TERZIARIO UFFICI SERVICES AND HIGH - TECH PORTA NUOVA GARIBALDI, Milano - Torri A - B - C e Podium 2 GRATTACIELO PIRELLI, Milano 4 CITY LIFE, Milano - Torre Isozaki 6 SANTANDER 9, Milano 7 CAMPARI, Milano Sesto S.Giovanni - Headquarter 9 ALENIA AERONAUTICA, Caselle Nord - Ampliamento Complesso Industriale e Uffici 10 ZURICH ITALIA, Milano - Headquarter 12 STAM EUROPE ITALIA, Milano 13 L’OREAL ITALIA, Milano - Headquarter 14 EDISON PROJECT, Milano Sesto S.Giovanni 15 IMMSI, Milano - Headquarter 16 SKY ITALIA, Milano - Headquarter Edificio 3 17 PORTA NUOVA GARIBALDI, Milano - Edifici E1-E2 18 DANIELLI SPA, Milano 19 MACIACHINI CENTER, Milano - Business Park lotto 1 20 BODIO CENTER, Milano - Business park 21 1 Hines Italia Po r t a N u o v a G a r i b a l d i To r r i A - B - C e Po d i u m Milano D AT I D I P R O G E T TO Superficie dell’edificio: 107.500 mq (Ed. A+B+C) 84.500 mq Podium Anno di inizio e fine progetto: 2005 - 2008 Anno di inizio e fine cantiere: 2009 - in corso 1.1 Cliente ARIATTA: Hines Italia Servizi prestati da ARIATTA: Progetto Preliminare (in collaborazione con Buro Happold UK), Definitivo ed Esecutivo; supporto tecnico alla Direzione Lavori Design Architect: Cesar Pelli & Associates Architects (USA) Executive Architect: Adamson Associates (Toronto, Canada) - Tekne Spa (Milano) Ingegneria Strutturale: MSC Associati Srl (Milano) - ing. Danilo Campagna Project management: Adamson Associates (Toronto, Canada) - J & A (Milano) struzioni Moretti Sfrutta al meglio la possibilità di utilizzare l’acqua di falda (energia rinnovabile) e di poterla restituire in un corso d’acqua superficiale posizionato immediatamente al confine del lotto di intervento (Martesana). In considerazione delle grandi quantità di acqua in gioco, è stato necessario dovere garantire il funzionamento di tutti gli impianti anche in corrispondenza di un periodo di “piena” più o meno prolungato della Martesana. Allo scopo sono stati realizzati dei pozzi di reimmissione in falda dell’acqua il cui funzionamento è previsto per le sole situazioni di emergenza. Gli impianti utilizzano gruppi frigoriferi polivalenti a recupero del calore di condensazione e reversibili a pompa di calore. L’acqua di falda viene utilizzata anche per il pre-raffreddamento dell’aria esterna di rinnovo. In tutto il progetto Porta Nuova Garibaldi NON è stata realizzata alcuna centrale termica. Le simulazioni energetiche effettuate sulla Torre A (30 piani) mostrano, rispetto a un impianto tradizionale costituito da caldaie a condensazione ad alta efficienza e gruppi frigo • 37,80% risparmio Energia Primaria • 42,86% riduzione emissione CO2 • 8 crediti ottenuti in Optimize Energy Performance (LEED) 2 Hines Italia Porta Nuova Garibaldi Buildings A - B - C and Podium Milan D E S I G N D ATA Building area: 107.500 sqm (Bldgs A+B+C) 84.500 sqm Podium Project start: 2005 - 2008 Project finish: 2009 - in progress 1.1 Commissioned by: Hines Italia Services provided by ARIATTA: Preliminary design (in co-operation with Buro Happold UK), Definitive and Detailed Design; Technical support to Site Supervision Design Architect: Cesar Pelli & Associates Architects (USA) Executive Architect: Adamson Associates (Toronto, Canada) - Tekne Spa (Milan) Structural Engineering: MSC Associati Srl (Milano) - ing.Danilo Campagna Project management: Adamson Associates (Toronto, Canada) - J & A (Milan) It fully exploits the possibility to use groundwater (renewable energy resorce) and then drain it in a waterway running right on the limits of the site (Martesana). Considering the large quantity of water involved, it has been a necessity to guarantee the functioning of all installations also in case the Martesana waterway should flood for any length of time. For this purpose wells to re-introduce water into the ground have been implemented, which would only work in case of an emergency. The thermo-refrigeration machines used are an evolution of the traditional reversible heat pump refrigeration system, being able to produce both chilled water and hot water AT THE SAME TIME (MULTI-USE UNITS). Groundwater is also used to pre-cool the external air supply. NO thermal power plant has been included in the Porta Nuova Garibaldi project. The energy simulations carried out on Building A (30 floors) show the benefits obtained compared to a more traditional plant made of high efficiency condenser boilers and refrigeration units • 37,80% corresponding Fuel Energy saving • 42,86% CO2 emission reduction • 8 credits gained on Optimize Energy Performance (LEED) 3 Regione Lombardia G ra t t a c i e l o P i r e l l i R i s t r u t t u ra z i o n e i n t e g ra l e d i tutti gli impianti tecnologici Milano D AT I D I P R O G E T TO Superficie dell’edificio: circa 60.000 mq Anno di inizio e fine progetto: 1997 1.2 Cliente ARIATTA: Eleca Spa (Cantù) Servizi prestati da ARIATTA: Progetto esecutivo in fase di Appalto Concorso E’ il progetto che ha rappresentato una svolta per l’approccio alle tematiche energetiche da parte della città di Milano. Il progetto è del 1997 e riguardava la ristrutturazione integrale dei soli impianti tecnologici dell’intero edificio, da realizzarsi con edificio permanentemente occupato (solo uno/due piani alla volta venivano liberati dagli occupanti). Premesso che in quel momento storico l’utilizzo dell’acqua di falda per fini tecnologici era tassativamente vietato da tutte le leggi e norme tecniche vigenti in Lombardia, nel nostro progetto abbiamo deciso comunque di proporne l’utilizzo estensivo dimostrandone gli enormi vantaggi in termini di risparmio