Turn-key project Key-Personnel Organisation chart
Director, Projects
Client Project Manager &
Project Management Staff
Danieli Engineering (DE)
Project Manager
Sales Manager
Project Planning &
Control
Export Finance &
L/C Manager
Contract Administr.
Legal Dept.
Manager
Procurement
Manager
P.M. DE
P.M. DA
P.M. DCM
Quality Manager
P.C. WTP process
Process Coordinator
P.E. Meltshop
process
P.E. Civil &
structural des.
P.E. Substation, HV
- LV power distrib.
P.E. Interconnecting
piping
P.E. Interconnecting
cabling
P.E. Instrumentation
P.C. Automation
system level 1
P.M. DMH
P.M. DCC
P.E. Rolling
process
P.E. Combustion
process
P.E. Mech.
Equipment eng.
P.E. L.V.
Distribution
P.E. Hydraulics
Lubrication
P.E. Automation
P.C. Automation
system level 2
P.E. Firefighting
system
Safety Officier
P.E. Hydraulics
lubrication
P.E. Piping utilities
Site Manager
Planning & quantity Survey
Deputy Site Manager
Material Man
Accounting & Cost control
Civil and
infrastructure
construction
Supervisor
P.C. Cranes
P.C. Procurement
cc
P.C. Packing &
Shipping
P.C. Spare parts
P.C. Manufacturing
& expediting
P.C. Training
P.C. Operation, maintenance
& safety manuals
Quality Assurance Eng.
P.E. Instrumentation
Site Technical
Office Field
Engineers
P.C. Workshop
laboratory eq.
P.E.
Instrumentation
Client Site manager & Staff
P.M. Construct
Erection & Commiss.
P.E. Mech.
Equipment engin.
P.E. HVAC
P.E. Compressed air
system
P.E. Piping
Utilities
Danieli Construction
& Commissioning
(UMAC)
P.C. Expediting / testing (E LE)
P.C. Quality Control
Erection Supervisors
Building erection
Startup and
commissioning
Team
Mechanical
Mechanical
equipment
Electrical
Reheating furnace
Piping
Piping and aux.
Systems
Aux. Systems
HV / LV power
distribution &
Automation system
Automation
General Management Flow Chart (part 1)
CONTRACT & FINANCING TOOLS REQUIREMENTS
CONTRACT SCHEDULE
TECHNICAL SPECIFICATION
PAYMENT METHOD/FORMALITIES
PICS (PROJECT INTEGRATED CONTROL SYSTEM)
MASTER PLANT LIST
WORK BREAKDOWN
RESPONSIBILITY
PRICE BREAKDOWN
SCHEDULE (LEV. III)
CASH FLOW
JOB POSITION (TPC/JET)
INSPECTION TEST SCHEDULE (ITS)
(PART 2)
(PART 3)
General management Flow Chart (part 2)
JOB POSITION (TPC / JET) from part 1
ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS)
MATERIAL REQUIR.
TECHN. DOCUMENTS
PROCUREMENT
PURCHASE & ORDERS
MANUFACTURING
OUTSIDE (E/LE)
INSIDE (I)
(PART 3)
General management Flow Chart (part 3)
MANUFACTURING (FROM PART 2)
INSPECTION TEST SCHEDULE (ITS)
(FROM PART 1)
OUTSIDE (E)
INSIDE (I/LE)
INSPECTION & TESTING (NOI/IRE/LOC/QCTM)
INSPECTION PLANNING
NOTICE OF INSPECTION (NOI)
CERTIFICATIONS (IRE)
RELEASE CERTIFICATE (RC)
PACKING
INSPECTION PLANNING
CERTIFICATION (IRP)
NOTICE OF SURVEILLANCE (NOS)
PACKING LIST
JOB POSITION (TPC/JET) (FROM PART 1)
PRICE BREAKDOWN (FROM PART 1)
SHIPPING & INVOICING
CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM)
COMMISSIONING
Master Plant List (esempio)
Estratto Livello 3: Plant Unit 31 (Typical)
Programmazione di Livello 3 (Typical)
Programmazione di Livello 4 (Typical)
Cut-off date: Progress (Typical)
Curve pianificate di avanzamento (typical)
%
100
90
80
70
60
50
40
30
20
10
0
N D J F M A M J
2001
planned
J A S O N D J
2002
progress
F M A M J
J
2003
A S O N D J
F M A
2004
Valide per tutte le discipline e attività
Scarica

Turn-key Plants