ATLAS - Stato dell’ esperimento L. Mandelli La schedula V7.0. Implicazioni e stato dei rivelatori Flash sul CTB Aggiornamento sulla Organizzazione di Atlas Mandelli L. CSN1-Aprile05 Atlas INFN Schedule 7.0 Planning in the cavern (part I) Sep '04 Oct '04 Nov '04 Dec '04 Jan '05 Feb '05 Mar '05 Apr '05 May '05 Jun '05 Jul '05 Aug '05 Sep '05 Oct '05 Nov '05 Dec '05 Jan '06 Atlas INFN Feb '06 Mar '06 A 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BT full power Side A Preparations for BT assembly Barrel Toroid JN A Endcap Calorimeter A HS arches preparati on LAr Endcap Muon Barrel A (JT) Barrel Toroid services Release of jacks Half Barrel services Barrel Calo testing and commissioning ID services along ID services through Muons Barrel Platf. Cable chains Remov Muons sector 13, BMS chambers, Muon rails, gangways & services Endcap Cal. C services Muon Barrel C Barrel Tile upper half assembly Endcap Calorimeter C JN C Side C Lar Cryostat BOF, BOG, BMF chambers Barrel Calo services Barrel Calorimeter services, 1st fix on truck LAr Big Wheels C ID B HS arches Barrel Toroid Coils 5-8 Chimney Check rails Barrel Barrel Toroid Coils 1-4 En Field mapping Endcap cryo lines. Barrel Cryo lines Preparations for Barrel Toroid assembly BT testing & commissioning Solenoid Platforms removal Big 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Sep '04 Oct '04 Nov '04 Dec '04 Jan '05 Feb '05 Mar '05 Apr '05 May '05 Jun '05 Jul '05 Aug '05 Beam Vacuum Inner Detector Solenoid Calorimeters Toroid Magnet Muon Spectrometer Support Structures Shielding Mandelli L. CSN1-Aprile05 Sep '05 Oct '05 Nov '05 Dec '05 Jan '06 Feb '06 Mar '06 A ATLAS Barrel Toroid Status: BT1 BT2 BT3 BT4 BT5 BT6 BT7 BT8 Atlas INFN Assembled in pit Assembled in pit Under test Assembled in pit. Tested. OK. In pit 10/04 Tested OK. Closing almost finished Vacuum vessel welding started, cold mass ready Installation tools and supports are ready for coils 1 to 6, top support for 7 and 8 in fabrication. End June-July all 8 coils in the pit BT test in January 06 Mandelli L. CSN1-Aprile05 3 4 1 2 Atlas INFN 30 Marzo 2005 17 Marzo 2005 Mandelli L. CSN1-Aprile05 ATLAS Barrel Calorimeter (LAr and Tiles) Installation of the LAr and Tile Barrel Calorimeters completed on the C-side The installation of services electronics and services has started Atlas INFN Critical points: Em: FEB: 6m delay partly recoverable Present plan : Barrel FEBs by August, EC FEBs by November LV PS (MDI) Critical. Two proto in hands at BNL. Under test HV Hw Instable.Start being worrying. Task force in action Tile: Super drawers completed and assembled by April. ok Mandelli L. CSN1-Aprile05 LV PS critical but two production lines (Cern and Prague) now End-Cap C (EM ;HEC;FC ) EC cryostat covers welded. Atlas INFN Cool-down started end November.Filling and subcooling finished end January. The limits on temperature differences in the detectors were respected. Presently after 8 week cold testing period it is worming up. In pit in September Tile Extended Barrel C assembly in pit starting in September. End-Cap C cool-down Last updated 07-02-2005 300.00 Maximum detector temperature 290.00 280.00 270.00 260.00 Dead Channels: 250.00 240.00 220.00 210.00 200.00 190.00 Cryostat filling Minimum detector temperature Em 6/31872 =0.19‰ Hec 2/3072 =0.65 ‰ FC 0.2 ‰ !!!! 