energetico/economico e di cantierizzabilità dell’intervento (nell’edificio era infatti presente una grande quantità di amianto in tutti gli impianti, rendendo così impossibile intervenire sugli impianti esistenti senza prima avere costruito un’impiantistica completamente autonoma ed indipendente da quella esistente). Oltre ad avere vinto l’appalto concorso internazionale, la forza delle nostre argomentazioni tecniche, energetiche, economiche, gestionali e realizzative è stata tale che la Regione Lombardia si è fatta promotrice dell’adeguamento di tutte le leggi e norme tecniche coinvolte per permettere l’utilizzo dell’acqua di falda ai fini tecnologici. In particolare l’acqua di falda viene utilizzata per effettuare - nel periodo estivo: - il pre-raffreddamento dell’aria di rinnovo (risparmio energetico stimato pari al 50% circa del carico frigorifero attribuibile al solo trattamento dell’aria primaria) - lo smaltimento del calore di condensazione dei gruppi frigoriferi centralizzati e delle unità di climatizzazione autonome locali; l’utilizzo di acqua di falda permette di ottenere temperature di condensazione più basse che negli impianti tradizionali ad acqua di torre, migliorando l’efficienza energetica delle macchine e, consentendo una sensibile riduzione dell’energia elettrica assorbita a parità di energia frigorifera generata, realizzando un ulteriore risparmio energetico pari almeno al 20% riferito all’intero carico frigorifero - nel periodo invernale - le unità di climatizzazione autonome invertono il proprio ciclo funzionale in “pompa di calore” e, sfruttando quale “pozzo freddo” l’acqua di falda, provvedono al riscaldamento dell’edificio con efficienze energetiche elevatissime. 4 Regione Lombardia P i r e l l i ’s S k y s c r a p e r Complete refurbishment of all technological plants Milan D E S I G N D ATA Building area: about 60.000 sqm Project start: 1997 1.2 Commissioned by: Eleca Spa (Cantù) Services provided by ARIATTA: Detailed design for Tender This is the project that represented a turning point in the approach to energy related themes by the city of Milan. The project dates back to 1997 and concerned the complete refurbishment only of the technological plants within the entire building, to be realized with the building constantly in use (just one or two floors at a time was/were emptied of people). Although, at that time, the use of groundwater for technological purposes was absolutely prohibited by all laws and technical norms in force in Lombardy, we still decided to propose the extensive use of groundwater for our project, demonstrating the great advantages of it in terms of energy/economic saving and practical feasibility of the intervention (in fact, a large quantity of asbestos was present in all plants, making it impossible to intervene on them without first implementing plants that needed to be completely independent from the existing ones). Besides winning the international tender, the strength of our technical, economic, operational arguments and our reasoning on energy and on the feasibility of the project was such that Regione Lombardia promoted the bringing in line of all existent laws and technical norms involved to allow the utilization of groundwater for technological purposes. In particular, groundwater is used for - in summer: - the pre-cooling of external air (estimated energy saving of around 50% of the cooling output needed to treat primary air) - the removal of condensation heat of the centralized refrigeration units and the local independent air conditioning units; the use of groundwater allows to reach lower condensation temperatures than in traditional water cooling tower systems, improving the energy efficiency of the machines and allowing a significant reduction in the electric energy absorbed for the same amount of cooling energy generated. As a result, a further energy saving of at least 20% on the total cooling output is achieved. - in winter: - the independent air conditioning units change into “heat pumps” and, exploiting groundwater as a “cold well”, provide heating to the building, achieving an extremely high level of energy efficiency. 5 City Life Srl To r r e Tc A To r r e I s o z a k i Milano 1.3 City Life Srl Tc A To w e r I s o z a k i ’s To w e r Milan D AT I D I P R O G E T TO Superficie dell’edificio: circa 79.000 mq Anno di inizio e fine progetto: 2007-2009 Cliente ARIATTA: City Life Srl Servizi prestati da ARIATTA: Progetto Preliminare (in collaborazione con PTM-MORIMURA Japan) e Definitivo per Appalto Design Architect: Arata Isozaki Associates (Tokyo) - Arata Isozaki Associati Srl (Milano) Ingegneria Strutturale: Favero & Milan (Mestre) - ARUP Italia Project management: MIPRAV (Milano) Edifici per ufficio utilizzabili in logica multi-tenant. - Potenza frigorifera complessivamente installata: 6,0 MW - Potenza termica complessivamente installata: 5,4 MW - Potenza elettrica complessivamente installata (MT+BT): 8,1 MW compreso quota parte utenti (2,8 MW) - Altezza complessiva dell’edificio: 225 m circa E’ l’edificio a torre più elevato in Italia. E’ alimentato energeticamente con acqua surriscaldata a 110°C dalla rete di teleriscaldamento urbano proveniente dalla centrale di termovalorizzazione di Figino. Per la produzione dell’energia frigorifera sono utilizzati gruppi frigo ad assorbimento. D E S I G N D ATA Building area: about 79.000 sqm Project start: 2007-2009 Commissioned by: City Life Srl Services provided by ARIATTA: Preliminary project (in co-operation with PTM-MORIMURA Japan) and Definitive Project for Tender Design Architect: Arata Isozaki Associates (Tokyo) - Arata Isozaki Associati Srl (Milan) Structural Engineering: Favero & Milan (Mestre) Project management: MIPRAV (Milan) Office buildings which can be used on a multi-tenant basis. - Total cooling power: 6 MW - Total thermal power: 5,4 MW - Total electric power (MV+LV): 8,1 MW including users quota (2,8 MW) - Total height of the building: about 225 m It is the tallest “tower” building in Italy. The energy is provided by superheated water (110°C) from the city teleheating net from the Figino incineration plant. Absorption refrigeration units are used for the production of cooling energy. 