Introduction
• Overview of the baseline layout with long profile
drawing to scale with actual landscape and birdview
• What is needed for the next steps ?
05.12.2012
EDMS: 1256336
2
Layout 2
• Main caracteristics of the Layout 2
– Near detectors all in the extension of the EHN1
– Target-decay-dump position close to the EHN1
• Issues reported on the 12/11:
– Radiation in EHN1
– Depth of the installations
05.12.2012
EDMS: 1256336
3
Layout 2
05.12.2012
EDMS: 1256336
4
Layout 2 – Long profile
05.12.2012
EDMS: 1256336
5
Layout 2 – Long profile
05.12.2012
EDMS: 1256336
6
Layout 2
• Radiation issues:
– The new version of the layout 2 has been
repositioned to a depth that will allow to comply to
the acceptable level of radiations in EHN1.
05.12.2012
EDMS: 1256336
7
Layout 2
• Using deeper location for the extraction line:
– A good position for the extraction ends up being
close to the “decheterie”.
05.12.2012
EDMS: 1256336
8
Layout 2 – EHN1 ext.
Two Surfaces:
- Top
- Bottom
Total
Two volumes:
- Top
- Bottom
Total
05.12.2012
3000 m2
1500 m2
4500 m2
54000 m3
24000 m3
78000 m3
EDMS: 1256336
9
Conclusions
• Feasible?
– What should be considered to be feasible?
• Technically, Ok.
• Cost? Planning?
• What is needed next -> DESIGN INTEGRATION!!!!!