Conference Committee Editorial board chairman chairman Istitution Board chairman Resource manager Project Manager P. Paolucci P. Paolucci Steering committee M. Tytgat & G. Pugliese DPG Run Coordinator Tech. Coordination Upgrade D. Piccolo K. Bunkowski C. Carillo L. Benussi deputy S. Buontempo A. Dimitrov Resp. deputy 7/12/10 RPC IB - Pigi Paolucci 1 Resource manager Project Manager P. Paolucci P. Paolucci Steering committee M. Tytgat & G. Pugliese DPG Run Coordinator Tech. Coordinator Upgrade D. Piccolo L. Benussi deputy S. Buontempo A. Dimitrov Resp. deputy K. Bunkowski C. Carillo new Physic Valid Tool Online S. Costantini K. Bunkowski Maint & repar A. Dimitrov new CAF new A. Cimmino Offline D. Piccolo P5 new L. Benussi Detector & trigger analysis new C. Carillo 7/12/10 RPC IB - Pigi Paolucci 2 Online K. Bunkowski Configuration K. Bunkowski DPG Run Coordinator D. Piccolo K. Bunkowski L. Benussi deputy Offline D. Piccolo Local Reco C. Carrillo Detector & trigger analysis C. Carillo Detector perfomance Phys Valid Tool S. Costantini DQM Cimmino Calabria Detector DB SoftwareValidation/ Data Certification J. Gho Trigger perfomance Resp. Run Quality Korea Simulation Pavlov Trigger DB Calibration Streams M Szlepper Maggi Noise tools Costantini DataBase DCS WBM Berzano Upgrade Simulation 7/12/10 Skims Tupputi Covered RPC IB - Pigi Paolucci Manpower 3 needed Not covered Preliminar version Technical Coordination Upgrade S. Buontempo A. Dimitrov responsable deputy Test beam Nicolas Documentation Dimitrov Equipment DB Bakelite CERN test site Gap production Chamber test Electronics Mainten. & repair. (RE,RE) Anton & Hassan DCS Trigger Warsaw mechanics Front-end electronic cooling cooling Link board electronic Gas Benussi Ghent site Equipment DB India site CERN site 7/12/10 installation commissio ning 4 DPG Not covered tasks DPG 2011 (FTE) 2012 (FTE) WBM 0.7 0.3 Berzano* Offline DB 1.0 0.5 ? DCS 0.7 0.3 ? Upgrade Sim 0.5 0.5 ? Run quality 0.5 0.3 Korea Detector perf. 2 2 Calabria Trigger perf. 2 2 Warsaw DQM 1 1 A. Cimmino Noise 0.3 + 0.5 0.3 + 0.5 S. Costantini 7/12/10 RPC IB - Pigi Paolucci 5 TC covered tasks DPG 2011 (FTE) 2012 (FTE) TC Buontempo RB 1.0 1.0 Anton RE 1.0 1.0 Hassan Gas 0.5 0.5 Luigi Cooling 0.3 0.3 Ian Trigger 2 2 Karol + ? Electronic 0.4 0.4 Pigi + ? DB 0.7 0.3 ? Test Beam 0.3 + 0.5 0.3 + 0.5 ? 7/12/10 RPC IB - Pigi Paolucci 6 2011 Manpower/Expert Resident at CERN (>40%) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 7/12/10 Korea Univ: Taejong (70%), Mee Hee Cho (50%), Hyung Chul Kim (30%) SKK Univ: Hyunkwan Seo (50%), Min Suk Kim (70%), Junghwan Goh (30%) Chandigar: Mumbai BARC: Pavia: China: Sofia Univ: Dimitrov INRNE: Stoianov Egypt: Ghent: Costantini, Cimmino, Zaganidis, Phd ? Napoli: Buontempo, Carrillo, Paolucci LNF: Benussi, Piccolo Uniandes: Ocampo, Gomez, Phd ? Pakistan: Shahzad Brussels: Van Doninck, Luc Van Lancker Bari: Pugliese, Maggi, Colaleo, Calabria, Lusito, Tupputi RPC IB - Pigi Paolucci 7 2011 Manpower/Expert (not resident) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 7/12/10 Korea Univ: SKK Univ: Chandigar: Mumbai BARC: Pavia: Vitulo, Belli China: Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk INRNE: Stoianov, Genchev, Sultanov Egypt: Ghent: Tytgat Napoli: Fabozzi LNF: Bianco Uniandes: Pakistan: Horani, Saleh Brussels: Bari: Abbrescia, Iaselli RPC IB - Pigi Paolucci 8