6 Inpartner (Milano) Galotti Spa (Bologna-Milano) Immobile Direzionale Santander9 Milano D AT I D I P R O G E T TO Superficie dell’edificio: circa 12.000 mq Anno di inizio e fine progetto: 2008 - 2009 Anno di inizio e fine cantiere: 2010 - in corso 1.4 Cliente ARIATTA: Starching Srl (Milano) Servizi prestati da ARIATTA: Progettazione e Direzione Lavori Design Architect: MCA - Mario Cucinella Architects (Bologna) Executive Architect: Starching Srl (Milano) Ingegneria Strutturale: CPEngineering (Milano) Project management: Starching Srl (Milano) La difficoltà del progetto è stata quella di coniugare un’architettura molto trasparente con il “Risparmio Energetico”. Gli schermi solari fissi esterni posti sulla facciata principale a SW sono stati studiati per massimizzare gli apporti gratuiti derivanti dall’irraggiamento per il riscaldamento invernale, e minimizzare le rientrate di calore estive. L’acqua di falda viene utilizzata in modo estensivo. Inoltre: • Recupero di calore dall’aria di espulsione come pre-riscaldamento o raffrescamento dell’aria esterna di rinnovo tramite l’utilizzo di recuperatori di calore di nuova generazione ad altissimo rendimento (>70%) • Macchine elettriche (trasformatori) a basse perdite • Campo fotovoltaico della potenza di 310kWp e della superficie complessiva di oltre 2.200 metri quadrati, capace di produrre energia sostenibile in grado di evitare l’emissione di circa 175t/anno di anidride carbonica. Il campo fotovoltaico, unitamente all’assenza di caldaie e all’utilizzo di pompe di calore ad acqua di falda, permette di avere EMISSIONI ZERO di CO2 in loco, riducendo drasticamente le emissioni di CO2 anche alla fonte (Centrale Termoelettrica di generazione dell’Ente erogatore). 7 Inpartner (Milan) Galotti Spa (Bologna-Milan) Santander9 Business building Milan D E S I G N D ATA Building area: around 12.000 sqm Project start: 2008 - 2009 Project finish: 2010 - in progress 1.4 Commissioned by: Starching Srl (Milan) Services provided by ARIATTA: Design and Site Supervision Design Architect: MCA - Mario Cucinella Architects (Bologna) Executive Architect: Starching Srl (Milan) Structural Engineering: CPEngineering (Milan) Project management: Starching Srl (Milan) The difficulty encountered in the project was the combination of a very transparent architectural design with “Energy Saving”. The fixed sun panels on the main SW façade have been studied to maximize the solar radiation intake for free heating in winter and minimize it in summer. Groundwater is extensively used. Besides: • Heat recovery from extracted air to pre-heat or cool the external air through the use of the latest generation high efficiency heat recuperators (>70%) • Low power loss electrical machines (transformers) • Photovoltaic Array, with a peak power of 310kWp, for a total area of over 2.200 sqm, able to provide sustainable energy, reducing carbon dioxide emissions of about 175 t/year. The Photovoltaic Array, in conjunction with the absence of gas-fired boilers and the use of heat pumps working on groundwater, allows to achieve ZERO EMISSIONS on site as far as carbon dioxide is concerned, considerably reducing also carbon dioxide emissions at source (Thermoelectric Power Station of the supplying company). 8 Dav ide Campari Spa Headquarter Campari Sesto San Giovanni (Mi) 1.5 Davide Campari Spa Campari Headquarters Sesto San Giovanni (Mi) D AT I D I P R O G E T TO Superficie dell’edificio: 13.000 mq Anno di inizio e fine progetto: 2006 - 2007 Anno di inizio e fine cantiere: 2008 - 2009 Cliente ARIATTA: Davide Campari Spa Servizi prestati da ARIATTA: Progettazione e Direzione Lavori Design Architect: Mario Botta Architetto (Lugano CH) Executive Architect: Giancarlo Marzorati (Sesto S.Giovanni - Mi) Ingegneria Strutturale: Moretti Spa Project management: Moretti Spa L’edificio è imponente e articolato su due corpi di fabbrica principali incernierati tra loro. L’uno denominato torre ha 9 piani fuori terra e due piani interrati, mentre l’altro ha la conformazione di un ponte e ha due soli piani, il quarto e il quinto, oltre ai due interrati. Questi due edifici sono completati da due ulteriori porzioni, la prima costituita da un antico edificio industriale dell’inizio del secolo scorso che ospitava la vecchia fabbrica Campari e la seconda denominata lobby: una grande piazza caratterizzata da una copertura curvilinea che digrada verso uno specchio d’acqua e realizzata in legno lamellare con una copertura vegetale. Il vecchio edificio storico è oggi utilizzato come Museo della Davide Campari. L’impianto sfrutta al meglio la possibilità di usufruire dell’acqua di falda, utilizzando gruppi frigoriferi polivalenti a recupero del calore di condensazione e reversibili a pompa di calore. L’acqua di falda viene utilizzata anche per il pre-raffreddamento dell’aria esterna di rinnovo. In tutto il progetto Campari NON è stata realizzata alcuna centrale termica. D E S I G N D ATA