ANSALDO SEGNALAMENTO FERROVIARIO Company overview and ERTMS/ETCS references UNIVERSITY OF PARDUBICE October 25, 2004 1 Corporate Structure FINMECCANICA ANSALDO SIGNAL Ansaldo Segnalamento Ferroviario 2 Transportation Sector of Finmeccanica SIGNALLING Revenues (M€)538 Employees 3009 TURN-KEY SYSTEMS 2003 269 297 ROLLING STOCK 547 2530 3 Corporate Architecture 4 33 % Degrees Manchester ( 4 ) 56 % Graduates Torino ( 300 ) Genova ( 402 ) Engineering Installation & Commissioning Project Management 11 % Others TOTAL 1040 at Aug. ‘04 Company H. Q. R&D Marketing & Sales Engineering Project Management Napoli ( 185 ) Engineering RAMS Project Management Staff Potenza ( 149 ) Factory 5 Main Systems and Products • • • • Electronic interlockings ERTMS/ETCS Conventional ATC and ATP CTC 6 Interlockings portfolio: equipped stations ACEI ACC 153 1000 111 40 800 2 779 811 692 600 519 400 262 200 120 62 0 70 75 80 85 90 95 '00 '04 7 Orte Pisa Operator Viterbo Interface of the Supervision system H. V. Cesan Firenze o Fara Sabina Monteroton do Settebagni Cab “C” La Storta Maccares e Smistam . Bivio Nord N. Salario Cab “F” M. Mario R. Salario Aureli a Scalo S. Lorenzo Nomentan a Aeroporto L. Vinci San Pietro Roma Junction lay out B. Tuscola na B. Casilina Tuscolana Ostiense Trastevere Magliana P. Galeria B. Portonaccio Torricol a Casilin a Ciampino V. A F. Cassino P.co Prenestina Prenestin a Tor Sapienza Salone Lunghezz a Bagni Tivoli Guidonia 8 Pescara West Coast main line 9 Automatic Block systems: Lines length equipped 8500 9395 9963 6402 2768 982 218 1970 1975 1980 1985 1990 1995 2003 10 SCMT: Sistema Controllo Marcia Treno Wayside installations: 2.000 km lines length, 300 stations - Firenze junction: 120 stazioni - Napoli junction: 72 stazioni - Torino junction: 50 stazioni -Verona junction: 14 stazioni 11 Line length (km) under CTC control 8.774 5.859 3.321 1.817 90 1970 568 1975 755 1980 1985 1990 1995 2003 12 Brennero CTC Grande Rete Mi CTC Grande Rete per: Genova junction (650 trains per day) Bologn a Venezia junction (630 trains per day) Napoli junction (1150 trains per day) Tirrenica line (500 trains per day) Adriatica line (590 trains per day) Rom a Napol i Bar i Bologna - Brennero line (400 trains per day) Palermo junction (490 trains per day) Siracusa 13 Italian High Speed Network Main traffic characteristics Main train speed 300 km/h Min. headway 2.5 min Min. timetable 5 min. Electric traction 25 kV ac Long distance trains Fast freight trains 14 Italy Genova Milano linee 1, 2, 3 Napoli Roma linee A, B Perù Lima U K Birmingham Br Belo Horizonte 15 ERTMS Application STM for migration Tournan-Marles -en-Brie line strategy Lev. 1 overall network Vienna - Budapest line Vienna Budapest line Madrid-Sevilla Plovdiv junction and Stara Zagora-Burgas line Whole Italian H. S. network (first line will be RomeNaples) Madrid-BarcelonaFrench border HS line Site Tests Ongoing Projects TGV East Arezzo-Rigutino H. S. line 16 Goals Achieved ASNV involvement in the ERTMS Specs Development as Eurosig/Unisig Member Selection of ASNV technology for Eurobalise ASNV participation in the French and Italian Pilot Projects ASNV leading role in the Vienna-Budapest ERTMS Implementation Project ASNV Extremely successful in EMSET Tests (Madrid-Sevilla) 17 Goals Achieved ETCS Lev. 1 in Bulgaria (as supplier of components) ETCS Lev. 1 in Hungary (as supplier of components) ETCS Lev. 1, 2 in Madrid-Barcelona (Spanish HSL) ETCS Lev. 2 for all Italian HSL ETCS Lev. 1,2 for the TGV Est Européenne 18 THE HIGH SPEED PROJECT IN ITALY 19 Italian Project: Sections North Europe East Europe France and West Europe MI TS VR VE TO GE Mestre BO Roma - Napoli line FI Km PPF RBC 211 20 3 Existing HS line Links with PCS conv. Lines Contracted HS line ROMA Roma-Napoli 1 4 NA 20 Italian Project: Sections North Europe East Europe France and West Europe MI TS VR VE TO GE Mestre BO Bologna - Firenze line FI Bologna-Firenze Km PPF RBC PCS Links with conv. Lines 81 8 1 MI-BO 1 Existing HS line Contracted HS line ROMA NA 21 Italian Project: Sections North Europe East Europe France and West Europe MI TS VR VE TO GE Mestre BO Milano - Bologna line FI Km PPF RBC PCS Existing HS line Contracted HS line Links with conv. Lines ROMA Milano-Bologna 180 20 3 1 7 NA 22 Italian Project: Sections North Europe East Europe France and West Europe MI