180.00 170.00 160.00 150.00 Average values: - Speed: 0.2 K/h - Heat transferred: 5.4 kW 140.00 130.00 120.00 110.00 100.00 90.00 eb -0 5 02 -F 25 -J an -0 5 09 -J an -0 5 01 -J an -0 5 ec -0 4 24 -D 17 -J an -0 5 Time (days) Mandelli L. CSN1-Aprile05 ec -0 4 16 -D ec -0 4 08 -D ov -0 4 30 -N ov -0 4 80.00 22 -N Temperature (K) 230.00 End-Cap A (EM,HEC,FC) End-Cap cryostat A before closure Integration status: -All calo’s inserted and cabled -Welding of closed vessel almost finished (now) -Closure of warm vessel in April -Start cryo operations in June -In pit end November (only two weeks tests in B180) -Tile - EB A assembly start in pit in November FCAL A ready for insertion Mandelli L. CSN1-Aprile05 Atlas INFN Precision Muon chamber production MDT Chamber Production (w/o EE) Atlas INFN 1200 Bare MDT Plan Bare MDT MDT with FC Plan MDT with FC Integrated MDT Plan Integrated MDT Ready for Installation MS 1000 No. Chambers 800 600 400 200 0 Jan 00 Jan 01 Jan 02 Jan 03 Time Jan 04 Jan 05 Jan 06 MDT (B & EC) progressing well 22 muon stations (MDT + RPC) already installed CSC ( at large h) already finished in September Mandelli L. CSN1-Aprile05 Installation activity planning in the cavern (part II) Mar '06 Apr '06 May '06 Jun '06 Jul '06 Aug '06 Sep '06 Oct '06 Nov '06 Dec '06 Jan '07 Feb '07 Mar '07 Apr '07 May '07 Atlas INFN 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 BT full power Full magnet test Big Wheels A Small Wheel A Global Commissioning Cosmic Tests Endcap Toroid C Big Wheels C J Endcap Toroid C T cooldown & testing C Small Wheel C VA VT EO, side C JF (JT) JF ID C Pixel Endcap Cal. C testing & commissioning global tests, pump down & bake out Full magnet test ID connection, testing & commissioning Barrel Side C VJ 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Mar '06 Apr '06 May '06 Jun '06 Side A VJ Endcap Cal. A services connection, testing & commissioning ID B EO, side A Beam pipe (JT) VT JF VA Big Wheel A, step 1 ID A J T A JF Endcap Toroid A cooldown & testing Endcap Toroid A Jul '06 Aug '06 Sep '06 Oct '06 Nov '06 Dec '06 Mandelli L. CSN1-Aprile05 Jan '07 Feb '07 Mar '07 Apr '07 May '07 Inner Detector- Barrel: Pixels: Progress on all aspects of the sub-system for 3 layers On schedule (v. C.Meroni) SCT: Module assembling of the 4 barrel cylinders ongoing B3 finished, tested, and is now at CERN. 3/‰ dead channels B5&B6 in time. B4 late. Recovery plan TRT: Atlas INFN First complete SCT barrel cylinder All modules mounted and tested into support structure. Electronic and cooling partially installed Barrel tracker in the pit March 06 Mandelli L. CSN1-Aprile05 TRT barrel support with all modules End-CapTRT End Cap-C: All wheels produced. Stacking advanced and will terminate in April End Cap-A: Stacking will start in May . Critical but “still ok” C-type wheels remain staged (funding) It is possible that Atlas will never have CWheels ( Stop workshops, Materials etc.) If done insertion could be 2012 but than…. End-Cap SCT End Cap-C : Disk 8&9 completed. Others are following. Tight but ok. End Cap-A : Late by 5m. Recovery plan in construction EC-C in pit May 06 EC-A in pit June 06 Mandelli L. CSN1-Aprile05 Atlas INFN ATLAS End-Cap Toroids Atlas INFN All 16 coils for both ECTs are impregnated (where 10 in Assisi), and the last ones will be delivered to CERN now. Both ECT vacuum vessels have been at CERN since long, including thermal shields and super-insulations, as well as all components for the assembly of the first ECT The cold mass (single) assembly for the first one (ECT-A) has started in Hall 