Building area: 13.000 sqm Project start: 2006 - 2007 Project finish: 2008 - 2009 Commissioned by: Davide Campari Spa Services provided by ARIATTA: Design and Site Supervision Design Architect: Architect Mario Botta (Lugano CH) Executive Architect: Giancarlo Marzorati (Sesto S.Giovanni - Mi) Structural Engineering: Moretti Spa Project management: Moretti Spa The building has an imposing presence and is made up of two main bodies “hinged” together. The first, called “tower”, is made up of 9 floors above and 2 below ground whilst the second is shaped as a bridge, consisting of two floors - the fourth and the fifth - plus two floors underground. These two bodies are then accompanied by two other parts, the first of which is an old industrial building, dating back to the beginning of the last century, which used to host the old Campari factory, and a second part called “lobby”: a large square, with a very distinctive curvilinear covering, sloping down towards a sheet of water, made of laminar wood and a covering of vegetation. The old historical building has now been made into the Davide Campari Museum.The plant fully exploits the use of groundwater, utilizing recovered condensation multi-use refrigeration units, convertible into heat pumps. Groundwater is also used to pre-cool the external air supply. NO thermal power plant has been included in the Campari project. 9 Alenia Aeronautica Ampliamento Complesso Industriale Aeronautico Caselle Nord C a s e l l e ( To r i n o ) D AT I D I P R O G E T TO Superficie dell’edificio: 13.500 mq fabbricato polo gestionale 3.230 mq fabbricato ICT 1.250 mq fabbricato nuova mensa 2.890 mq fabbricato VVF/ manutenzione 3.400 mq fabbricato mensa esistente 320 mq fabbricato portineria 1.575 mq fabbricato nuovo polo tecnologico 26.165 mq totali Anno di inizio e fine progetto: 2009 1.6 Cliente ARIATTA: Studio Amati Srl Servizi prestati da ARIATTA: Progetto Definitivo per Appalto Integrato Design Architect: Studio Amati Srl - arch. Alfredo Amati Executive Architect: Studio Amati Srl - arch. Alfredo Amati Ingegneria Strutturale: Seico Srl ing. Sergio Tremi Il progetto è costituito da piu fabbricati, energeticamente alimentati: - dal polo tecnologico esistente relativamente agli edifici VVF/Manutenzione, Portineria e Mensa esistente - da un nuovo polo energetico/tecnologico relativamente agli edifici Polo gestionale, Data Center e Nuova Mensa. Il Polo Energetico/Tecnologico è essenzialmente costituito da: 1) una centrale frigo con potenza installata di 4,5 MWF (di cui 0,8MWF futuri) 2) una centrale termica con potenza installata di 3 MWT 3) una cabina elettrica con potenza installata di 6,4 MVA (con la predisposizione di altri 1,6 MVA per ottenere la completa ridondanza sul Data Center (configurazione A+B) 4) un sistema di energia di continuità con potenza installata pari a 1,5 MVA, più la predisposizione per un altro sitema da 1,5 MVA al fine di alimentare il Data Center in completa ridondanza (configurazione A+B) 5) un sistema di energia preferenziale (solo predisposizione) costituito da n° 2 Gruppi elettrogeni per una potenza totale di 2,5 MVA. 10 Alenia Aeronautica Enlargement Of “Caselle Nord” Industrial / Aeronautical Complex C a s e l l e ( Tu r i n ) D E S I G N D ATA Building area: 13.500 sqm operational pole building 3.230 sqm ICT building 1.250 sqm new canteen building 2.890 sqm fire fighting system/ maintenance building 3.400 sqm pre-existing canteen building 320 sqm reception building 1.575 sqm new technological pole building 26.165 sqm in total Project start: 2009 1.6 Commissioned by: Studio Amati Srl Services provided by ARIATTA: Definitive project for Integrated tender Design Architect: Studio Amati Srl - Architect Alfredo Amati Executive Architect: Studio Amati Srl - Architect Alfredo Amati Structural Engineering: Seico Srl Engineer Sergio Tremi The project consists of various buildings. The energy is provided by: - the pre-existing technological pole as far as the buildings accommodating the fire fighting system/maintenance area, the Reception and the existent Canteen are concerned; - a new energetic/technological pole as far as the Operational Pole, the Data Center and the new Canteen are concerned. The Energetic/Technological pole is basically made up of: 1) a cooling station with a cooling power of 4,5 MWF (0,8MWF of which in the future) 2) a thermal station with a power of 3 MWT 3) an electrical room with a power of 6,4 MVA, with prearrangement for further 1,6 MVA, to obtain the full redundancy on the Data Center (configuration A+B) 4) a system of continuous energy with a power of 1,5 MVA, plus a prearrangement for a further 1,5MVA system to feed the Data Center in full redundancy (configuration A+B) 5) a preferential energy system (prearrangement only) consisting of 2 generating sets for a total power of 2,5 MVA . 