Ansaldo Ricerche s.r.l.
Progetto
Identificativo
project
document no.
TESLA DAMPING RING
S02957UX3000.
File: 0s-primo-1
Cliente
Comm.-s/comm.
Emittente
Pagina Di
client
job. no.
issued by
page
I.N.F.N.
UX3.000
of
1
ARI/TME/MTM
7
Rag. disc.
Rif. str. prod. Identificativo componente
Tipo doc. Cl. ris.
Allegati
disc.code
prod. str.
no
doc type
enclosures
N/A
equipment identification code
Damping Ring
class
S
.N/A
Titolo
Derivato da
title
derived from
No
TIME SCHEDULE FOR THE CONSTRUCTION OF
----------------------------------------------------------------------------
Sostituisce
«DAMPING RING TESLA»
Stato validita`:
substitutes
Issue dated 04/12/2000
rev.scope
Barbagelata
Luigi
0
04/12/20000
Rev
.
Data
Descrizione
date
description
rev.
Issue
Stato
valid
.
rev.
scope
Redazione
prepared by
Grattarola
Marco
Rosatelli
Franco
Controllo
approvazione
checked by/
checked by/
approved by
Autorizzazio
ne
emissione
issue
authorization
Informazioni strettamente riservate di proprietà Ansaldo Ricerche srl - Da non utilizzare per scopi diversi da quelli per cui sono state fornite
confidential information, property of Ansaldo Ricerche srl - not to be used for any purpose other than that for which is supplied
Ansaldo Ricerche s.r.l.
Progetto
Project
TESLA DAMPING RING
Identificativo
Document no.
SO2957UX3000L.
Rev.
Rev.
0
Pagina
Page
2
INDEX
1.
OBJECT .................................................................................................................................................................. 3
2.
REFERENCES ...................................................................................................................................................... 3
3.
ACTIVITIES ...................................................................................................................................................... 4÷7
3..1. Full ARI Time Schedule..................................................................................................................... 4
3..2. Legend of item 3.1. ............................................................................................................................ 5
3..3. Time Schedule - Engineering and Manpower..................................................................................... 6
3..4. Detailed Time Schedule - Assembly and Cabling .............................................................................. 7
S02957 (time schedule).doc
Ansaldo Ricerche s.r.l.
Progetto
Project
TESLA DAMPING RING
Identificativo
Document no.
SO2957UX3000L.
Rev.
Rev.
Pagina
Page
0
1. OBJECT
The object of the present specification is:
1. To exhibit an abstract of the Time Schedule the Customer agreed to.
2. REFERENCES
The present specification invokes the following documents:
1.
List of deliverables, whose version dated 22/11/1999 has been provided by INFN.
2.
Tesla Conceptual Design Report
3.
ARI Procedure n. P0111767000L DEL 13/12/99.
4.
ARI Manufacturing Specification :
n.°S02958UX3000L
n.° S02975UX3000L
n.° S02977UX3000L
n.° S02982UX3000L
n.° S02983UX3000L
referring to « Multipole Girders/Support»
referring to « D.R. Vacuum Chambre»
referring to « Vacuum Chamber Supports»
referring to « Special Magnets V. C. (Wigglers)»
referring to « Beam Diagnostics»
ref.n. INFN 1.4.1.8
ref.n. INFN 1.4.4.1
ref.n. INFN 1.4.4.3
ref.n. INFN 1.4.4.8
ref.n. INFN 1.4.5
5.
Supply Specifications:
n.° S02978UX3000L referring to « Pumps and Power Supplies»
ref.n. INFN 1.4.4.4
n.° S02979UX3000L referring to « Vacuum Diagnostic»
ref.n. INFN 1.4.4.5
n.° S02980UX3000L referring to « Manual and Automatic Valves»
ref.n. INFN 1.4.4.6
n.° S02981UX3000L referring to « Control Units»
ref.n. INFN 1.4.4.7
n.° S02991UX3000L referring to « General Services»
ref.n. INFN 1.6÷1..9-1.14-1.15
n.° S02995UX3000L referring to « Handling Equipment and Cranes» ref.n. INFN 1.10
n.° S02996UX3000L referring to « Tunnel Transport System»
ref.n. INFN 1.11
n.° S03003UX3000L referring to « Alignement Facilities»
ref.n. INFN 1.12
n.° S03004UX3000L referring to « Inst. Time Schedule and Manpower» ref.n. INFN 1.13
n.° S03007UX3000L referring to « Test and Acceptance Tests»
ref.n. INFN 1.17
6.