TS VR VE TO GE Mestre BO Torino - Milano line FI Km PPF RBC PCS Existing HS line Contracted HS line Links with conv. Lines ROMA Torino-Novara 10 123 Novara-Torino 2 4 1 3 NA 23 H. S. line Roma-Napoli: system architecture SCC RBC ANSALDO ALSTOM NSS Centro GSM-R SIRTI BSC Posto Centrale Rete TLC-LD SIRTI Posto Periferico Periferia GSM-R BTS NVP - GAT ANSALDO Cabina SIRTI Interfaccia CdB audiofr. Boe ANSALDO Dev. Oleodinamici CdB audiofrequenza Dev. Elettromecc. ALSTOM Piazzale Altri dispositivi (RTB,…) ALSTOM ALTRI 24 Milano - Bologna Italian Project: ERTMS overall architecture SCC (Centralized Control System) RBC ANSALDO NSS GSM- R Center NMS Center SIRTI ANSALDO BSC Fiber Optic Long- Distance Communication Network SIRTI ANSALDO SCC Periph. Unit Hot box Detection BOMBARDIER IXL Oleodinamic and Electromechanical switching- machines A.F. Track Circuits GSM- R w ay- side BTS SIRTI ALSTOM A.F. Track Circuits ALSTOM Eurobalise ANSALDO Cabine Field 25 Torino - Milano Italian Project: ERTMS overall architecture SCC(Centralized Control System) ANSALDO RBC ANSALDO NSS NMS GSM-R Center SIRTI Center BSC Fiber Optic Long-Distance Communication Network SIRTI ANSALDO SCC Periph. Unit Hot box Detection BOMBARDIER A.F. Track Circuits IXL GSM-R way-side BTS SIRTI ANSALDO Oleodinamic and Electromechanical switching-machines A.F.Track Circuits ANSALDO Eurobalise ALSTOM Cabine Field ALSTOM 26 Bologna - Firenze Italian Project: ERTMS overall architecture SCC (Centralized Control System) ANSALDO RBC ALSTOM NSS GSM-R Center NMS SIRTI Center BSC Fiber Optic Long-Distance Communication Network SIRTI ALSTOM SCC Periph. Unit Hot box Detection BOMBARDIER IXL Oleodinamic and Electromechanical switching-machines A.F. Track Circuits GSM-R way-side BTS SIRTI ALSTOM A.F. Track Circuits ALSTOM Eurobalise ALSTOM Cabine Field 27 TGV Est Européenne • ERTMS/ETCS lev. 1 and lev. 2 (plus TVM and electronic IXL’s ) • 300 km from Vaires (Paris) to Baudrecourt (Metz) due to open in 2007 • Operating speed 320 km/h 28 ETCS Level 1 – PROJECT Spanish High Speed Lines • ASNV is providing for this line both Level 1 and Level 2, with ASFA as a fall back system • Project Name Madrid – Lerida • • • • • • Location Spain Name of the Customer GIF Date to be in Commercial Service N/A Date Trials due to/have finished Sept 2004 Conformant with Specification UNISIG 2.0.0 Line Performance – Capacity 11 trains per hour per direction • Line Performance – Speed 300 km/h • Mixed Traffic Line • Number of Complex junctions Yes 13 29 MADRID - LERIDA line equipped with ERTMS project description and development 440 Km, 13 stations, 1100 track circuits Soria - Calatayud: 90 Km 30 ETCS – Lev.1 References BDŽ (Bulgaria) Sofia – Burgas Supplier of Alcatel Austria for : • BTM and Antennas (184) • Eurobalises (1.078) 31 ETCS – Lev.1 References MÁV (Hungary) Budapest-Kelenföld-Kimle Supplier of Alcatel Austria for: • BTM and Antennas (20) • Eurobalises (1.800) 32 ETCS – Lev.1 References GIF (Spain) Madrid – Puigvert de Lleida (Lev.1&2) Supplier (for the Lev.1 system) of: • BTM and Antennas (32) • LEU (347) • Eurobalises (3.500) 33 ETCS – Lev.1 References SNCB (Belgium) • Design and development of specific LEU for the national application. 34 ETCS – Lev.1 References RFI (Italy) SCMT • Design, configuration, supply and installation of the complete wayside and on-board system • • • • EVC (> 1.100) BTM and Antennas (> 2.200) LEU Cabinets (700) and LEU modules Eurobalises (> 23.000) 35 ETCS – Lev.1 References RFI (Italy) High Speed Lines • Design, configuration, supply and installation of the complete signalling system based on ERTMS/ETCS – Lev.2. • RBC (5) • LEU (for interconnections) (320) • Eurobalises (2.500) 36 Encotrak-LEU Balise Transmission Module Equipment for ERTMS Unicab –On board Equip.37 RBC RBC Platform ISDN-GSMR CC Interface Vital section: TMR Non vital section: ART1 ed ART2 Operator Interface Diagnostic & Maintenance Interface with others RBC & NVP Non vital Functional Keyboard Vital Functional Keyboard 38 RBC Architecture Fast LAN (TCP/IP) Interface to other RBC, NVP G703/G704 CC1 and CC2 (ISDN-GSMR) Interface to trains 39 ETCS On-Board EUROCAB Cab Display On-board Computer 3 40 09/01 CSEE Transport 40 LEU cabinets 41 LEU module 42 Eurobalise 43 Eurobalise installation 44 Eurobalise programmer and tester 45 Thank for your attention 46