11 Zurich Italia Headquarter Zurich Italia Milano 1.7 Zurich Italia Zurich Italia Headquarters Milan D AT I D I P R O G E T TO Superficie dell’edificio: 25.000 mq Anno di inizio e fine progetto: 2006 - 2007 Cliente ARIATTA: Europarisorse - Maciachini Properties Srl Servizi prestati da ARIATTA: Progetto Esecutivo Design Architect: Scandurra Studio - arch Alessandro Scandurra Executive Architect: Studio Franzosi+Matricardi (Milano) - arch.Daniela Franzosi Ingegneria Strutturale: BMS Progetti Srl - ing.Sergio Sgambati Project management: Europarisorse Srl Edificio Corporate caratterizzato da elevatissime prestazioni in termini di confort e di qualità. - Potenza frigorifera complessivamente installata: 4,4 MW - Potenza termica complessivamente installata: 2,6 MW - Potenza elettrica complessivamente installata (MT+BT): 5,0 MW - potenza elettrica da gruppo elettrogeno: 2,0 MW All’interno del complesso sono presenti: - auditorium per 150 persone - mensa con cucina per 1000 pasti giorno - fitness center per 30 persone D E S I G N D ATA Building area: 25.000 sqm Project start: 2006 - 2007 Commissioned by: Europarisorse - Maciachini Properties Srl Services provided by ARIATTA: Detailed Design Design Architect: Scandurra Studio - Architect Alessandro Scandurra Executive Architect: Studio Franzosi+Matricardi (Milan) Architect Daniela Franzosi Structural Engineering: BMS Progetti Srl - Engineer Sergio Sgambati Project management: Europarisorse Srl Corporate building of the highest standard as far as comfort and quality are concerned. - Total cooling power: 4,4 MW - Total thermal power: 2,6 MW - Total electric power (MV+LV): 5,0 MW - Total electric power from generators: 2,0 MW Inside the complex there are: - auditorium seating 150 people - canteen with kitchen to serve 1000 meals a day - fitness centre for 30 people 12 Stam Europe Italia Immobile Direzionale Milano 1.8 Stam Europe Italia Business building Milan D AT I D I P R O G E T TO Superficie dell’edificio: 18.000 mq Anno di inizio e fine progetto: 2009 - progetto in corso Cliente ARIATTA: Arassociati Studio di Architettura (Milano) Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: Arassociati Studio di Architettura (Milano) arch. Massimo Scheurer Executive Architect: Arassociati Studio di Architettura (Milano) arch. Massimo Scheurer Ingegneria Strutturale: ing. Edoardo Guenzani (Gallarate - VA) Project management: MCM Srl - ing. Franco Mialich Il progetto è costituito da tre corpi di fabbrica, di cui due preminenti rispetto il complesso, collegati tra loro anche da percorsi coperti. Un corpo principale di cinque livelli fuori terra (PT più 4 piani) fa riferimento alla via Giovanni da Udine. Un secondo corpo di sei livelli fuori terra (PT più 5 piani) è riferito alla via Ludovico di Breme. Il terzo corpo è di più piccole dimensioni, è a due livelli e collega i primi due lungo il lato nord in modo da schermare la strada di servizio in cui sono organizzate le rampe d’accesso ai parcheggi e magazzini sotterranei. D E S I G N D ATA Building area: about 20.000 sqm Project start: 2009 - project in progress Commissioned by: Arassociati Studio di Architettura (Milan) Services provided by ARIATTA: Detailed design and Site Supervision Design Architect: Arassociati Studio di Architettura (Milan) Architect Massimo Scheurer Executive Architect: Arassociati Studio di Architettura (Milan) Architect Massimo Scheurer Structural Engineering: Engineer Edoardo Guenzani (Gallarate - VA) Project management: MCM Srl - Engineer Franco Mialich The project includes three bodies, two of which are predominant over the complex, connected between themselves also by covered paths. A main body (five levels above ground: ground floor plus 4 more floors) looks onto via Giovanni da Udine. A second body (six levels above ground: ground floor plus 5 more floors) looks onto via Ludovico di Breme. The third body is smaller, on two levels, and connects the first two bodies along the north side, hiding the service way where the access ramps to the underground parking lots and warehouses are placed. 13 L’ o r e a l I t a l i a Headquarter L’ o r e a l I t a l i a Milano 1.9 L’ o r e a l I t a l i a L’ o r e a l I t a l i a Headquarters Milan D AT I D I P R O G E T TO Superficie dell’edificio: 24.000 mq Anno di inizio e fine progetto: 2001 - 2002 Anno di inizio e fine cantiere: 2003 Cliente ARIATTA: Europarisorse - Primaticcio Properties Srl Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: Studio Architettura Beretta Associati arch.Gianmaria Beretta (Milano) Executive Architect: Studio Architettura Beretta Associati arch.Gianmaria Beretta (Milano) Ingegneria Strutturale: Redesco Srl - ing.Mauro Eugenio Giuliani Project management: Europarisorse L’intervento consiste nella trasformazione di un edificio preesistente di cui è stata mantenuta unicamente parte della struttura. Il complesso è costituito da tre piani fuori terra destinati ad uffici e da quattro piani sotto quota marciapiede di cui il primo è destinato ad attività comuni, e gli altri tre a parcheggio per 330 automobili. Gli impianti meccanici ed elettrici sono completamente modulari e totalmente riconfigurabili. Sono presenti all’interno dell’edificio spazi per attività integrative quali: - sale conferenze/riunioni - sale fitness - sale ristoro/caffetteria - sala ristorazione con cucina per 250 pasti Per ognuna delle attività sopra descritte è previsto un impianto di climatizzazione del tipo a tutt’aria dedicato. D E S I G N D ATA Building area: 24.000 sqm Project start: 2001 - 2002 Project finish: 2003 Commissioned by: Europarisorse - Primaticcio Properties Srl Services provided by ARIATTA: Detailed Design and Site Supervision Design Architect: Studio Architettura Beretta Associati Architect Gianmaria Beretta (Milan) Executive Architect: Studio Architettura Beretta Associati Architect Gianmaria Beretta (Milan) Structural Engineering: Redesco Srl - Engineer Mauro Eugenio Giuliani Project management: Europarisorse The intervention concerns the conversion of a pre-existing building, maintaining only part of its structure. The complex consists of three floors above ground, to be used as offices, and four floors under pavement level, the first of which is for common areas whilst the other three are to be used as parking areas for 330 cars. The mechanical and electric plants are completely modular and can be totally reconfigured. Areas for integrative activities are available within the building, such as: - conference/meeting rooms - fitness rooms - breakfast rooms/coffee room - canteen with kitchen to serve 250 meals For each of the above activities a dedicated “all air” conditioning system is provided. 