Dipartimento di Fisica
Università di Trieste
&
Istituto Nazionale di Fisica Nucleare (INFN) - Trieste
ALICE Vertex Detector
focusing on the µstrip layers
ALICE-STRIP Trieste:
Marco Bregant, A. Borysov, L. Bosisio, P. Camerini, G. Contin,
F. Faleschini, E. Fragiacomo, N. Grion, G.-V. Margagliotti,
S.
Piano, I. Rachevskaia, R. Rui
Marco Bregant
Vertex05 - Nikko, November 2005
Muon Spectrometer
L3 magnet
HMPID
TOF
TPC
TRD
PHOS
Dipole
magnet
Dipartimento di Fisica
Inner Tracking System
Requirements:
•Vertex resolution < 100 μm
(Charm, Hyperons)
•Acceptance down to 100 MeV/c
•Improvement of pT from outter
tracker
•Particle densities up to 80/cm2
•Low mass (γ conversion,
multiple scattering)
Marco Bregant
Vertex05 - Nikko, November 2005
Dipartimento di Fisica
Inner Tracking System
2 layers of Silicon Pixel Detectors
R=3.9 cm; 7.6 cm
dNch/dx2~ 80 particles/cm2
2 layers of Silicon Drift Detectors
R=14.9 cm; 23.8 cm
dNch/dx2~ 5 particles/cm2
2 layers of Silicon Strip Detectors
R=38.5 cm, 43.6 cm
dNch/dx2~ 1 particle/cm2
Marco Bregant
Vertex05 - Nikko, November 2005
Silicon Pixel Detector
Dipartimento di Fisica
• 60 staves, 240 modules
• 40960 chs. per module
• cell size (r,z):
50 x 425 µm2
• spatial resolution (r) 12 µm
• spatial resolution (z) 100 µm
Marco Bregant
Vertex05 - Nikko, November 2005
Silicon Drift Detector
Dipartimento di Fisica
• 36 ladders, 260 modules
• 2 x 256 chs. per module
• cell size (r,z):
294 x 150 µm2
• spatial resolution (r) 35 µm
• spatial resolution (z) 23 µm
Drift
Drift
sensor active area: 7.02 x 7.53 cm2
Marco Bregant
Vertex05 - Nikko, November 2005
Silicon Strip Detector
• 72 ladders, 1698 modules
• cell size (r,z):
95 x 4000 µm2
Ladder,
• spatial resolution (r) 20 µm
top
• spatial resolution (z) 830 µm
SSD module
(after folding)
Dipartimento di Fisica
Ladder,
bottom
Marco Bregant
Vertex05 - Nikko, November 2005
SSD module
Dipartimento di Fisica
40 mm
42 mm
Hybrid
Sensor
72
75 mm mm
6 µcables
6 chips
Marco Bregant
Vertex05 - Nikko, November 2005
Parts forming a module
Sensor
• n-type silicon
• 300 µm thick
• double sided
• Stereo angle: 35 mrad
 p: 7.5 mrad
 n: 27.5 mrad
• integrated AC decoupling
Dipartimento di Fisica
P
768 strips/side, 96 µm pitch
N
Marco Bregant
Vertex05 - Nikko, November 2005
Parts forming a module
HAL25 chip
Dipartimento di Fisica
CMOS .25 µm process, rad-hard
~11 mm
mixed analogue/digital chip
128 input channels
±14 MIPs dynamics
1.4  2.2 µs adjustable shaping time
JTAG programmable
powered @2.5 V
thinned down to ~150 µm
~4 mm
Marco Bregant
Vertex05 - Nikko, November 2005
Parts forming a module
µcable
to sensor
2.4 mm
11 mm
Dipartimento di Fisica
Aluminium traces (14 µm) on
polyimide (10 µm) support
TAB frames for easy handling
Developed & supplied by the
Ukrainian group
to
subhybrid
chip
Marco Bregant
Vertex05 - Nikko, November 2005
Parts forming a module
Dipartimento di Fisica
SubHybrid
Bottom view
Made in UA
aluminium/polyimide flex
cooling blocks
tail: fits in a ZIF
connector for tests
carbon-fibre stiffener
SMD resistors
SMDcapacitors
Top
view
Marco Bregant
Vertex05 - Nikko, November 2005
Module assembling scheme
Dipartimento di Fisica
Marco Bregant
Vertex05 - Nikko, November 2005
Assembling flowchart
Dipartimento di Fisica
Sensor
Chip
Tabbed
chip
µcable
Test
Hybrid
Tabbed
chip
µcable
6X
half
module
Test
Sub-hybrid
6X
Chip
Test
Test
Hybrid
Sub-hybrid
Test
module
Test
to
ladders
Marco Bregant
Vertex05 - Nikko, November 2005
How to do it? ... in Trieste
Dipartimento di Fisica
Production of 1700 modules split in three locations:
 Helsinki: entirely produces on-site
 Strasbourg: entirely produces on-site
 Trieste: produces in collaboration with an external
manufacturer (840 modules)
840 modules: 1700 hybrids, 10000 tabbed chips, ...
