Short Base Line Neutrino Facility ICARUS – NESSIE – CERN Civil Engineering: Baseline Layout Presenting L. Scibile Contributions by: CERN: M. Calviani, J. Devine, I. Efthymiopoulos, A. Ferrara, B. Goddard, K. Kershaw, A. Kosmiki, J. Osborne, P. Pepinster, R. Steerenberg, ICARUS: A. Guglielmi, C. Montanari, F. Pietropaolo, P. Sala, A. Scaramelli NESSIE: M. Benettoni, A. Bertolin, G. Laurenti, L. Patrizii, L. Stanco 05.12.2012 EDMS: 1256336 1 Introduction • Overview of the baseline layout with long profile drawing to scale with actual landscape and birdview • What is needed for the next steps ? 05.12.2012 EDMS: 1256336 2 Layout 2 • Main caracteristics of the Layout 2 – Near detectors all in the extension of the EHN1 – Target-decay-dump position close to the EHN1 • Issues reported on the 12/11: – Radiation in EHN1 – Depth of the installations 05.12.2012 EDMS: 1256336 3 Layout 2 05.12.2012 EDMS: 1256336 4 Layout 2 – Long profile 05.12.2012 EDMS: 1256336 5 Layout 2 – Long profile 05.12.2012 EDMS: 1256336 6 Layout 2 • Radiation issues: – The new version of the layout 2 has been repositioned to a depth that will allow to comply to the acceptable level of radiations in EHN1. 05.12.2012 EDMS: 1256336 7 Layout 2 • Using deeper location for the extraction line: – A good position for the extraction ends up being close to the “decheterie”. 05.12.2012 EDMS: 1256336 8 Layout 2 – EHN1 ext. Two Surfaces: - Top - Bottom Total Two volumes: - Top - Bottom Total 05.12.2012 3000 m2 1500 m2 4500 m2 54000 m3 24000 m3 78000 m3 EDMS: 1256336 9 Conclusions • Feasible? – What should be considered to be feasible? • Technically, Ok. • Cost? Planning? • What is needed next -> DESIGN INTEGRATION!!!!! 05.12.2012 EDMS: 1256336 10