14 Nexity Italia Edison Project N e w B u s i n e s s Pa r k Sesto San Giovanni (Mi) 1.10 Nexity Italia Edison Project New Business Park Sesto San Giovanni (Mi) D AT I D I P R O G E T TO Superficie dell’edificio: 30.000 mq Anno di inizio e fine progetto: 2007 Anno di inizio e fine cantiere: 2009 Cliente ARIATTA: Nexity Italia Servizi prestati da ARIATTA: Progettazione Esecutiva Design Architect: Garretti Associati Srl (Milano) - arch.Paolo Garretti Executive Architect: Garretti Associati Srl (Milano) - arch.Paolo Garretti Ingegneria Strutturale: BMS Progetti Srl - ing.Sergio Sgambati D E S I G N D ATA Building area: 30.000 sqm Project start: 2007 Project finish: 2009 Commissioned by: Nexity Italia Services provided by ARIATTA: Detailed Design Design Architect: Garretti Associati Srl (Milano) - Architect Paolo Garretti Executive Architect: Garretti Associati Srl (Milano) - Architect Paolo Garretti Structural Engineering: BMS Progetti Srl - Engineer Sergio Sgambati Il progetto è costituito da tre corpi di fabbrica, di cui due a doppio corpo. E’ il primo esempio in Italia di impianto di climatizzazione a utilizzare il sistema MTA di Carrier; l’impianto è totalmente flessibile e riconfigurabile pur NON richiedendo l’utilizzo di controsoffitti ispezionabili.. Tutte le MTA (assimilabili a fan-coil canalizzabili ad alta prevalenza) sono installate in locali tecnici di piano, dai quali partono le canalizzazioni di mandata e ripresa verso gli uffici modulari. Nessuna ispezionabilità richiesta all’interno degli uffici occupati; tutte le operazioni di manutenzione vengono effettuate nei locali tecnici. The project consists of three main sections, two of which are made up of two bodies each. It is the first example of air conditioning using the Carrier MTA system in Italy; the system is completely flexible and reconfigurable, with NO need for false ceilings allowing access for inspections. All MTA units (similar to high head ductable fan coil units) are installed in the technical rooms on the floor, where the ducting supply and return towards the modular offices start. No need for access from inside the offices in use; all maintenance operations are carried out in the technical rooms. 15 Immsi Spa Headquarter Immsi Milano 1.11 Immsi Spa Immsi Headquarters Milan D AT I D I P R O G E T TO Superficie dell’edificio: 2.300 mq Anno di inizio e fine progetto: 2009 Anno di inizio e fine cantiere: 2010 Cliente ARIATTA: Immsi Spa Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: aMDL Srl - arch. Michele De Lucchi (Milano) Ingegneria Strutturale: Redesco Srl - ing. Mauro Eugenio Giuliani (solo rinforzi strutturali) Project management: arch. Ruggero Ercoli (Milano) Ristrutturazione integrale di un edificio dei primi del ‘900 per la realizzazione degli uffici corporate e di rappresentanza di PIAGGIO e della società IMMSI avente sede principale a Roma. D E S I G N D ATA Building area: 2.300 sqm Project start: 2009 Project finish: 2010 Commissioned by: Immsi Spa Services provided by ARIATTA: Detailed design and Site Supervision Design Architect: aMDL Srl - Architect Michele De Lucchi (Milan) Structural Engineering: Redesco Srl - Engineer Mauro Eugenio Giuliani (structural reinforcements only) Project management: Architect Ruggero Ercoli (Milano) Complete renovation/reconstruction of a building, originally built at the beginning of the 1900’s, to create corporate or representative offices for PIAGGIO and for IMMSI, whose head office is in Rome. 16 Sky Italia Headquarter Sky Italia - Edificio 3 Milano 1.12 Sky Italia Headquarter Sky Italia - Building 3 Milan D AT I D I P R O G E T TO Superficie dell’edificio: 24.200 mq comprenso edificio Ponte verso attuale edificio 2 Anno di inizio e fine progetto: 2007 - 2008 Cliente ARIATTA: Sviluppo Comparto 3 (Sc3) - Gruppo Risanamento Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: Byron Harford & Associates (Sydney) Executive Architect: Studio Franzosi+Matricardi (Milano) arch. Andrea Matricardi Ingegneria Strutturale: MSC Associati Srl (Milano) Edificio Corporate progettato e costruito comunque con la flessibilità impiantistica tipica di un edificio multi-tenant. - Potenza frigorifera complessivamente installata: 3,9 MW - Potenza termica complessivamente installata: 2,0 MW - Potenza elettrica complessivamente installata (MT+BT): 2,8 MW. DESIGN DATA Building area: 24.200 sqm including the “Bridge” building leading to Building 2 Project start: 2007 - 2008 Commissioned by: Development Of Division 3 (Sc3) - Recovery Group Services provided by ARIATTA: Detailed Design and Site Supervision Design Architect: Studio Amati Srl - Byron Harford & Associates (Sydney) Executive Architect: Studio Franzosi+Matricardi (Milan) - Architect Andrea Matricardi Structural Engineering: MSC Associati Srl (Milan) Corporate building designed and built to allow a flexible use of the plants, typical of a multi-tenant building. - Total cooling power: 3,9 MW - Total thermal power: 2,9 MW - Total electric power (MV+LV): 2,8 MW. 17 Hines Italia Po r t a N u o v a Garibaldi Edifici E1 - E2 Milano 1.13 Hines Italia Porta Nuova Garibaldi Buildings E1 - E2 Milan D AT I D I P R O G E T TO Superficie dell’edificio: 19.500 mq