o IBL per Marzio G. Darbo - INFN / Genova Agenda page: G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 IBL Organization The IBL (Insertable B-Layer) is an ATLAS Upgrade project: • It will deliver a fourth pixel layer, including a new beam-pipe, to the Inner Detector • When delivered, it will become a part of the Pixel Detector and of the Inner Detector and the organization will be “absorbed” into the Pixel & ID Pixel Institutes in IBL ATLAS UPGRADE IBL MB (Management Board) Module WG G. Darbo – INFN / Genova Stave WG I&I WG IBL PL IBL TC New Institutes in IBL ATLAS UPO IBL IB (Institute Board) Off-det WG 3D Sensor Processing - IBL IBL Venezia, 4 June 2009 2 Management Board (MB) Ad-interim membership IBL Project Leader: G. Darbo IBL Technical Coordinator: H. Pernegger “Module” WG (2 Physicists): F. Hügging & M. GarciaSciveres “Stave” WG (1 Phy. + 1 M.E.): O. Rohne + D. Giugni “IBL Assembly & Installation” WG (2 M.E. initially, a Phy. Later): N. Hartman + R. Vuillermet “Off-detector” WG (1 Phy. + 1 E.E.): T. Flick + S. Débieux IBL Management Board Membership: •IBL PL + IBL TC •2 coordinators from each WG •Plus “extra” members Module WG (2 coordinators) •FE-I4 •Sensors •Bump-Bonding •Modules •Test & QC •Irradiation G. Darbo – INFN / Genova “Extra” members: Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), Pixel Chair (C. Gößling) Offline “liaison” Pixel Off-line coordinator: A. Andreazza TDR editor (temporary): K. Einsweiler Stave WG (1 Phys + 1 Eng.) •Staves •Cooling Design & Stave Thermal Management •HDI •Internal Services •Loaded Stave •Test & QC IBL Integr.-Install. (2 Eng.) •Stave Integration •Global Sup. •Beam Pipe (BP) •Ext.services inst. •IBL+BP Installation •Cooling Plant •Test & QC 3D Sensor Processing - IBL Off-detector (1 Phys + 1 E.Eng.) •Power •DCS •ROD •Opto-link •Ext.serv.design/proc. •Test Beam •System Test Venezia, 4 June 2009 3 Single Stave Layouts Several layouts under study: 14 staves at Rmin=~3.2 cm Turbine Sensor Inverted Rail Space Ref: N. Hartman: •http://indico.cern.ch/conferenceDisplay.py?confId=43496 G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 4 BiStave Layouts Sensor Biturbine Castellated Ref: N. Hartman: •http://indico.cern.ch/conferenceDisplay.py?confId=43496 G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 5 Frontend Chip - FE-I4 FE-I4 Status • Prototype blocks in MPW (MOSIS) submitted 3/2008, measurements, irradiation • Design review (3/2009): “Design Technical Issues” on full scale design • FE-I4 Collaboration meeting 1/7/2009 • Foreseen complete design review after Summer and submission later this year. New FE-I4 FE-I3 8mm active 2.8mm FE-I3 74% G. Darbo – INFN / Genova IBM reticule Pixel size = 250 x 50 µm2 Pixels = 80 x 336 Technology = 0.13µm Power = 0.5 W/cm2 Chartered reticule (24 x 32) 7.6mm 20.2mm 3D Sensor Processing - IBL active ~200μm 16.8mm ~19 mm ~2mm FE-I4 ~89% Venezia, 4 June 2009 6 FE-I4 Review & Collaboration FE-I4 – “Design Technical Issue” Review March 2nd , 2009 - Review agenda page: http://indico.cern.ch/conferenceDisplay.py?confId=52403 G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 7 Modules & Stave Arrangement Two module options: • Single chip modules abut one against the next • Small sensor type: like 3D, active edge W-bond pads • Multi chip modules: chip look the same if using multi-chip modules • As present sensor size (~2xFE-I4) : like planar n-on-n • assuming no Z-shingling, no space. G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 8 Requirements - Fluence Requirements discussed in previous meetings • New simulation of n fluences as input for the IBL design (see box) • Other requirements are: • IBL design Peak Luminosity = 3x1034, • Integrated Luminosity seen by IBL = 550 fb-1 • Fit made for 2 < r < 20 cm for L=1000fb-1 493 25 14 (r) 2 10 r r • Gives for IBL @ 3.7 cm (550 fb-1): 1MeV=2.4x1015 (1.2 MGy) • Safety factors not included in the computation (pp event generator: 30%, damage factor for 1 MeV fluences: 50%) Ref. Ian Dawson - AUW G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 9 Sensors - Time line IBL project started now: • TDR March 2010 – sensor option not decided before FE-I4.v1 prototyping • FE-I4.v1 submitted (earliest) 15/10/2009 – Wafer back 31/4/2010 • FE-I4.v1 prototype modules and testing – second half 2010 Sensor decision on FE-I3 and FE-I4.v1 prototypes • End of 2010 Sensor production and testing • 8 months production assumed. Testing could last 4 months after end production. • Production starts beginning 2011. G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 10 How Many 3D Sensor Wafers For IBL we need: • 14 staves (+6 spares) • 32 FE-I4 (3D sensors) • Total need = 640 single FE-I4 tiles = 54 Wafer • If we consider yields: • Sensor (0.5) • Bump Bonding • Module 4” Wafer – Fits 12 FE-I4 • ~ 150÷200 wafer for whole IBL G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 11 Beam-pipe - Layout Beam-pipe radius can be reduced by at least 4mm • On-site survey has shown that cavern floor is stable (~1mm respect 9.8mm foreseen) • See LEB (LHC Experimental Beam-pipes) WG – 5/3/2009: http://indico.cern.ch/conferenceDisplay.py?confId=53606 Smaller beam-pipe Layout options • Better physics performance obtained with “reverse turbine” layout -sensor facing beam-pipe – cooling redundancy (two cooling pipes) for beam-pipe bake-out 1 mm G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 12 Material Budget Physics performance low material budget • Strategy for reducing X0: carbon foam, carbon fiber (CF) cooling pipe, CO2 cooling,… X0 - Ti cooling pipe option X0 - CF cooling pipe option Omega Carbon foam Epoxy Sensor R/O chips Flex Cooling pipe (Al) Cooling fluid (C3F8) 0.00165 0.00179 0.00030 0.00434 0.00382 0.00144 0.00266 0.00133 Omega Carbon foam Epoxy Sensor R/O chips Flex Cooling pipe (CF) Cooling fluid 0.00165 0.00179 0.00030 0.00434 0.00382 0.00144 0.00083 0.00133 General total 0.01730 General total 0.01550 Total structure Structure+cool. Fluid 0.00640 0.00773 Total structure Structure + cool. Fluid 0.00457 0.00590 G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 13 Pixel Strips Inner Detector Status – November 2008 Approved by Executive Board EoI, Proposal presented to USG Inner Tracker R&D G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 14 Calorimeter Muon Trigger, Elec, … Status – November 2008 Approved by Executive Board EoI, Proposal presented to USG Calorimeter, Muon & Other R&D G. Darbo – INFN / Genova 3D Sensor Processing - IBL Venezia, 4 June 2009 15