Manpower Specifications:
n.° S03005UX3000L referring to « Inst. Time Schedule and Manpower.»ref.n. INFN 1.13
n.° S03008UX3000L referring to « Engineering and Q.A.»
ref.n. INFN 1.19
S02957 (time schedule).doc
3
Ansaldo Ricerche s.r.l.
Progetto
Project
TESLA DAMPING RING
Identificativo
Document no.
SO2957UX3000L.
3. ACTIVITIES
3.1. Full ARI Time Schedule (date 20 december 2000)
S02957 (time schedule).doc
Rev.
Rev.
0
Pagina
Page
4
Ansaldo Ricerche s.r.l.
Progetto
Project
TESLA DAMPING RING
3 ACTIVITY
3.2 Legend of item 3.1
S02957 (time schedule).doc
Identificativo
Document no.
SO2957UX3000L.
Rev.
Rev.
0
Pagina
Page
5
Ansaldo Ricerche s.r.l.
Progetto
Project
Identificativo
Document no.
TESLA DAMPING RING
Rev.
Rev.
SO2957UX3000L.
0
3.3 . Time Schedule - Engineering and Manpower
ENGINEERING
hours
Ref.
Elect.
Wigglers
19872
9360
8736
8896
46864
Site
Site
66days x 6oh/d (6 people)
51days x 160h/d (16 people)
315days x 64h/d (8 people)
69days x 160h/d (16 people)
(See pag.7)
281days x 96h/d (4 people) x 3 Constructors
300days x 120h/d (4 people) x 3 Constructors
(See pag.7)
87days x120h/d (12 people)
60days x 120h/d (12 people)
Elect.
Wigglers
3960
8160
20160
11040
176686
26976
36000
77561
10440
7200
Total
378183
61
249days x 120h/d (12 people)
29880
x
62
90days x 80h/d (8 people)
7200
x
4
5
6-7
8
Total
1242days (total) x 16h (2E)
390days x 24h (2E+1D)
262+284days x 16h (2d+1dE+1dH)
556days x 16h (2t)
x
x
Lab.
In Ge.
x
x
x
x
MANPOWER
hours
Ref.
51
52
53
54
55
56
57
58
59
60
S02957 (time schedule).doc
Lab.
In Ge.
x
x
x
x
x
x
x
x
x
Pagina
Page
6
Ansaldo Ricerche s.r.l.
Progetto
Project
TESLA DAMPING RING
Identificativo
Document no.
Rev.
Rev.
SO2957UX3000L.
0
3.4 Detailed Time Schedule - Assembly and Cabling
ASSEMBLY
Reference
Activity
55
Elect.
Wigglers
1.7
1.8
1.9
Process Water Facilities
Cooling and Ventilation Systems
Compressed Air Facilities
147176
8416
3628
1.14
1.15
Fire Detection Systems
Smoke Extraction Systems
16690
768
Total hours
176678
CABLING
Reference
Activity
58
1.4.4.4
1.4.4.5
1.4.4.6
1.4.5
1.6
1.8
1.9
1.10
1.11
1.14
1.15
total hours
S02957 (time schedule).doc
Elect.
Wigglers
Pumps and Power Supplies(n.2468 x 3h/each)
Vacuum diagnostic (n.1611 x 2h/each)
Automatic Valves (n.258 x 4h/each)
Beam Diagnostic (n. 4p x 1 year)
Electrical Services
Cooling and Ventilation System
Compressed Air Facilities
Cranes (n. 3oc x 1t x 1 year)
Tunnel transport System( n. 3oc x 1t x 1 year)
Fire Detection System
Smoke Extraction System
7374
3222
1032
8000
40473
400
160
8000
8000
500
400
77561
Pagina
Page
7