Anno di inizio e fine progetto: 2007 - 2009 Anno di inizio e fine cantiere: 2010 - in corso Cliente ARIATTA: Hines Italia Servizi prestati da ARIATTA: Progetto Preliminare (in collaborazione con Buro Happold UK), Definitivo ed Esecutivo; supporto tecnico alla Direzione Lavori Design Architect: Piuarch - ing. Gino Garbellini (Milano) Executive Architect: Tekne Spa (Milano) Ingegneria Strutturale: MSC Associati Srl (Milano) Project management: J & A (Milano) Sfrutta al meglio la possibilità di utilizzare l’acqua di falda e di poterla restituire in un corso d’acqua superficiale posizionato immediatamente al confine del lotto di intervento (Martesana). Gli impianti utilizzano gruppi frigoriferi polivalenti a recupero del calore di condensazione e reversibili a pompa di calore. L’acqua di falda viene utilizzata anche per il pre-raffreddamento dell’aria esterna di rinnovo. In tutto il progetto Porta Nuova Garibaldi NON è stata realizzata alcuna centrale termica. D E S I G N D ATA Building area: 19.500 sqm Project start: 2007 - 2009 Project finish: 2010 - in progress Commissioned by: Hines Italia Services provided by ARIATTA: Preliminary design (in co-operation with Buro Happold UK), Definitive and Detailed Design; Technical support to Site Supervision Design Architect: Piuarch - Engineer Gino Garbellini (Milano) Executive Architect: Tekne Spa (Milan) Structural Engineering: MSC Associati Srl (Milan) Project management: J & A (Milan) It fully exploits the possibility to use groundwater (renewable energy resource) and then drain it in a waterway running right on the limits of the intervention site (Martesana). The plants utilize condensation heat recovery multi-use refrigeration units convertible into heat pumps. Groundwater is also used to pre-cool the external air supply. NO thermal power plant has been realized within the Porta Nuova Garibaldi project. 18 Danielli Spa Immobile Direzionale Milano 1.14 Danielli Spa Business Building Milan D AT I D I P R O G E T TO Superficie dell’edificio: 5.900 mq Anno di inizio e fine progetto: 2003 Anno di inizio e fine cantiere: 2004 - 2006 Cliente ARIATTA: Danielli Spa Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: Studio Architettura Beretta Associati - arch.Gianmaria Beretta (Milano) Executive Architect: Studio Architettura Beretta Associati - arch.Gianmaria Beretta (Milano) Ingegneria Strutturale: ing. Marco Verdina - ing. Gennaro Guala Realizzato su un’area industriale dismessa in posizione di grande visibilità all’ingresso delle autostrade per il Nord. L’edificio è costituito da una torre quadrata posta su una piastra di servizi per un totale di 14 piani fuori terra, e da un interrato destinato a parcheggi e magazzini. D E S I G N D ATA Building area: 5.900 sqm Project start: 2003 Project finish: 2004 - 2006 Commissioned by: Danielli Spa Services provided by ARIATTA: Detailed design and Site Supervision Design Architect: Studio Architettura Beretta Associati - Architect Gianmaria Beretta (Milan) Executive Architect: Studio Architettura Beretta Associati - Architect Gianmaria Beretta (Milan) Structural Engineering: Engineer Marco Verdina - Engineer Gennaro Guala Built on an abandoned industrial area, the building has great visibility being placed at the entrance of the motorways going north. The building consists of a square tower, rising from the technical areas for a total of 14 floors above ground, and a basement to be used for parking and warehouses. 19 Europarisorse - Maciachini Properties Srl Maciachini Center - B u s i n e s s Pa r k - Lotto 1 Milano 1.15 Europarisorse - Maciachini Properties Srl Maciachini Center - Business Park - Lot 1 Milan D AT I D I P R O G E T TO Superficie dell’edificio: 20.000 mq (edifici 1, 2+3, 9) Anno di inizio e fine progetto: 2004 Anno di inizio e fine cantiere: 2006 Cliente ARIATTA: Europarisorse - Maciachini Properties Srl Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: Kconsult Engineering Srl - arch. Maurice Kanah Executive Architect: Kconsult Engineering Srl - arch. Maurice Kanah Ingegneria Strutturale: Pro Ing Srl - Planning Srl (Bologna), Ing. Marco Chiocchini, Ing. Stefano Neri Project management: Europarisorse E’ il primo progetto nel quale, pur non essendo disponibile alcuna risorsa di tipo geotermico, e pur in presenza di una situazione climatica invernale relativamente “impegnativa”, si è affidata comunque la generazione delle energie calda e fredda a Gruppi Frigoriferi di tipo POLIVALENTE, reversibili a Pompa di Calore, raffreddati ad ARIA e senza alcuna caldaia di emergenza. I gruppi frigoriferi polivalenti funzionano fino a temperature esterne di -15°C. Il COP (C.O.P.=Coefficient of Performance) definito quale rapporto tra l’energia termica uscente (energia termica di raffreddamento + energia termica di riscaldamento=energia uscente), e l’energia entrante nel sistema (energia elettrica=energia entrante), data la particolare configurazione della centrale termofrigorifera e di tutti gli impianti da essa alimentati, è sempre ai livelli massimi ottenibili in relazione alle condizioni termoigrometriche e di utilizzo del “Sistema Edificio/Impianto”. D E S I G N D ATA Building area: 20.000 sqm (buildings 1,2+3, 9) Project start: 2004 Project finish: 2006 Commissioned by: Europarisorse - Maciachini Properties Srl Services provided by ARIATTA: Detailed design and Site Supervision Design Architect: Kconsult Engineering Srl - Architect Maurice Kanah Executive Architect: Kconsult Engineering Srl - Architect Maurice Kanah Structural Engineering: Pro Ing Srl - Planning Srl (Bologna), Engineer Marco Chiocchini, Engineer Stefano Neri Project management: Europarisorse This is the first project where, despite no geothermal resources being available and “uneasy” winter weather conditions, the energy generation (hot and cold) is provided by MULTI-USE refrigeration units convertible into heat pumps, cooled down by AIR and with no emergency boilers. The multi-use refrigeration units run up to -15° C outside temperature. Once considered the particular configuration of the thermofrigorific power station and all plants fed by it, the COP (C.O.P.