Associazione Euratom-ENEA sulla Fusione ----- RISERVA Verticale Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- Aims of PROTO-SPHERA The idea is to form an ULART by producing a Screw Pinch that will be destabilized by increasing the longitudinal arc current Ie: such a configuration has been obtained for the first time on the TS-3 experiment (Tokyo University) Screw Pinch with longitudinal field BZ toroidal field Bf safety factor qPinch = 2p rPinch BZ/LPinch Bf Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- ProtosPhera CATIA Drawing Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- PROTO-PINCH Experimental Set-Up Gas Feed 8 conductors for the Ie return External coils. Visible Spectroscopy Pyrex vacuum vessel MicroWave Interferometry Vacuum Pump Cathode Vacuum Pump Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- COILS Two groups of PF coils (jPF≤2 kA/cm2), each composed by coils connected in series Group 'B' - shape the pinch with constant currents Group 'A' - compress the ST with variable currents Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- Main Features ST diameter 2•Rsph=0.7m Toroidal plasma current Ip=240kA Aspect ratio A=1.2, elongation k=2.35 Similar to the START spherical torus experiment Pinch current Ie=60 kA « Itf≈200 kA (START centerpost) Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- Cost, Schedule & Size Vessel, including: tiles, supports, Baking system and base Design contract Subtotal 665,000 € 77,000 € 742,000 € Poloidal field coils, including : feedthroughs and cooling system Design contract Subtotal 826,000 € 77,000 € 903,000 € Anode and Cathode, including feedthroughs and cooling system Design contract Subtotal 297,000 € 50,000 € 347,000 € Assembly contract Pumps, gas feed & control system TOTAL Power supply: Pinch feeder ‘P’ Cathode feeder ‘K’ PF feeder ‘A’ PF feeder ‘B’ Subtotal Electrical work contract TOTAL Power Supply GRAND TOTAL 90,000 € 200,000 € 2,282,000 € 904,000 € 102,000 € 150,000 € 31,000 € 1,187,000 € 93,000 € 1,280,000 € 3,562,000 € Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- MultiPinch Costs • Capital costs of multi-pinch test Load assembly (vessel and electrodes) PF coils and sustaining columns Power supplies TOTAL 460000 € 230000 € 246000 € 936000 € : : : : • If, after the multi-pinch test, the decision to build PROTO-SPHERA was taken, between 585000 € and 770000 € of the capital expenditure of the multi-pinch test could be still put at work. Schedule of multi-pinch test • If proposal is accepted in 2003: first plasma by the end of 2005. Culham 15-17 September 2003 Associazione Euratom-ENEA sulla Fusione ----- Panel Question & Answers 1. Is the physics basis for undertaking an experiment as proposed with PROTO-SPHERA adequate? OK, BUT We recommend that a wider range of operation scenarios of m and pressure profiles be analyzed ... 2) Are the PROTO-PINCH electrode experiments a sufficient technical basis for a reliable electrode operation in PROTO-SPHERA? OK, BUT… are not yet adequate for reliable multielectrode operation... 3) 4) 5) 6) 7) … In particular, is the proposed size adequate for the purposes of a Concept Exploration Experiment? .. OK How likely is .... to advance the present state of science and technology substantially.. OK .. likely to produce new information that is adequate as basis to extrapolate to a SPHERA device that achieves fusion relevant paramenters? OK What diagnostics should be planned in order to properly measure the properties of the PROTO-SPHERA plasma? OK What are the unique contributions of the proposed experiment to the world magnetic fusion programs, and in particular to the European Magnetic Fusion Program during the VIth FP? OK Culham 15-17 September 2003