The Project
• Starting date: January 1st , 2012
• End date: December 31st , 2013
• Duration: 24 Months
Partnership:
• Consiglio Nazionale universitario
per le Telecomunicazioni
• Istituto Nazionale di Geofisica e Vulcanologia
• Observatori de l’Ebre
• National Observatory of Athens
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
2
The Aim of the Project
In case of wide scale terroristic or attacks able to render
useless Internet links the aim of the Project named
SWING was:
1. to establish the basis for a South European robust
radio network, based on SW architecture;
2. to utilize innovative ionospheric sounding techniques
and real time signal processing and forecasting, to
support Critical Infrastructure communications, both
short and long range.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
3
The Aim of the Project
In fact the potential risk of wide scale terrorist attacks
able to put out of order, for a long period, the internet
connections capabilities exposes the some European
Critical Infrastructures (ECIs), like electric power
distribution and production infrastructure, CPAs, safety
and defense organization, water distribution agency,
airports, etc. in a stage of vulnerability because of some
essential information are transferred by means of
internet both for management and control.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
4
The Aim of the Project
The aim of SWING was to study a high survival HF radio
network (data/voice) to real time support of ECIs
communications, maintaining the minimum flux of
essential information for the management and control in
case of wide scale terrorist attacks able to render internet
links useless over the Mediterranean region.
This will increase the awareness of ECIs operator in the
extreme case of the complete broadband failure of the
communication.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
5
Objectives
1.
To study internet communications criticality.
2.
To analyze the requirements necessary to ECIs and CGAs
management and control.
3.
To develop a communication protocols in order to define
standard software and hardware tools supporting reliable and
interoperable Short Wave radio communication techniques for
ECIs and CGAs protection.
4.
To study the frequency management system taking into account
the special characteristics of the ionospheric channel.
5.
To design a radio-communication architecture for a distributed
South European short wave radio network.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
6
The Aim of the Project
Target groups
Agencies and institution devoted to management of
Critical Infrastructures that are linked by internet
network.
Expected results
The project is finalized to demonstrate the feasibility of a
network high survival HF communication as buck-up
and independent system to ensure minimum
management and communication requirements, in the
case of internet failure due to a terrorist attack.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
7
Activities and Deliverables
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Interface with EU authorities and coordination.
Technical analysis of the communication problems related to the identification and designation of CIs in the
interested area.
Determination of the topology of high survival radio communication network.
Characterization of the minimal amount of information necessary for the survival of the CIs communication.
Operative supervision of the network architecture.
6-Analysis of the existing architecture of HF communication based on internet protocol access with reference
to the above considered infrastructures.
Analysis of existing HF connection system in terms of software and hardware for internet connection.
Definition of the High survival HF radio network technical requirements.
Radio network system design.
Criteria of early warning alert and procedures to activate the back up network.
Monthly prediction of the hourly HF set of frequencies over the n radio links given by the network, based on
the available ionospheric model and methods.
Daily forecasting of the hourly HF set of frequencies based on the Mediterranean ionospheric measurements.
Ground wave propagation analysis when required.
Frequency management system for HF communication link optimization.
Identification of the professional profile able to maintain and operate network.
Dissemination of deliverables within communities informing about initiatives organised in the context of the
project.
Professional training activities trough courses, workshops and conferences.
Assessment of the potential impact and feasibility of the project for ECIs and CGAs and final
recommendations for the EC.
Realization of a demonstrator constituted by 4- terminals HF network.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
8
SWING System’s generalities and structure of the final
report: Cesidio Bianchi.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
9
Design and realization of HF station prototype:
James Baskaradas and Anna Lisa Saverino.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
10
HF management communication system and link
optimization: Bruno Zolesi
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
11
High Survival HF radio Network: Michele Morelli.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
12
• Internet Criticalities:
Fabrizio Cuccoli.
• Determination of the
topology of high survival HF
radio communication network:
Andrea Abrardo.
• Identification of Critical
Infrastructures in the
Mediterranean Sea context
and communications’
criticalities:
Irene Fiorucci.