=Coefficient of Performance) - defined as the ratio between the outgoing thermal energy (thermal cooling energy + thermal heating energy =outgoing energy) and the energy going into the system (electric energy=ingoing energy) - is always at the highest obtainable levels, considering the thermo-hygrometric conditions and the conditions of use of the “Building/Plant System”. 20 Doughty Hanson & Co. - Europarisorse Srl Bodio Center - B u s i n e s s Pa r k Milano D AT I D I P R O G E T TO Superficie dell’edificio: 60.000 mq Anno di inizio e fine progetto: 2001 Anno di inizio e fine cantiere: 2005 1.17 Cliente ARIATTA: Aukett & Garretti Srl (Oggi Garretti Associati Srl) Servizi prestati da ARIATTA: Progettazione Esecutiva e Direzione Lavori Design Architect: Aukett & Garretti Srl (Oggi Garretti Associati Srl) Executive Architect: Aukett & Garretti Srl (Oggi Garretti Associati Srl) Ingegneria Strutturale: BMS Progetti Srl (Milano) Project management: Europarisorse Caratteristica del lavoro è stata la ricerca di soluzioni progettuali che permettessero estrema rapidità ed efficienza realizzativa oltre al contenimento dei costi di realizzazione e di gestione. L’attività di progettazione è partita nell’autunno 2001; il 30/6/2002 veniva consegnato all’utilizzatore finale MARSH il primo edificio di 6.000mq circa; il 31/12/2002 venivano consegnati all’utilizzatore finale Unicredito altri due edifici per 25.000 mq circa. E’ il primo progetto nel quale, pur non essendo disponibile alcuna risorsa di tipo geotermico, e pur in presenza di una situazione climatica invernale relativamente “impegnativa”, si è affidata comunque la generazione delle energie calda e fredda a Gruppi Frigoriferi di tipo POLIVALENTE, reversibili a Pompa di Calore, raffreddati ad ARIA.. Il COP (C.O.P.=Coefficient of Performance) definito quale rapporto tra l’energia termica uscente (energia termica di raffreddamento + energia termica di riscaldamento=energia uscente), e l’energia entrante nel sistema (energia elettrica=energia entrante), data la particolare configurazione della centrale termofrigorifera e di tutti gli impianti da essa alimentati, è sempre ai livelli massimi ottenibili in relazione alle condizioni termoigrometriche e di utilizzo del “Sistema Edificio/Impianto”. In quel periodo dell’anno in cui è preponderante la generazione di energia fredda (estate e periodi medio stagionali), tutta l’energia calda distribuita alle utenze viene prodotta “senza alcun costo energetico”. Al contrario, in quel periodo dell’anno in cui è preponderante la generazione di energia calda (inverno), tutta l’energia fredda distribuita alle utenze viene prodotta “senza alcun costo energetico”. Sono state previste delle caldaie di emergenza da utilizzarsi solo in caso di indisponibilità delle pompe di calore (guasti, manutenzioni programmate, ecc.) 21 Doughty Hanson & Co. - Europarisorse Srl Bodio Center - Business Park Milan D E S I G N D ATA Building area: 60.000 sqm Project start: 2001 Project finish: 2005 1.17 Commissioned by: Aukett & Garretti Srl (Now Garretti Associati Srl) Services provided by ARIATTA: Detailed design and Site Supervision Design Architect: Aukett & Garretti Srl (Now Garretti Associati Srl) Executive Architect: Aukett & Garretti Srl (Now Garretti Associati Srl) Structural Engineering: BMS Progetti Srl (Milan) Project management: Europarisorse A distinctive aspect of this work was the search for design solutions allowing an extremely fast and efficient implementation, yet limiting its cost and operating expenses. The design work started in autumn 2001; on 30th June 2002 the first building of around 6.000 sqm was handed over to the end user, MARSH; on 31st December 2002 further two buildings, for around 25.000 sqm, were handed over to the end user, Unicredito This is the first project where, despite no geothermal resources being available and “uneasy” winter weather conditions, the energy generation (hot and cold) is provided by MULTI-USE refrigeration units convertible into heat pumps, cooled down by AIR. Once considered the particular configuration of the thermofrigorific power station and all plants fed by it, the COP (C.O.P.=Coefficient of Performance) - defined as the ratio between the outgoing thermal energy (thermal cooling energy + thermal heating energy =outgoing energy) and the energy going into the system (electric energy=ingoing energy) - is always at the highest obtainable levels, considering the thermo-hygrometric conditions and the conditions of use of the “Building/Plant System”. In that period of the year when energy is mainly needed for cooling (summer and mild seasons), all energy for “heating”, distributed to users, is generated “at no energy cost”. On the contrary, in that period of the year when the generation of heating energy is predominant (winter), all energy for cooling, distributed to users, is generated “at no energy cost”. Emergency boilers are foreseen, to be used only in case the heat pumps should not work (breakdown, planned maintenance, etc.) 22