References on tube and transport analysis Line C - New tube line in Rome - Section T4 S.Giovanni-Malatesta Reference on tube and transport analysis Client: Metro C S.C.P.A. Team mebers: VIA ingegneria SrL Mission: Detailed design of the new line C of the tube in Rome-Section T4 S.Giovanni-Malatesta Location: Roma (RM) Cosnstruction cost: € 50.000.000 Year of implementation: ongoing Progress: Design completed. Works in progress Reference on tube and transport analysis New light railway between Lunghezza and Guidonia, Roma Client: RFI SpA Team members: VIA ingegneria SrL Mission: Detailed design and Study of Environemntal assessment of the new ligh railway between Lunghezza and Guidonia Location: Guidonia (RM) Year of implementation: 2003 - 2009 Construction cost: 82.075.000 euro Progress: Design approved Contact: Via Marsala 9 - 00185 Roma Tel. 0647206226 Line B1 - New line tube of Roma Reference on tube and transport analysis Client: Roma Metropolitane SrL Team members: VIA ingegneria SrL Mission: Detailed design of the new line B1 of Rome Location: Roma (RM) Year of implementation: 2005 Progress: Design completed. Works in progress Project Financing dof the light train on wheels - Latina Client: Comune di Latina Team members: VIA ingegneria SrL Mission:Support to detailed design Location: Latina (LT) Year of implementation: 2006-ongoing Construction cost: 71.900.000 Euro Progress:Design approved Contact: Tel. 0773.400832 Design of the new light train - Lines A and C Client: Pizzarotti SpA Team members: VIA ingegneria SrL Mission:Detailed design - Tender stage Location: Parma (PR) Year of implementation: 2007-ongoing Construction cost: 71.800.000 Euro Progress:Winner of the tender stage Reference on tube and transport analysis Design of the light coastal connection - Rimini-Fiera/Cattolica Client: Agenzia per la mobilità della Provincia di Rimini/Italiana COstruzioni SpA/ Balfour Beatty Rail SpA Team members: VIA ingegneria SrL Mission: Detailed design Location: Rimini (RI) Year of implementation: 2007 Construction cost: 32.670.000 Euro Progress:Design approved, contractor to start works on site Railway Trento - Malè from Marilleva 900 to Mezzana Client: Trentino Trasporti S.p.A. Team members: VIA ingegneria SrL, Systra S.A., IC SrL, Systra Sotecni SpA, Geologia Applicata Studio Associato Assignment: Design of the new railway station along the Trento - Malè/Mezzana Mission: Detailed design all stages Location: Malè (TN) Year of implementation: 2011-ongoing Construction cost: 15.540.000 euro Progress: Design ongoing Contact: Autorimessa - Piazza Garibaldi 38027 Malè (TN) Tel. 0463-901587 Transport analysis of the “Passante Est di Tivoli” - Tivoli (RM) Client: Comune di TIvoli/Provincia di Roma Team members: VIA ingegneria SrL Mission: Detailed design Location: Tivoli (RM) Year of implementation: 2010-ongoing Progress: Design in progress Transport analysis of the new port in Ancona Client: Autorità Portuale di Ancona Team members: VIA ingegneria SrL Mission: Study of Environemntal Assessment Location: Ancona (AN) Year of implementation: 2009-2010 Construction cost: 283.850.000 Euro Progress: Design approved Contact: Tel. 071.2078925 Client: Consorzio ASI di Siracusa Team members: VIA ingegneria SrL Mission: Design all stages Location: Augusta (SR) Year of implementation: 2005-2007 Construction cost: 103.480.000 Euro Progress: Design approved. Works completed Contact: Tel. 071.2078925 Transport anlysis inside the feasibility study of the new light transport link TPL - Terni Client: Comune di Terni Team members: VIA ingegneria SrL Mission: Feasibility and preliminary study Location: Terni Year of implementation: 2006-2008 Progress: Design approved. Works completed Reference on tube and transport analysis Transport analysis inside the Study of Environmental Assessment - Augusta (SR) Transport analisys of the enlargment of Tiburtina route - Tivoli Client: Comune di Tivoli/Provincia di Roma Team members: VIA ingegneria SrL Mission: PRUSST Asse Tiburtino - GT4 - GT11/12 - GT14A - PPreliminary design and Study of Environmental Assessment Location: Tivoli (RM), Italia Year of implementation: 2004 - 2006 Construction cost: 15.620.000 Euro Progress: Design approved New Traffic Urban plan - Argenta Client: Comune di Argenta Team members: VIA ingegneria SrL with Ing. Michele Tarozzi Mission: New Traffic Urban Plan - Design coordinator Location: Argenta (FE), Italia Year of implementation: 2011 Progress: Completed Reference on tube and transport analysis Transport analisys of the underground parking inside the Molo San Cataldo - Taranto Client: Autorità Portuale di Taranto Team members: VIA ingegneria SrL with Ing. Michele Tarozzi Mission: Transport analisys of the underground parking inside the Molo San Cataldo - Taranto Location: Taranto (TA), Italia Year of implementation: 2011 Progress: Completed Feasibilty study concerning the transport link between the airport and the railway station Forlì Client: Comune di Forlì Team members: VIA ingegneria SrL with Ing. Michele Tarozzi Mission: Feasibility study of the new link between airport and railway station Location: Forlì (FO), Italia Year of implementation: 2004-2005 Progress: Completed Legal office: Via Giorgio Vasari 4 00196 Roma Office: Via Flaminia Vecchia, 999 00189 Roma Tel. +39 06 3327441 Fax +39 06 33219798 e: [email protected] w: via.it