Rnds 7-30: Knit even
Rnds 31-56: *P1, K4, rep * to end
Ruffle Increase Rounds
Rnd 1: *P1, K1, m1, P1, K1, m1, K1, rep * to end, (56 sts)
Rnds 2, 4, 6: Knit the knits, purl the purls
Rnd 3: *P1, K2, m1, P1, K2, m1, K1, rep * to end (72 sts)
Rnd 5: *P1, K3, m1, P1, K3, m1, K1, rep * to end (88 sts)
Bind off in pattern
Size: Child Jelly Bean Ruffly Hat
This is a sweet hat that has a lot of stretch knitted in.
Finished measurements: 7” x 21” circ.
Materials: 1 skein Cascade 220 Paints (100% wool, 220 yards, 100gm) Color 9860
Note: Two skeins will make all three projects
Two 16” Size US #8 circular needles, or 4 double points
Blunt sewing needle
Gauge: 5 sts and 6 rnds = 1" rib st
Lower Edge
Cast on 200 sts with Long Tail Cast On onto one 16” circular needle
Join in a circle taking care not to twist sts
Ruffle Decreases
Rnd 1: *P1, K4, rep * to end
Rnd 2: *P1, K2, K2tog, rep * to end (160 sts)
Rnds 3 and 5: Purl the purls; Knit the knits
Rnd 4: *P1, K1, K2tog, rep * to end (120 sts)
Rnd 6: * P1, K1, SSK, K2, rep * to end (100 sts)
Rnd 7 - 22: *P1, K4, rep * to end
Crown: Decrease Rnds – Add a 2nd circular needle or change to double pts
Divide into 10 sections by placing markers every 10 sts
Dec Rnd: *Knit to 2 sts before m, K2tog, rep * to end
Repeat dec rnd until 10 sts rem
K2tog around removing markers
Cut yarn 4” long and thread onto blunt needle, draw through loops and cinch.
Weave in yarn end.
Ties
Knit two 18” lengths of 4-stitch I-cord (an Embellishknit™ is helpful)
Sew each I-cord inside the ruffle at the lower edge on opposite sides.
Jelly Bean Ruffly Drawstring Purse
Your little girl will love to carry this around with all her treasures inside.
Skill Level: Intermediate
Size: One
Finished measurements: 4-1/2” diameter x 7” high
Materials: 1 skein Cascade 220 Paints (100% wool, 220 yards, 100gm), color #9860
Note: Two skeins will make all three projects
Two 16” Size US #8 circular needles, or 4 double points
Blunt sewing needle
4 ½” Diameter cardboard, plastic or other firm material for base
Gauge: 5 sts and 6 rnds = 1" in ribbing
Upper Edge
Cast on 192 stitches with Long Tail Cast On. Join in a circle taking care not to twist the
stitches.
Ruffle Decrease Rounds
Rnd 1: *P1, K2, K2tog, P1, K3, K2tog, K1, rep * to end (160 sts)
Rnds 2, 4, 6: Purl the purls; Knit the knits
Rnd 3: *P1, K1, K2tog, P1, K2, K2tog, K1, rep * to end (128 sts)
Rnd 5: * P1, K2tog, P1, K1, rep * to end (96 sts)
Rnd 7: *P1, SSK, K3, rep * to end (80 sts)
Rnd 8: *P1, K4, rep * to end
Rnd 9: Purl
Rnd 10: Reverse the direction and begin knitting back on the stitches just completed. Knit even
Rnds 11-23: Knit even
Rnd 24-44: *K4, P1*, rep * to end
Rnds 45 and 46: Knit even
Decrease for base
Divide into 8 sections by placing markers every 10 sts
Dec Rnd: *Knit to 2 sts before marker, K2tog, rep * to end
Repeat dec rnd until 8 sts rem, K2tog around, removing markers, (4 sts)
Cut yarn at 4”, thread into blunt needle, and thread through rem 4 loops, Cinch.
Weave the end to the inside.
Insert a 4-1/2” circle of firm material (cardboard, plastic or interfacing) at the base. If desired
tack with glue.
Drawstring
Knit two 30” long 4 stitch I-cords (An Embellishknit™ is useful)
Finish the ends by weaving the yarn end to the inside of the cord.
Insert one I-cord into the round following the purl round at the end of the ruffle as shown in the
diagram. The second cord is inserted in the opposite direction. Insert it adjacent to the first
cord. (not through the same stitch)Tie the ends together at each side 
Scarica

Jelly Bean Girls Accessory Set Laura Farson