RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates & Racks Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 1 FEB prototype Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 2 FEB block schematic Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 3 Front End Discriminator LVDS receiver Very cheap High density Flavio Dal Corso - INFN Padova High speed Moderate CMRR (~2 V) OPERA coll. meeting - Hamburg 3 July 2004 4 Discriminator Performances Slope Distribution Discriminator Linearity =0.003 20 400 y = 0,9658x + 11,338 15 Counts 200 100 5 0 400 -400 -0,962 -0,964 -0,966 -0,968 -300 -0,970 -200 -0,972 0 -0,974 200 -0,976 -100 0 -0,978 -200 -0,980 -400 10 -0,982 Actual Thr (mV) 300 Offset Distribution Nominal Thr (mV) =4.1 mV Counts 15 Linearity Residuals 1,00 10 5 400 -1,00 mV mV Flavio Dal Corso - INFN Padova 18,5 300 16,5 200 14,5 100 12,5 0 10,5 -0,50 8,5 -100 6,5 -200 4,5 -300 2,5 -400 0,5 0 0,00 -1,5 mV 0,50 OPERA coll. meeting - Hamburg 3 July 2004 5 RPC Strip’s Signals (First measurements done underground) strip signal 0,2 0,15 0,1 0,05 0 1 921 1841 2761 3681 4601 5521 6441 7361 8281 9201 -0,05 ground signal -0,1 0,12 0,1 0,08 0,06 0,04 0,02 0 -0,02 1 919 1837 2755 3673 4591 5509 6427 7345 8263 9181 -0,04 -0,06 -0,08 difference 0,15 0,1 Ground connection not the best possible (not yet the final layout). Ground noise well within CM range. Difference signal immune from ground noise 0,05 0 1 229 457 685 913 1141 1369 1597 1825 2053 2281 2509 2737 2965 -0,05 -0,1 Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 6 FEB status Prototype (almost) finished. 10 prototypes will be mounted in the next few weeks, to be tested at the INFN-Napoli test stand with the Controller. Tender for the mass production (~500 boards) awaiting for test results. Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 7 Controller status Prototype finished, without “Mezzanine”. Tested at INFN Napoli with a FEB emulator. Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 8 HV system 3 SYS-127 (available). 33 (4 ch.) positive modules (available). 11 (4 ch.) negative modules (available). 8 (~40 ch. each) I-meter (home made by INFN-Frascati), almost ready. Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 9 RPC & XPC cable layout 3 + 6 boards x plane Flavio Dal Corso - INFN Padova 6 + 6 boards x plane OPERA coll. meeting - Hamburg 3 July 2004 10 Racks layout 16 Racks (old MACRO crates), with modification (water cooling and power management). Works in progress. Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 11 Crates layout (for one spectrometer) RACK 1 RACK 3 RACK 2 RACK 4 Power Management Power Management Power Management Power Management TIMING RPC RADIATORE RADIATORE CONTROLLER RADIATORE RADIATORE RACK 5 RACK 7 RACK 6 RACK 8 Power Management Power Management Power Management Power Management CONTROLLER RPC RADIATORE RADIATORE RADIATORE RADIATORE SLOW CONTROL XPC RPC RPC RPC RPC RPC RPC RPC SLOW CONTROL RPC I Meter RADIATORE RADIATORE RADIATORE RADIATORE RADIATORE SYS 127 + Flavio Dal Corso - INFN Padova RADIATORE RADIATORE I Meter I Meter RPC RADIATORE XPC RPC I Meter I Meter I Meter I Meter I Meter SYS 127 - OPERA coll. meeting - Hamburg 3 July 2004 SYS 127 + 12 Custom Crates (FEBs and Controllers) Standard VME crates, with custom backplane. 4 crates for XPC 24 crates for RPC 4 crates for Controllers Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 13 Custom Crates Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 14 Custom Crates Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 15 All the crates and backplanes are already available; mounting in progress. Flavio Dal Corso - INFN Padova OPERA coll. meeting - Hamburg 3 July 2004 16