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
13
Final recommendations and closure of the financial
budget: Antonio Meloni
INGV
PART B - PROJECT BUDGET ESTIMATE FORM - CIPS 2010 Action Grants
SWING
Applicant
organisation
EXPENDITURE (€)
REF
Headings
IN EURO
Verification of
division of
costs between
partnersbeneficiary
INGV
1. Partner
2. Partner
CNIT
3. Partner
NOA
4. Partner
5. Partner
Fill in the
name of the
Partner in
worksheet K
Partn in cell A
12
EBRE
6. Partner
Fill in the
name of the
Partner in
worksheet K
Partn in cell A
13
7. Partner
Fill in the
name of the
Partner in
worksheet K
Partn in cell A
14
8. Partner
Fill in the
name of the
Partner in
worksheet K
Partn in cell A
15
9. Partner
10. Partner
11. Partner
12.Partner
13. Partner
14. Partner
Fill in the
Fill in the
Fill in the
Fill in the
Fill in the
Fill in the name
name of the
name of the name of the
name of the
name of the
of the Partner in
Partner in
Partner in
Partner in
Partner in
Partner in
worksheet K
worksheet K
worksheet K worksheet K worksheet K
worksheet K
Partn in cell A
Partn in cell A
Partn in cell A Partn in cell Partn in cell A Partn in cell A
17
16
18
A 19
20
21
Fill in the
name of the
Partner in
worksheet K
Partn in cell
A 22
1. Eligible direct costs
Division among
A Staff Costs
496.730,82 partners OK
Travel and subsistence
B
allowances for project staff
C Equipment and Consumables
D Conferences and seminars
E
Publications and
dissemination
F
Other possible direct costs
(subcontracting up to max 30%
of I - Total eligible costs)
G
Total eligible direct costs
(A+B+C+D+E+F)
2. Eligible indirect costs
Overheads (max 7% of G H Total eligible direct costs and
max 50.000 €)
I
Total eligible costs for the
action (G+H)
Division among
19.250,67 partners OK
237.421,72
227.309,10
16.000,00
16.000,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
9.192,82
1.457,85
4.300,00
4.300,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
55.039,46
42.772,04
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
10.000,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
20.000,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
Division among
97.811,50 partners OK
Division among
10.000,00 partners OK
Division among
20.000,00 partners OK
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
643.792,99
331.654,00
271.538,99
20.300,00
20.300,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
Division among
27.352,83 partners OK
671.145,82
10.000,00
10.000,00
3.678,02
3.674,81
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
341.654,00
281.538,99
23.978,02
23.974,81
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
106.339,38
96.500,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,2487%
OK: overheads below 50.000€
REVENUE (€)
REF
Headings
J
Project-related income
K
Financial contribution from
Applicant organisation
/coordinator and project
partners
L
Financial contribution from
other organisations
M Grant requested from the EU €
N
Total expected income
(J+K+L+M)
IN EURO
0,00
Division among
202.839,38 partners OK
0,00
Division among
468.306,44 partners OK
671.145,82
238.387,04
196.457,91
16.731,86
16.729,62
0,0000
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
344.726,42
292.957,91
16.731,86
16.729,62
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
50,90%
41,95%
3,57%
3,57%
0,00%
0,00%
0,00%
0,00%
0,00%
0,00%
0,00%
0,00%
0,00%
0,00%
0,00%
OK: the Budget is in balance
% Share of grant
→
SUMMARY OF THE BUDGET
Total budget estimate (eligible
costs) €
671.145,82
Grant requested from the EU €
468.306,44
Grant requested from the EU / Total
eligible costs %
13/12/2013
69,78%
The information in this Budget Estimate Form and in the Timetable is complete, true and verifiable.
OK: the % of the requested amount of grant is
within the eligible limit
NOTE: Before the award decision, the Commission reserves the right to reduce and/or
remove any costs if deemed unreasonable, unjustified and contrary to sound financial
management
SWING Final Meeting | CNIT - Pisa, Italy
Name of
Authorised
signatory:
Prof domenico Giardini
Position:
President
Signature:
Date :
14
Partner members
Consiglio Nazionale universitario
per le Telecomunicazioni
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
Enzo Dalle Mese
Fabrizio Berizzi
Alessandro Andreadis
Andrea Abrardo
Annalisa Saverino
Davide Adami
Fabrizio Cuccoli
Francesco Sermi
Giovanni Dore
Luca Sanguinetti
Marco Moretti
Michele Morelli
Amerigo Capria
Marco Martorella
Giovanna Zanello
Simeon Kamdem Kuiteing
15
Partner members
Anna Belehaki
Ioanna Tsagouri
National Observatory of Athens
David Altadill
Estefania Blanch
Observatori de l’Ebre
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
16
Partner members
Istituto Nazionale di
Geofisica e Vulcanologia
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
Cesidio Bianchi
James Arokiasamy Baskaradas
Antonio Meloni
Irene Fiorucci
Valentina Orlandi
Alessandro Settimi
Adriano Azzarone
Bruno Zolesi
17
Website
Home page screenshot of the SWING website at http://swing.rm.ingv.it
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
18
Conclusion
Thanks for your attention!
13/12/2013
SWING Final Meeting | CNIT - Pisa, Italy
19
Scarica

status and closure of the project - Short Wave critical Infrastructure