191. Scheduled for cold mass completion in May, insertion into vacuum vessel in summer (on schedule), in the pit in March06. EC-C will follow. Completion in November 2005, in the pit in June06. No cryo test on surface Mandelli L. CSN1-Aprile05 Pre-assembly of the end-cap muon ‘Big-Wheels’ Atlas INFN TGC end-cap trigger chamber production is nearing completion Tooling available at CERN Preassembly starting in B180 72 TGC sectors and 32 MDT have to pre assembled from Q2 2005 to Q3 2006 (15 months) Big-Wheel sector assembly tooling Mandelli L. CSN1-Aprile05 Overall summary installation schedule version 7.0 Atlas INFN Mandelli L. CSN1-Aprile05 Financial situation No either good or bad news on financial status: cash flow problemAtlas INFN expected, CtC confirmed, deferrals mechanism slowly in action etc. Updating expected at next RRB 100 tile 90 80 LAr 70 CP 85% Total Commisioned. Mu 60 50 40 Total 30 ID 20 TDAQ 10 0 1998 1999 2000 2001 2002 2003 Mandelli L. CSN1-Aprile05 2004 ATLAS combined test beam in 2004 Atlas INFN All ATLAS sub-detectors integrated and run together with common DAQ. Geant4 simulation of test-beam set-up Gained lot of operation experience during ~ 6 month run Common ATLAS software used to analyze the data ~ 90 million events collected ~ 4.5 TB of data: y x e, 1 250 GeV , , p up to 350 GeV g ~ 30 GeV B-field = 0 1.4 T z Mandelli L. CSN1-Aprile05 ATLAS 9 GeV pion track in Pixels, SCT, TRT (B=1.4 T) Atlas INFN A few very preliminary results ATLAS z-position: muon system vs Inner Detector ATLAS LVL1 trigger vs ECAL energy 25 ns beam structure ATLAS ECAL vs HCAL energy 150 GeV , h=1.2 Mandelli L. CSN1-Aprile05 Collaboration Board (Chair: S. Bethke Deputy: C. Oram) CB Chair Advisory Group ATLAS Plenary Meeting Resources Review Board Atlas INFN Spokesperson (P. Jenni Deputies: F. Gianotti and S. Stapnes) Technical Co-ordinator Resources Co-ordinator (M. Nessi) (M. Nordberg) ATLAS Appointments INFN: 3/28 ok ! Executive Board (March 2005) Inner Detector (L. Rossi, K. Einsweiler M. Tyndel, F. Dittus) Tile Calorimeter Magnet System (B. Stanek) (H. ten Kate) LAr Calorimeter Muon Instrum. (H. Oberlack, D. Fournier, J. Parsons) Trigger/DAQ (G. Mikenberg, (C. Bee, N. Ellis, F. Taylor, Mandelli L. CSN1-Aprile05 L. Mapelli) S. Palestini) Physics Co-ordination Electronics Co-ordination (G. Polesello) (P. Farthouat) Computing Co-ordination Additional Members (D. Barberis, D. Quarrie) (H. Gordon, A. Zaitsev) ATLAS Italia Atlas INFN Responsabile L.Mandelli Pixel C.Meroni Tri-DAQ V.Vercesi LAr G.Costa Tiles DelPrete Comp-SW L. Luminari Magnete G.Volpini MDT M.Livan Ricercatori: 147 FTE / 179 Tecnologi: 29 FTE / 47 Mandelli L. CSN1-Aprile05 RPC R.Santonico Conclusions ATLAS progredisce bene e pianifica la chiusura del rivelatore per Aprile 2007 Tutti i rivelatori stanno facendo il massimo per rispettare la tempistica della V7.0 anche se obbiettivamente i tempi sono molto stretti, si stanno anche prendendo dei rischi e non ci sono margini Sicuramente con un sistema così complesso arriveranno inconvenienti, ma fino ad oggi la collaborazione ha mostrato una grande capacità di reazione. Il lungo periodo di costruzione sta terminando e l’atmosfera si fa eccitante Atlas Italia (giovani e meno giovani) è pienamente motivata Abbiamo bisogno della vostra critica, ma anche del vostro pieno supporto (come già avuto ) per mettere a frutto il notevolissimo contributo dato fino ad oggi Mandelli L. CSN1-Aprile05 Atlas INFN