Conference
Committee
Editorial
board
chairman
chairman
Istitution Board
chairman
Resource manager
Project Manager
P. Paolucci
P. Paolucci
Steering committee
M. Tytgat & G. Pugliese
DPG
Run Coordinator
Tech. Coordination
Upgrade
D. Piccolo
K. Bunkowski
C. Carillo
L. Benussi
deputy
S. Buontempo
A. Dimitrov
Resp.
deputy
7/12/10
RPC IB - Pigi Paolucci
1
Resource manager
Project Manager
P. Paolucci
P. Paolucci
Steering committee
M. Tytgat & G. Pugliese
DPG
Run Coordinator
Tech. Coordinator
Upgrade
D. Piccolo
L. Benussi
deputy
S. Buontempo
A. Dimitrov
Resp.
deputy
K. Bunkowski
C. Carillo
new
Physic Valid Tool
Online
S. Costantini
K. Bunkowski
Maint & repar
A. Dimitrov
new
CAF
new
A. Cimmino
Offline
D. Piccolo
P5
new
L. Benussi
Detector &
trigger analysis
new
C. Carillo
7/12/10
RPC IB - Pigi Paolucci
2
Online
K. Bunkowski
Configuration
K. Bunkowski
DPG
Run Coordinator
D. Piccolo
K. Bunkowski
L. Benussi
deputy
Offline
D. Piccolo
Local Reco
C. Carrillo
Detector & trigger
analysis
C. Carillo
Detector
perfomance
Phys Valid
Tool
S. Costantini
DQM
Cimmino
Calabria
Detector DB
SoftwareValidation/
Data Certification
J. Gho
Trigger
perfomance
Resp.
Run Quality
Korea
Simulation
Pavlov
Trigger DB
Calibration
Streams
M Szlepper
Maggi
Noise tools
Costantini
DataBase
DCS
WBM
Berzano
Upgrade
Simulation
7/12/10
Skims
Tupputi
Covered
RPC IB - Pigi Paolucci
Manpower
3 needed
Not covered
Preliminar version
Technical Coordination
Upgrade
S. Buontempo
A. Dimitrov
responsable
deputy
Test beam
Nicolas
Documentation
Dimitrov
Equipment
DB
Bakelite
CERN test
site
Gap
production
Chamber
test
Electronics
Mainten. &
repair. (RE,RE)
Anton &
Hassan
DCS
Trigger
Warsaw
mechanics
Front-end
electronic
cooling
cooling
Link board
electronic
Gas
Benussi
Ghent site
Equipment
DB
India site
CERN site
7/12/10
installation
commissio
ning
4
DPG Not covered tasks
DPG
2011 (FTE)
2012 (FTE)
WBM
0.7
0.3
Berzano*
Offline DB
1.0
0.5
?
DCS
0.7
0.3
?
Upgrade Sim
0.5
0.5
?
Run quality
0.5
0.3
Korea
Detector perf.
2
2
Calabria
Trigger perf.
2
2
Warsaw
DQM
1
1
A. Cimmino
Noise
0.3 + 0.5
0.3 + 0.5
S. Costantini
7/12/10
RPC IB - Pigi Paolucci
5
TC covered tasks
DPG
2011 (FTE)
2012 (FTE)
TC
Buontempo
RB
1.0
1.0
Anton
RE
1.0
1.0
Hassan
Gas
0.5
0.5
Luigi
Cooling
0.3
0.3
Ian
Trigger
2
2
Karol + ?
Electronic
0.4
0.4
Pigi + ?
DB
0.7
0.3
?
Test Beam
0.3 + 0.5
0.3 + 0.5
?
7/12/10
RPC IB - Pigi Paolucci
6
2011 Manpower/Expert
Resident at CERN (>40%)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
7/12/10
Korea Univ: Taejong (70%), Mee Hee Cho (50%), Hyung Chul Kim (30%)
SKK Univ: Hyunkwan Seo (50%), Min Suk Kim (70%), Junghwan Goh (30%)
Chandigar:
Mumbai BARC:
Pavia:
China:
Sofia Univ: Dimitrov
INRNE: Stoianov
Egypt:
Ghent: Costantini, Cimmino, Zaganidis, Phd ?
Napoli: Buontempo, Carrillo, Paolucci
LNF: Benussi, Piccolo
Uniandes: Ocampo, Gomez, Phd ?
Pakistan: Shahzad
Brussels: Van Doninck, Luc Van Lancker
Bari: Pugliese, Maggi, Colaleo, Calabria, Lusito, Tupputi
RPC IB - Pigi Paolucci
7
2011 Manpower/Expert
(not resident)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
7/12/10
Korea Univ:
SKK Univ:
Chandigar:
Mumbai BARC:
Pavia: Vitulo, Belli
China:
Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk
INRNE: Stoianov, Genchev, Sultanov
Egypt:
Ghent: Tytgat
Napoli: Fabozzi
LNF: Bianco
Uniandes:
Pakistan: Horani, Saleh
Brussels:
Bari: Abbrescia, Iaselli
RPC IB - Pigi Paolucci
8
Scarica

RPCOrganizationChart_Jan2011