~30000 tests ...a tiny mass production
• process optimization (including custom jigs):
• on-line quality control:
 fast & reliable tests for immediate feedback
Marco Bregant
Vertex05 - Nikko, November 2005
Step 1: chip + µcable
Dipartimento di Fisica
bonding
mask
TAB-Frame
frame holder
bonder
chip holder
positioning
system
(4 axis)
Marco Bregant
Vertex05 - Nikko, November 2005
Step 1: chip + µcable
Dipartimento di Fisica
...aligning and
automatic TAB bonding
Marco Bregant
Vertex05 - Nikko, November 2005
Step 2: hybrid assembling
Dipartimento di Fisica
Jig for hybrid assembling
Marco Bregant
Vertex05 - Nikko, November 2005
Step 2: hybrid assembling
Dipartimento di Fisica
- 6 tabbed chips are aligned and
glued to the subhybrid
- automatic TAB bonding of the
6 tabbed chips to the subhybrid
Marco Bregant
Vertex05 - Nikko, November 2005
Dipartimento di Fisica
Marco Bregant
Vertex05 - Nikko, November 2005
Steps 3&4: module assembling
Dipartimento di Fisica
Bottom side
Top side
Marco Bregant
Vertex05 - Nikko, November 2005
Module made
Dipartimento di Fisica
Marco Bregant
Vertex05 - Nikko, November 2005
Test & validation
Dipartimento di Fisica
• a test at each step
• production in three sites (including industry)
√ same electronics
√ same automatic test
Marco Bregant
Vertex05 - Nikko, November 2005
Noise&gain tests
Dipartimento di Fisica
Depleted Module (p side)
noisy region
 noise: ~2.5 a.u.
summary
 signal ~ 900 a.u.
in response to
~10MIPS from chip
internal pulser
bad channel
Marco Bregant
Vertex05 - Nikko, November 2005
Search for short-circuited chs.
Dipartimento di Fisica
ch. n is pulsed
ch. n+1 is read
summary
Marco Bregant
Vertex05 - Nikko, November 2005
The test summary
Dipartimento di Fisica
In the right pane:
- all the useful information, i.e.
- module serial number
- chip serial numbers
- a led for each test (green: 0K; yellow: minor
problem; red: major failure
- the list of:
- open channels
- short-circuited channels
- broken AC channels
Test duration:
~ 10 minutes
- the final quality (= 100  defective channels)
green: OK!
ALL is saved in an ASCII report file
Marco Bregant
Vertex05 - Nikko, November 2005
The assembling of SSD modules
Conclusions
Dipartimento di Fisica
• an assembling system was designed to produce the
SSD module of ALICE
• production goes smoothly ahead
• typical rates (yields) are
 100 tabbed chips/day (88%)
 10 hybrids/day (97%)
 20 modules/week (92%, 85% at the first trial)
• a total amount of number of 1000 (out of 1700)
modules were so far assembled in the three
production sites
Marco Bregant
Vertex05 - Nikko, November 2005
Dipartimento di Fisica
Additional slides
Marco Bregant
Vertex05 - Nikko, November 2005
Testing on the beam
Test beam Hall
at CERN
Dipartimento di Fisica
5 modules have been
tested with a π beam
(7 GeV)
Marco Bregant
Vertex05 - Nikko, November 2005
Test beam results
N side
S/N ~ 45
Dipartimento di Fisica
P side
S/N ~ 60
Marco Bregant
Vertex05 - Nikko, November 2005
Spatial resolution
Dipartimento di Fisica
z resolution
r resolution
design:
20 µm
design:
830 µm
measured:
20 µm
measured:
975 µm
Marco Bregant
Vertex05 - Nikko, November 2005
Scarica

transparencies